X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816082213003

Well Details

Well ID: 0816082213003
Loading map...
Location: 00/13-22-081-08W6/3
Location Alias: 00/13-22-81-08 W6M
Location Alias 2: 00/13-22-081-08 W6/03
Province: Alberta
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ MULLIGAN 13-22-81-8
Operator Name:
License Number: 0462269
License Date: 2013-12-11
License Status: Suspension
Spud Date: 2013-12-16
Final Drill Date: 2014-01-11
Well Total Depth: 3094 m
Surface Hole Latitude: 56.027292
Surface Hole Longitude: -119.150031

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2014-01-02 845 Horizontal
2014-01-02 863
2014-01-05 1324 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-02-06 Multi-Stage Fracture 3066.4 3066.5 0
2014-02-08 Acid Treatment 3066.4 3066.5 0
2014-02-13 Multi-Stage Fracture 3007.8 3007.9 0
2014-02-13 Multi-Stage Fracture 2936.2 2936.3 0
2014-02-13 Multi-Stage Fracture 2878 2878.1 0
2014-02-13 Multi-Stage Fracture 2806.4 2806.5 0
2014-02-13 Multi-Stage Fracture 2748.1 2748.2 0
2014-02-13 Multi-Stage Fracture 2689.8 2689.9 0
2014-02-13 Multi-Stage Fracture 2618.2 2618.3 0
2014-02-13 Multi-Stage Fracture 2560 2560.1 0
2014-02-13 Multi-Stage Fracture 2501.7 2501.8 0
2014-02-13 Multi-Stage Fracture 2430.1 2430.2 0
2014-02-13 Multi-Stage Fracture 2371.9 2372 0
2014-02-13 Multi-Stage Fracture 2300.3 2300.4 0
2014-02-13 Multi-Stage Fracture 2242 2242.1 0
2014-02-13 Multi-Stage Fracture 2170.4 2170.5 0
2014-02-13 Multi-Stage Fracture 2112.2 2112.3 0
2014-02-13 Multi-Stage Fracture 2040.9 2041 0
2014-02-13 Multi-Stage Fracture 1969.3 1969.4 0
2014-02-14 Multi-Stage Fracture 1897.7 1897.8 0
2014-02-14 Multi-Stage Fracture 1826.1 1826.2 0
2014-02-14 Multi-Stage Fracture 1754.4 1754.5 0
2014-02-14 Multi-Stage Fracture 1682.2 1682.3 0
2014-02-14 Multi-Stage Fracture 1611.2 1611.3 0
2014-02-14 Multi-Stage Fracture 1539.6 1539.7 0
2014-02-14 Multi-Stage Fracture 1481.4 1481.5 0
2014-02-14 Multi-Stage Fracture 1423.1 1423.2 0
2017-08-10 Packing Device Capped w/Cement 1240 1269.8 0
2017-08-11 Perforation 1083 1088 13
2018-08-18 Packing Device Capped w/Cement 1065 1077 0
2018-08-21 Perforation 102 106 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2581 2628.7 0.0 2.5
2018 2183 601.4 0.0 0.2

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-11 No Incident N/A N/A
2014-02-26 No Incident N/A N/A
2017-08-14 No Incident N/A N/A

For data sources see[6]

References