X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626060402000

Well Details

Well ID: 0626060402000
Loading map...
Location: 00/02-04-062-06W6/0
Location Alias: 00/02-04-62-06 W6M
Location Alias 2: 00/02-04-062-06 W6/00
Province: Alberta
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA KAKWA 2-4-62-6
Operator Name: Jupiter Resources Inc.
License Number: 0426285
License Date: 2010-11-24
License Status: Amended
Spud Date: 2011-05-20
Final Drill Date: 2011-07-14
Well Total Depth: 5438 m
Surface Hole Latitude: 54.343495
Surface Hole Longitude: -118.859764

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2011-06-24 2979 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-14 Open Hole/Barefoot Completion 5315 5438 0
2011-11-13 Hydra Jet Perforation 5275 5275.1 0
2011-11-13 Fracture 5275 5275.1 0
2011-11-14 Hydra Jet Perforation 5165 5165.1 0
2011-11-14 Hydra Jet Perforation 5155 5155.1 0
2011-11-14 Hydra Jet Perforation 5073 5073.1 0
2011-11-14 Fracture 5073 5073.1 0
2011-11-14 Hydra Jet Perforation 4971 4971.1 0
2011-11-14 Fracture 4971 4971.1 0
2011-11-14 Hydra Jet Perforation 4865 4865.1 0
2011-11-14 Fracture 4865 4865.1 0
2011-11-15 Hydra Jet Perforation 4769 4769.1 0
2011-11-15 Fracture 4769 4769.1 0
2011-11-15 Hydra Jet Perforation 4668 4668.1 0
2011-11-15 Fracture 4668 4668.1 0
2011-11-15 Hydra Jet Perforation 4567 4567.1 0
2011-11-15 Fracture 4567 4567.1 0
2011-11-15 Hydra Jet Perforation 4465 4465.1 0
2011-11-15 Fracture 4465 4465.1 0
2011-11-15 Hydra Jet Perforation 4364 4364.1 0
2011-11-15 Fracture 4364 4364.1 0
2011-11-16 Hydra Jet Perforation 4263 4263.1 0
2011-11-16 Fracture 4263 4263.1 0
2011-11-16 Hydra Jet Perforation 4162 4162.1 0
2011-11-16 Fracture 4162 4162.1 0
2011-11-16 Hydra Jet Perforation 4061 4061.1 0
2011-11-16 Fracture 4061 4061.1 0
2011-11-16 Hydra Jet Perforation 3959 3959.1 0
2011-11-16 Fracture 3959 3959.1 0
2011-11-16 Hydra Jet Perforation 3858 3858.1 0
2011-11-16 Fracture 3858 3858.1 0
2011-11-16 Hydra Jet Perforation 3757 3757.1 0
2011-11-17 Fracture 3757 3757.1 0
2011-11-17 Hydra Jet Perforation 3656 3656.1 0
2011-11-17 Fracture 3656 3656.1 0
2011-11-17 Hydra Jet Perforation 3555 3555.1 0
2011-11-17 Fracture 3555 3555.1 0
2011-11-17 Hydra Jet Perforation 3467 3467.1 0
2011-11-17 Fracture 3467 3467.1 0
2011-11-17 Hydra Jet Perforation 3462 3462.1 0
2011-11-17 Fracture 3462 3462.1 0
2011-11-17 Hydra Jet Perforation 3365 3365.1 0
2011-11-18 Fracture 3365 3365.1 0
2011-11-18 Hydra Jet Perforation 3275 3275.1 0
2011-11-18 Fracture 3275 3275.1 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 458 6629.1 0.0 57.6
2012 6254 61445.9 0.0 498.5
2013 6883 33590.7 0.0 246.5
2014 8303 20933.9 0.0 148.7
2015 8735 14650.4 0.0 180.3
2016 8495 11422.8 0.0 160.3
2017 6887 8443.6 0.0 130.8
2018 7696 8618.2 0.0 163.9
2019 2098 1977.0 0.0 31.6

For data sources see[5]

References