X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-37482

Well Details

Well ID: 37-063-37482
Loading map...
Operator Name: XTO ENERGY INC
First Permit Date: 2013-03-18
Last Permit Date: 2013-03-18
Spud Date: 2013-07-12
Unconventional: Yes
Horizontal: No
Violations: None
Latitude: 40.576788
Longitude: -79.246958

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-2 DRILL CUTTINGS 1469.0 Tons LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2184969 2013-07-02 Indiana Center Twp No Violations Noted
2185111 2013-07-16 Indiana Center Twp No Violations Noted
2185114 2013-07-18 Indiana Center Twp No Violations Noted
2186901 2013-07-26 Indiana Center Twp No Violations Noted
2186978 2013-07-12 Indiana Center Twp No Violations Noted
2189171 2013-07-18 Indiana Center Twp No Violations Noted
2195139 2013-08-09 Indiana Center Twp No Violations Noted
2195434 2013-07-30 Indiana Center Twp No Violations Noted
2204787 2013-09-04 Indiana Center Twp No Violations Noted
2207381 2013-09-23 Indiana Center Twp No Violations Noted
2212434 2013-10-09 Indiana Center Twp No Violations Noted
2215472 2013-09-04 Indiana Center Twp In Compliance with Policy
2226207 2013-11-26 Indiana Center Twp No Violations Noted
2226479 2013-11-26 Indiana Center Twp Viol(s) Noted & Immediately Corrected
2232574 2013-12-30 Indiana Center Twp No Violations Noted
2244661 2014-02-06 No Violations Noted RTPT inspt.

At time of inspection, well appears equipped for production.

Site ID sign present, in compliance with Act 9 standards. Drill permit, E&S/PCSM plan, PPC plan, ERP, ESCGP-1 all present at access road entrance.

Well tag present, legible. Wellhead surrounded by gate, cement barriers. Two brine tanks, production equipment located within lined, metal secondary containment unit. All sound.

Access road and well site currently snow-covered, therefore unable to adequately determine if any E&S concerns exist. Winter maintenance currently being performed on access road. AR gated.

References