X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20551

Well Details

Well ID: 37-115-20551
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lenox Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148599
Farm/Lease Name: J ZICK 7
License Status: Active
Spud Date: 2011-08-15
Permit Date: 2011-04-15
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.725514
Longitude: -75.718575

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-10-19 2011-10-19 7297.00 4,881,744.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
CI-14 Baker Hughes Corrosion Inhibitor Propargyl alcohol 5.00 0.00004000
Methanol 67-56-1 68.00 0.00059000
15 HCl Baker Hughes Acid Package Hydrochloric acid 7647-01-0 15.00 0.08
Clay Master-5C Baker Hughes Clay Stabilization No hazardous ingredients 0.00058000
GW-3LD Green Baker Hughes Gellant Guar gum 9000-30-0 60.00 0.00376000
Naphtha, petroleum, hydrotreated heavy 64742-48-9 60.00 0.00376000
Ferrotrol 300L Baker Hughes Iron Control Product Citric acid 77-92-9 70.00 0.00088000
FRW-26 Baker Hughes Friction Reducer Ethylene glycol 107-21-1 3.00 0.00010000
Scaletrol 720 Baker Hughes Scale Inhibitor Diethylene glycol 111-46-6 5.00 0.00053000
Ethylene glycol 107-21-1 35.00 0.00368000
Sand (Proppant) Proppant 100.00 11.50
Alpha 1427 Baker Hughes Antibacterial Agent Glutaraldehyde 111-30-8 30.00 0.00686000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00229000
Ethanol 64-17-5 5.00 0.00114000
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 7.00 0.00160000
Water Carrier/Base Fluid 100.00 88.34
GBW-15C Baker Hughes Breaker Sodium chloride 7647-14-5 15.00 0.00026000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 2,307,447.60 292 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 1,346,705.27 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 935,197.16 354 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 570,548.88 361 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 555,244.77 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 408,585.43 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 382,630.00 363 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 89,398.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-S02 Drill Cuttings (in Tons) 2.46 Tons LANDFILL 100081
2011-S02 Drill Cuttings (in Tons) 232.81 Tons LANDFILL 101247
2011-S02 Drill Cuttings (in Tons) 1.06 Tons LANDFILL 101534
2011-S02 Drill Cuttings (in Tons) 1,158.90 Tons LANDFILL THR029
2011-S02 Drilling Fluid Waste (in Barrels) 1,276.66 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S02 Fracing Fluid Waste (in Barrels) 7,129.69 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S02 Fracturing Fluid Waste (in Tons) 22.49 Tons LANDFILL 100081
2012-S01 Basic Sediment (in Barrels) 0.16 Bbl LANDFILL 100081
2012-S01 Basic Sediment (in Barrels) 7.09 Bbl LANDFILL 101534
2012-S01 Fracing Fluid Waste (in Barrels) 35.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Fracturing Fluid Waste (in Tons) 0.01 Tons LANDFILL 100081
2012-S01 Fracturing Fluid Waste (in Tons) 0.11 Tons LANDFILL 101534
2012-S01 Produced Fluid (in Barrels) 680.60 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Basic Sediment (in Barrels) 0.92 Bbl LANDFILL 100081
2012-S02 Basic Sediment (in Barrels) 0.73 Bbl LANDFILL 101534
2012-S02 Basic Sediment (in Barrels) 8.56 Bbl LANDFILL THR029
2012-S02 Produced Fluid (in Barrels) 1,010.51 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 514.36 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013-S02 Produced Fluid (in Barrels) 97.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013-S02 Produced Fluid (in Barrels) 584.12 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014-S01 Produced Fluid (in Barrels) 497.23 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014-S02 Produced Fluid (in Barrels) 356.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015-S01 Produced Fluid (in Barrels) 235.37 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015-S02 Produced Fluid (in Barrels) 5.19 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015-S02 Produced Fluid (in Barrels) 109.54 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016-S01 Produced Fluid (in Barrels) RWC 802 122.01 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016-S02 Produced Fluid (in Barrels) RWC 802 7.93 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016-S02 Produced Fluid (in Barrels) RWC 802 88.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M01 Produced Fluid (in Barrels) RWC 802 4.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M01 Produced Fluid (in Barrels) RWC 802 5.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M02 Produced Fluid (in Barrels) RWC 802 5.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M02 Produced Fluid (in Barrels) RWC 802 2.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M03 Produced Fluid (in Barrels) RWC 802 4.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M03 Produced Fluid (in Barrels) RWC 802 17.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M04 Produced Fluid (in Barrels) RWC 802 9.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M05 Produced Fluid (in Barrels) RWC 802 14.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M06 Produced Fluid (in Barrels) RWC 802 13.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M07 Produced Fluid (in Barrels) RWC 802 28.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M08 Produced Fluid (in Barrels) RWC 802 12.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M09 Produced Fluid (in Barrels) RWC 802 35.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M10 Produced Fluid (in Barrels) RWC 802 7.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M12 Produced Fluid (in Barrels) RWC 802 6.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M01 Produced Fluid (in Barrels) RWC 802 6.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M02 Produced Fluid (in Barrels) RWC 802 6.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M03 Produced Fluid (in Barrels) RWC 802 22.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M04 Produced Fluid (in Barrels) RWC 802 6.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M05 Produced Fluid (in Barrels) RWC 802 2.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M05 Produced Fluid (in Barrels) RWC 802 1.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-M06 Produced Fluid (in Barrels) RWC 802 2.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M07 Produced Fluid (in Barrels) RWC 802 2.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M08 Produced Fluid (in Barrels) RWC 802 2.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M09 Produced Fluid (in Barrels) RWC 802 1.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M10 Produced Fluid (in Barrels) RWC 802 4.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M11 Produced Fluid (in Barrels) RWC 802 8.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M12 Produced Fluid (in Barrels) RWC 802 2.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-M01 Produced Fluid (in Barrels) RWC 802 3.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M02 Produced Fluid (in Barrels) RWC 802 3.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M03 Produced Fluid (in Barrels) RWC 802 4.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2000335 Primary Facility 2011-08-16 Drilling/Alteration No Violations Noted H&P 290 Company Man Richard Durant. Just set 5 1/2" and cemented. TOC approximately 3000'. Casing set at 11, 734'.Will be spudding Zick 7H later today. Checked cellars of 1H, 2H, 3H, 4H. No bubbling observed in any of these cellars. Secondary containment in good condition.
2000369 Primary Facility 2011-08-22 Drilling/Alteration No Violations Noted H&P 290. Finished cementing 13 3/8" last night. Set casing at 616'. Drilling on fluid. No bubbling reported. no pressure reported on vent lines. Have 9 5/8" x 5 1/2" and 13 3/8" x 9 5/8" vent lines connected to all existing wells. Floats held on cement job for 13 3/8". 60 bbls returned to surface.
2000380 Primary Facility 2011-08-29 Drilling/Alteration No Violations Noted Resumed drilling @ 12:50. Drilling out casing. Will run F.I.T. for approx. 5 - 15 mins at 200 lbs. Will drill to 1648' and set 9 5/8" casing. Will drill out intermediate with air to KOP.
2547808 Primary Facility 2016-12-21 Routine/Complete Inspection No Violations Noted The Department conducted an inspection of the COG Zick J Well Site on 12/21/16 to determine if the site is stable as has been indicated in the submitted Well Site Restoration Report. Overall, the site is stable with no violations noted. The site was partially snow covered with temporary BMPs still in place. All 5 wells associated with this site have been drilled and appear to be in production.
2584406 Primary Facility 2017-04-19 Routine/Complete Inspection No Violations Noted Inspection conducted on 3/8/17. The site is stable. All well cellars full of water with no bubbling evident. There was about 4" of water in the production tank containment. Conductivity was measured at 12 microsiemens.
2694553 Primary Facility 2018-02-13 Administrative/File Review No Violations Noted The Post-Drilling Well Site Restoration Report required as per 78a.65 was accepted. If you have any questions, please contact me.
2838110 Primary Facility 2019-02-07 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall the site has good stabilization. No E&S issues identified. No violations noted.

For data sources see[7]

References