If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0265033602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.26997,"lon":-114.291798,"icon":""}]} |
| Location: 00/02-36-026-03W5/0 | |
| Location Alias: 00/02-36-26-03 W5M | |
| Location Alias 2: 00/02-36-026-03 W5/00 | |
| Province: Alberta | |
| County/Municipality: Rocky View County | |
| Well Name: TRIOIL HZ LOCHEND 2-36-26-3 | |
| Operator Name: ORLEN Upstream Canada Ltd. | |
| License Number: 0431351 | |
| License Date: 2011-02-09 | |
| License Status: Suspension | |
| Spud Date: 2011-02-15 | |
| Final Drill Date: 2011-03-04 | |
| Well Total Depth: 3378 m | |
| Surface Hole Latitude: 51.26997 | |
| Surface Hole Longitude: -114.291798 |
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-02-20 | 1842 | Horizontal |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-03-06 | Slotted Liner | 2263.4 | 3378 | 0 |
| 2011-04-02 | Open Hole/Barefoot Completion | 3373 | 3378 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 3352.3 | 3352.4 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 3298.9 | 3299 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 3236.2 | 3236.3 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 3184.9 | 3185 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 3133.9 | 3134 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 3082.8 | 3082.9 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 3020.3 | 3020.4 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 2969.5 | 2969.6 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 2918.4 | 2918.5 | 0 |
| 2011-04-02 | Multi-Stage Fracture | 2868 | 2868.1 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2805.4 | 2805.5 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2754.5 | 2754.6 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2703.6 | 2703.7 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2641.6 | 2641.7 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2590.8 | 2590.9 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2539.6 | 2539.7 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2488.2 | 2488.3 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2425.9 | 2426 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2374.9 | 2375 | 0 |
| 2011-04-03 | Multi-Stage Fracture | 2323.7 | 2323.8 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 5586 | 357.0 | 0.0 | 30.1 |
| 2012 | 8734 | 384.5 | 0.0 | 0.0 |
| 2013 | 8715 | 531.2 | 0.0 | 0.0 |
| 2014 | 8649 | 521.0 | 0.0 | 0.0 |
| 2015 | 4007 | 206.5 | 0.0 | 0.0 |
For data sources see[5]