If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-163-20804 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.361308623,"lon":-82.49564978,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Vinton | |
Municipality: Swan Township | |
Operator Name: F R N ERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: EAGLE JOE | |
License Status: Producing | |
License Date: 1983-01-06 | |
Spud Date: 1983-02-02 | |
Spud Drilling Contractor: DYNAMIC DRILLING | |
Final Drill Date: 1983-02-05 | |
Well Total Depth: 2950 ft | |
Configuration: Vertical | |
Latitude: 39.361308623 | |
Longitude: -82.49564978 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1983-01-06 | 182 BELDEN & BLAKE CO GeoDate 1/6/83 |
Oil and Gas | 1983-01-06 | Issued Date 12/30/82 Expired Date 6/28/83 Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 02950 Proposed Drill Depth 02950 |
Original Spud | 1983-02-03 | |
Completed | 1983-02-05 | |
Reached Total Depth | 1983-02-05 | |
Completion Report Received | 1983-02-08 | |
Construction Permit Expires | 1983-06-28 | |
CO | 1994-10-25 | 4381 PELICAN PRODUCING INC GeoDate 1/6/83 |
CO | 1996-12-10 | 5244 SABRE ENERGY CORPORATION GeoDate 1/6/83 |
Change of Owner | 2001-11-14 | Operator changed from 5244, SABRE ENERGY CORPORATION to 7076, FRNERGY LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 2804 | 2834 | 0 |
2006-09-11 | 2815 | 2834 | 13 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 575 Mscf | 0 | |||
H2O | 0 | 12000 Gal | 60000 | FRAC: 575M N2, 12MG H2O, 60M SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | BENATTY CORP | 4397 | 0 | 0 |
1985 | BENATTY CORP | 3873 | 0 | 0 |
1987 | BENATTY CORP | 3434 | 0 | 365 |
1990 | BELDEN & BLAKE CORPORATION | 4665 | 0 | 215 |
1991 | BELDEN & BLAKE CORPORATION | 4403 | 0 | 365 |
1992 | BELDEN & BLAKE CORPORATION | 4090 | 0 | 366 |
1993 | BELDEN & BLAKE CORPORATION | 2151 | 0 | 340 |
1994 | PELICAN PRODUCING INC | 2333 | 0 | 365 |
1995 | PELICAN PRODUCING INC | 1410 | 0 | 365 |
1996 | SABRE ENERGY CORPORATION | 1536 | 0 | 365 |
1998 | SABRE ENERGY CORPORATION | 1264 | 0 | 365 |
1999 | SABRE ENERGY CORPORATION | 165 | 0 | 0 |
2000 | HUCK THOMAS | 0 | 0 | 0 |
2003 | F R N ERGY LLC | 2005 | 0 | 365 |
2004 | F R N ERGY LLC | 1369 | 0 | 365 |
2005 | F R N ERGY LLC | 0 | 0 | 0 |
2006 | F R N ERGY LLC | 0 | 0 | 0 |
2007 | F R N ERGY LLC | 0 | 0 | 0 |
2008 | F R N ERGY LLC | 0 | 0 | 0 |
2009 | F R N ERGY LLC | 0 | 0 | 0 |
2010 | F R N ERGY LLC | 0 | 0 | 0 |
2011 | F R N ERGY LLC | 0 | 0 | 0 |
2012 | F R N ERGY LLC | 0 | 0 | 0 |
2013 | F R N ERGY LLC | 0 | 0 | 0 |
2015 | F R N ERGY LLC | 135 | 0 | 365 |
2016 | F R N ERGY LLC | 138 | 0 | 365 |
2017 | F R N ERGY LLC | 122 | 0 | 365 |
2018 | F R N ERGY LLC | 118 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | BENATTY CORP | Brine | 0 | 0 |
1985 | BENATTY CORP | Brine | 0 | 0 |
1987 | BENATTY CORP | Brine | 0 | 365 |
1990 | BELDEN & BLAKE CORPORATION | Brine | 0 | 215 |
1991 | BELDEN & BLAKE CORPORATION | Brine | 11 | 365 |
1992 | BELDEN & BLAKE CORPORATION | Brine | 0 | 366 |
1993 | BELDEN & BLAKE CORPORATION | Brine | 0 | 340 |
1994 | PELICAN PRODUCING INC | Brine | 0 | 365 |
1995 | PELICAN PRODUCING INC | Brine | 0 | 365 |
1996 | SABRE ENERGY CORPORATION | Brine | 0 | 365 |
1998 | SABRE ENERGY CORPORATION | Brine | 0 | 365 |
1999 | SABRE ENERGY CORPORATION | Brine | 0 | |
2000 | HUCK THOMAS | Brine | 0 | |
2003 | F R N ERGY LLC | Brine | 0 | 365 |
2004 | F R N ERGY LLC | Brine | 0 | 365 |
2005 | F R N ERGY LLC | Brine | 0 | 0 |
2006 | F R N ERGY LLC | Brine | 0 | 0 |
2007 | F R N ERGY LLC | Brine | 0 | 0 |
2008 | F R N ERGY LLC | Brine | 0 | 0 |
2009 | F R N ERGY LLC | Brine | 0 | 0 |
2010 | F R N ERGY LLC | Brine | 0 | 0 |
2011 | F R N ERGY LLC | Brine | 0 | 0 |
2012 | F R N ERGY LLC | Brine | 0 | 0 |
2013 | F R N ERGY LLC | Brine | 0 | 0 |
2015 | F R N ERGY LLC | Brine | 0 | 365 |
2016 | F R N ERGY LLC | Brine | 0 | 365 |
2017 | F R N ERGY LLC | Brine | 0 | 365 |
2018 | F R N ERGY LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL2273 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0020902414 | 2018-02-01 | Production Wells | No Violations | On the day of this inspection, I found an oil and gas well consisting of 4.5-inch diameter casing, 2-inch diameter tubing and a plunger lift system. The tank battery consists of a vertical separator, a drip, an orifice chart meter and one 100-barrel steel tank. |
1580402934 | 2018-02-05 | Production Wells | No Violations | On the day of this inspection, I found an oil and gas well equipped with 4.5 inch diameter casing, 2 inch diameter tubing and a plunger lift system. The tank battery consisted of a vertical separator, a drip, orifice chart meter and 1-100 barrel steel tank. Identification is legible and posted at wellhead. |
For data sources see[9]