If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24526 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.773871842,"lon":-81.29776914,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Franklin Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: 001132 | |
Farm/Lease Name: DIMMERLING UNIT | |
License Status: Producing | |
License Date: 2015-10-02 | |
Spud Date: 2014-10-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-04-12 | |
Well Total Depth: 16073 ft | |
Configuration: Horizontal | |
Latitude: 39.773871842 | |
Longitude: -81.29776914 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-25 | Proposed Formations:POINT PLEASANT, Issued Date:9/25/2014, Expired Date:9/24/2016 12:00:00 PM, Drilling unit acres:370.772, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-12-18 | Proposed Formations:POINT PLEASANT, Issued Date:12/18/2014, Expired Date:12/17/2016 12:00:00 PM, Drilling unit acres:468.566, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-04-12 | |
Correction to Well | 2015-10-02 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-02-11 | |
Construction Permit Expires | 2016-12-17 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-02-11 | 8349 | 15875 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/04/2015 | 12/13/2015 | 8249 | 11,452,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00222 | 2350 |
AI-302 | U.S. Well Services | Acid Corrosion Inhibitors | Water | 7732-18-5 | 95 | 0.00066 | 697.224 | |
2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.0001 | 110.088 | ||||
LGC-15 | U.S. Well Services | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.00537 | 5687.48 | |
Suspending agent (solid) | 14808-60-7 | 3 | 0.0137 | 14497.5 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.08482 | 89772.9 | ||||
Guar Gum | 9000-30-0 | 50 | 0.08956 | 94791.3 | ||||
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00244 | 2585.07 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00428 | 4525.71 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.2396 | 95,510,800.0 | |
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.25695 | 9,797,680.0 | |
SI-1100 | U.S. Well Services | Scale Inhibitor | Potassium salt of diethylene triamine penta (methylene phosphonic acid) | 15827-60-8 | 7.5 | 0.00133 | 1403.43 | |
Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.00085 | 900.97 | ||||
Ethylene Glycol | 107-21-1 | 25 | 0.0037 | 3915.76 | ||||
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00155 | 1635.61 | ||||
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.00085 | 900.97 | ||||
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00034 | 360.388 | ||||
Water | 7732-18-5 | 80 | 0.01048 | 11088.9 | ||||
WFRA-405 | U.S. Well Services | Friction Reducer | Water | 7732-18-5 | 60 | 0.04702 | 49764.8 | |
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.01892 | 20030.3 | ||||
Ethoxylated alcohol blend | 68002-97-1 | 4 | 0.00313 | 3317.65 | ||||
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.02351 | 24882.4 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.03636 | 38488.2 | |
Water | 7732-18-5 | 87.5 | 0.15224 | 161128 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-12-04 | H2O | 15 | 63180 Bbl | 246040 | US Well Services Inc | STAGE 1/43
60 SHOTS STAGES 2-42 SEE IMAGES |
2015-12-13 | H2O | 15 | 5750 Bbl | 240330 | US Well Services Inc | STAGE 43/43
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 0 | 0 | 92 |
2016 | ANTERO RESOURCES CORPORATION | 2363749 | 204 | 362 |
2017 | ANTERO RESOURCES CORPORATION | 914357 | 239 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 572503 | 203 | 362 |
2019 | ANTERO RESOURCES CORPORATION | 110635 | 84 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 0 | 92 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 49047 | 362 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 5818 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 3464 | 362 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 616 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0492536927 | 2015-03-25 | Drill / Deepen / Reopen | No Violations | Status check on site inspection of the current drilling process. On this day I was accompanied by ODNR Regional Supervisor Brent Bear with the following found upon inspection. Patterson rig 332 is on location and due to recent well bore gas influx issues the drill string is out of the hole and the company has loaded the well bore to a static point with 15.3# drilling mud and set a 9.625 8,500 psi retrievable bridge plug at 6,500 and currently has Greens Energy Service on location pressure testing the Blow Out Preventer stack before drilling ahead. |
0655904196 | 2014-12-28 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling progress found Patterson drilling rig #332 on location drilling the 17.5 1st intermediate well bore section at a depth of 1,332 with a projected total depth to be drilled of 2,059 of this section. |
0806283892 | 2015-03-24 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig is currently reducing the drilling mud weight. Once the mud is at the proper weight the rig crew will pull the casing out of the hole in preparation for setting a wireline bridge plug in the 9.625 casing. |
1151378581 | 2015-01-04 | Drill / Deepen / Reopen | No Violations | Status check inspection n the current drilling process found Patterson Rig #332 on location drilling the 12.250 2nd intermediate well bore section at a depth of 6,579. The rig is down for repairs at the time of inspection and will TD this section at 7,073 once they are back up and running. |
1154222273 | 2015-03-20 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling process and well bore gas influx issue found the current drilling depth to be 12,842 in the 8.750 horizontal wellbore section in the directional azimuth of 331.02 degrees with a true vertical depth of 8,183. The well head blow out preventer is in the close position and the backside is also shut in due to Patterson Drilling rig 332 having the main rig circulating Kelly hose fail. The current annular pressure is 2,000 psi. |
1181295914 | 2018-03-02 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section and a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 425 (psi) pound per square inch indicated between the 9.65 and 13.375 and 800 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (5) gas processing units one for each well head on location. At the left front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site. |
1210204780 | 2015-03-22 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling status found Patterson Drilling rig 332 on location with the current total measured depth drilled of 12,842 with the drilling assembly currently one drill stand off bottom and free. While conditioning the wellbore during a gas influx, circulation was lost due to a formation breakdown at the 9.625 casing shoe with 456 barrels of 15.5# oil based drilling mud being lost in the well bore. A 34 pound per barrel LCM mixture was added to the total mud volume. The company is currently awaiting additional drilling fluids before they pull the drill string out of the hole and set a 9.625 bridge plug @ 6,500 to isolate the wellbore formation in order to retest the well surface control equipment. |
1409070954 | 2014-10-31 | Casing String Witnessed | No Violations | The said well was spudded on 10/28/14 by Rocky Mountain Drillings top hole rig. The company man called @ 6:10 am on 10/31/14 and reported they had been in solid bedrock for the last 14 hours and were unable to drill deeper than 87, I granted them permission to set the casing there. On 10/31/14 at 12:00 pm I arrived on location to witness the 26 conductor cement job with 90 of 102# weld connection pipe being set and cemented by Allied Cement Service using 560 sacks of class A-2% calcium .25 pps lcm with no cement returns to surface. We will wait on the cement to set up and pressure test the internal of the casing to verify the shoe is sealed, if the casing does not tests and takes fluid we will re cement the casing again, if it tests the casing shall be grouted on the annular side through a 1.250 solid string. |
1414859531 | 2014-11-01 | Casing String Witnessed | No Violations | On site inspection to witness the 26 conductor hole cement top off job. On 10/31/2014 the conductor was cemented with no cement returns to surface. On this day the casing was pressure tested to verify the shoe was properly cemented, with no recorded pressure loss. The annular side of the casing was then grouted through 1 tubing set at 25 with cement verified to surface. |
1415280599 | 2014-10-29 | Drill / Deepen / Reopen | No Violations | Status check inspection on the conductor borehole drilling progress found Rocky Mountain Drillings top hole rig on the hole drilling the conductor borehole at 82 using a 32 diameter drill bit. The well pad site was built on a old mine quarry and the company man was informed that the conductor shall be set into bedrock. The freshwater was encountered at 9. |
1419592267 | 2014-12-26 | Drill / Deepen / Reopen | No Violations | Status check inspection and documentation of the recently set and cemented surface casing cement job. On 12/25/2014 358 of 18.625 surface casing was set and cemented to surface by Allied Cement services with good cement returns documented to surface. Patterson Drilling rig 332 is the rig on the hole and is currently preparing to drill out from under the surface casing. |
1428529894 | 2015-04-08 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Patterson Drilling rig # 332 on the hole with the 8.750 well bore total measured depth reached on 04/03/2015 at 16,073. The company is currently running the 5.5 production casing in the hole at a depth of 9,696 with the well control Blow Out Preventer in the close position and the company flaring gas through the well control choke valve with a annular 5.5 casing pressure currently of 1,700 psi. The company is attempting to circulate with 14.9# synthetic oil base mud with loss circulation material added also. The rig has been on the hole now for 45 days drilling the production borehole and has experienced high 3rd party gas influx to an extent the well has reportedly consumed over 5,000 bbl of drilling mud. No violations were noted on the day of my inspection. |
1428718546 | 2015-04-10 | Casing String Witnessed | No Violations | 04/10/2015 On site inspection to witness the 5.5 production long string cement job, Patterson Drilling rig 332 has drilled the production borehole to a measured depth of 16,073 and ran 16,058 of 5.5 production casing with the wellbore pressure now static prior to cementing with circulation established prior to cementing. CalFrac cement service is the cementing company on location running 80 bbl of 6% gel with 3 pound per barrel LCM and 40% open hole cement excess volume with a 1035 sack @ 15.2 ppg and 1.26 yield lead and 1860 sack @ 15.2 ppg and 1.84 tail cement mix ran. Circulation to surface was not established and the final lift pressure was 4,300 psi and the plug was bumped to 5,800 and the well shut in for 8 hrs as a precautionary measure. In conversation with Anteros drilling supervisor James Harvey the well shall be monitored for annular pressure and bond logged before stimulation begins. |
1478415235 | 2019-02-07 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (5) producing wells, (5) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 400 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 400 psi. |
1501606607 | 2016-02-17 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. Addressing the well status, The well drilling and completion process is now complete and all (5) of the wells on the pad are capable of production and are currently in the flow back testing stages with a company on location identified as Solid Oak flow back services monitoring the well testing. There is 3 vertical sand trap separators and 5 gas processing units on location with the sand trap separators being evacuated into a 500 barrel tank. Addressing the production fluid storage area- A total of (8) 400 barrel capacity tanks are present inside a polymer lined steel containment dike area. |
1695306942 | 2015-04-02 | Drill / Deepen / Reopen | No Violations | Status check inspection of the drilling process found Patterson rig #332 on location drilling the 8.750 production borehole at a current measured depth of 15,985 The company is currently circulation a gas influx out of the hole with 6619 units of 3rd party gas and a stand pipe pressure of 1300 psi, the drilling mud weight is 14.6# going in and 14.5# out of the well bore. The company is currently adding 10% lcm @ 20# pound per barrel measured weight. The Blow out Preventer is open and they are circulation out through their gas buster. TD will be 16,606. |
For data sources see[10]