{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.784464429,"lon":-81.27789328,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: 001183 | |
Farm/Lease Name: ULRICH UNIT | |
License Status: Producing | |
License Date: 2016-02-22 | |
Spud Date: 2014-12-11 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-08-08 | |
Well Total Depth: 16745 ft | |
Configuration: Horizontal | |
Latitude: 39.784464429 | |
Longitude: -81.27789328 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-12-02 | Proposed Formations:POINT PLEASANT, Issued Date:12/2/2014, Expired Date:12/1/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-02-02 | Proposed Formations:POINT PLEASANT, Issued Date:2/2/2015, Expired Date:2/1/2017 12:00:00 PM, Drilling unit acres:574.075, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-08-08 | |
Correction to Well | 2015-11-06 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT, |
Completion Report Received | 2016-03-10 | |
Construction Permit Expires | 2017-02-01 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-03-11 | 9036 | 16654 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/18/2015 | 10/29/2015 | 8542 | 11,427,600.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.464 | 95,305,900.0 |
AI-302 | U.S. Well Services | Acid Corrosion Inhibitors | 2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.00006000 | 66.303 | |
Water | 7732-18-5 | 95 | 0.0004 | 419.919 | ||||
WFRA-405 | U.S. Well Services | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.02219 | 23375.8 | |
Water | 7732-18-5 | 60 | 0.05513 | 58076.4 | ||||
Ethoxylated alcohol blend | 68002-97-1 | 4 | 0.00368 | 3871.76 | ||||
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.02756 | 29038.2 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 8.99047 | 9,471,670.0 | |
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.04339 | 45711.5 | |
Water | 7732-18-5 | 87.5 | 0.18165 | 191368 | ||||
LGC-15 | U.S. Well Services | Gelling Agents | Petroleum Distillates | 64742-47-8 | 60 | 0.08067 | 84991.4 | |
Suspending agent (solid) | 14808-60-7 | 3 | 0.01303 | 13725.3 | ||||
Surfactant | 68439-51-0 | 3 | 0.00511 | 5384.55 | ||||
Guar Gum | 9000-30-0 | 50 | 0.08518 | 89742.5 | ||||
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00269 | 2834.93 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00471 | 4963.16 | ||||
SI-1100 | U.S. Well Services | Scale Inhibitor | Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.00081 | 848.386 | |
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.00081 | 848.386 | ||||
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00146 | 1540.15 | ||||
Potassium salt of diethylene triamine penta (methylene phosphonic acid) | 15827-60-8 | 7.5 | 0.00125 | 1321.53 | ||||
Ethylene Glycol | 107-21-1 | 25 | 0.0035 | 3687.22 | ||||
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00032 | 339.355 | ||||
Water | 7732-18-5 | 80 | 0.00991 | 10441.7 | ||||
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00205 | 2158 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | ||||
2015-10-18 | H2O | 15 | 6174 Bbl | 92100 | US Well Services Inc | STAGE 1/44
60 SHOTS STAGES 2-43 |
2015-10-29 | H2O | 15 | 5674 Bbl | 230100 | US Well Services Inc | STAGE44/44
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 0 | 0 | 28 |
2016 | ANTERO RESOURCES CORPORATION | 3045039 | 367 | 363 |
2017 | ANTERO RESOURCES CORPORATION | 1145878 | 224 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 781656 | 343 | 363 |
2019 | ANTERO RESOURCES CORPORATION | 157878 | 120 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 0 | 28 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 73879 | 363 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 5838 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 3688 | 363 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 747 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0068582795 | 2015-03-01 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current well bore drilling status found Sidewinder Drilling rig #54 on location drilling the 12.250 2nd intermediate wellbore at a current measured depth of 4,937with a current wellbore directional azimuth of 86 degrees and a 11 degree nudge started at a depth of 2,175 placing the well bore at 67 off center line following the proposed submitted wellbore plan. |
0078017505 | 2015-02-17 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig is currently rigging up. The company representative anticipates beginning to drill the surface hole late tonight. |
0866503653 | 2018-03-02 | Production Wells | No Violations | Status check inspection found the well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section and a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 0 (psi) pound per square inch indicated between the 9.65 and 13.375 and 0 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (4) gas processing units one for each well head on location. At the right front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site. 3 additional cellars were set on the pad but only one additional well was spudded. |
0874778107 | 2019-02-07 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (1) with conductor only, (4) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. |
1074825355 | 2015-03-04 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling process found Sidewinder drilling rig # 54 on location drilling the 12.250 2nd intermediate well bore at a current depth of 7,084 with a proposed total depth to be drilled of 7,441. |
1182426826 | 2014-12-12 | Casing String Witnessed | No Violations | I am onsite to witness the casing installation and cementing operations of the conductor casing string. Express Energy Services drilled 100 of 32 hole with an auger rig. Express then ran 100 of 26 .375 wall weld casing in the well. The cement mix water was tested with a low range Quantab and registered 82 parts per million total chlorides. The casing was cemented by circulating 330 sacks of class A cement with .5 pounds per sack flowseal and 2% CaCl into the annular space. I witnessed 11 barrels of cement return to surface and remain static. Three feet of cement was left in the cellar to ensure a liquid tight seal. |
1422545901 | 2015-03-08 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling process found Sidewinder Drilling rig # 54 on location and the 12.250 2nd intermediate well bore total drilling depth recently reached at 7,505 with 7,474 of 9.625 40# casing ran in the well bore and cemented by CalFrac cement service on 03/06/2015. |
1424339719 | 2015-02-19 | Casing String Witnessed | No Violations | 02/19/2015 Sidewinder drilling rig # 54 is now on location and has drilled a 359 x 24 surface borehole and ran 354 of 18.625 surface casing. Calfrac Cement Service was on location to cement the casing using 593 sacks of class A-3% calcium-.25 pps celloflake 70% open hole excess cement with the cement mix water tested for PH & Chlorides and circulation established prior to cementing with good cement returns witnessed to surface and the casing pressure tested to 500 psi over lift pressure. |
1424808505 | 2015-02-24 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling progress found Sidewinder drilling rig 54 on location with the 17.5 1st intermediate well bore drilling depth recently reached at 2,104 and 2,088 of 13.375 J-55 casing set and cemented to surface by Calfrac cement service. The rig is hooking up the Blow Out Preventer and preparing to begin drilling the 12.250 2nd intermediate wellbore. |
1455734328 | 2016-02-17 | Preliminary Restoration | No Violations | Preliminary Restoration and status check inspection to document the well drilling and completion process is now complete with the well now in line and capable of production. The well is in the completion flow back testing stages and is being flowed through 2 vertical sand trap separators and a gas processing unit. Addressing the production fluid storage tank pad which is adjacent to the well pad, upon inspection of the production fluid facility a total of (8) Eight -400 barrel capacity tanks are present in a polymer lined metal containment dike area with proper identification posted. Addressing the Preliminary Restoration- upon inspection it was observed that the area affected by the well pad construction has proper vegetation established with erosion control in place. |
1896367580 | 2015-10-23 | Completion Testing | No Violations | My inspection today finds US Well Service is providing hydraulic stimulation services on stage 20. All volumes and pressures will be recorded in the stimulation report. |
2048308553 | 2016-04-21 | Preliminary Restoration | No Violations | Upon inspection it was observed that the area affected by the well pad construction has erosion control and vegetation established and the site meets ORC 1509.072. Also noted the landowner-farmer has began to till the ground along the lease road in preparation of the planting process. Addressing the well head- The drilling and completion process is now compete and the well is in production with 4 dehydration units on location supporting each of the existing wells present. A total of 8-400 barrel capacity production tanks are present at a separate production pad at the rear and adjacent to the well pad. |