X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354051209000

Well Details

Well ID: 0354051209000
Loading map...
Location: 00/09-12-035-05W4/0
Location Alias: 00/09-12-35-05 W4M
Location Alias 2: 00/09-12-035-05 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: HIGH GROUND 2-13 H PROVOST 9-12-35-5
Operator Name: High Ground Energy Inc.
License Number: 0481451
License Date: 2016-11-15
License Status: Issued
Spud Date: 2016-12-20
Final Drill Date: 2016-12-30
Well Total Depth: 1676.5 m
Surface Hole Latitude: 51.998514
Surface Hole Longitude: -110.584715

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
20 Dec 2016 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-12-28 512
2016-12-29 907 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-13 Multi-Stage Fracture 1646.1 1646.2 0
2017-01-13 Multi-Stage Fracture 1602 1602.1 0
2017-01-13 Multi-Stage Fracture 1557.8 1557.9 0
2017-01-13 Multi-Stage Fracture 1513.6 1513.7 0
2017-01-13 Multi-Stage Fracture 1469.4 1469.5 0
2017-01-13 Multi-Stage Fracture 1425.2 1425.3 0
2017-01-13 Multi-Stage Fracture 1394.4 1394.5 0
2017-01-13 Multi-Stage Fracture 1363.5 1363.6 0
2017-01-13 Multi-Stage Fracture 1332.7 1332.8 0
2017-01-13 Multi-Stage Fracture 1301.8 1301.9 0
2017-01-13 Multi-Stage Fracture 1270.9 1271 0
2017-01-13 Multi-Stage Fracture 1240.4 1240.5 0
2017-01-13 Multi-Stage Fracture 1209.5 1209.6 0
2017-01-13 Multi-Stage Fracture 1178.6 1178.7 0
2017-01-13 Multi-Stage Fracture 1147.8 1147.9 0
2017-01-13 Multi-Stage Fracture 1116.9 1117 0
2017-01-13 Multi-Stage Fracture 1086 1086.1 0
2017-01-13 Multi-Stage Fracture 1055.2 1055.3 0
2017-01-13 Multi-Stage Fracture 1024.3 1024.4 0
2017-01-13 Multi-Stage Fracture 993.5 993.6 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
01/13/2017 01/13/2017 Sulfonic Acids (Petroleum) 61789-85-3 Demulsifier 0.0393 Canyon Technical Services
Iron Oxide 1309-37-1 3.4115 Canyon Technical Services
Aluminum Oxide 1344-28-1 20.4693 Canyon Technical Services
Crystalline silica. quartz 14808-60-7 20.4693 Canyon Technical Services
Iron Oxide 1309-37-1 20.4693 Canyon Technical Services
Titanium Oxide 13463-67-7 20.4693 Canyon Technical Services
Aluminum Oxide 1344-28-1 3.4115 Canyon Technical Services
Crystalline silica. quartz 14808-60-7 3.4115 Canyon Technical Services
Iron Oxide 1309-37-1 3.4115 Canyon Technical Services
Titanium Oxide 13463-67-7 3.4114 Canyon Technical Services
Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 Bactericide/Biocide 0.0116 Canyon Technical Services
Water 7732-18-5 Bactericide/Biocide 0.0116 Canyon Technical Services
Cellulase Enzyme Solution Not Available Breaker 0.0092 Canyon Technical Services
Ammonium Persulfate 7727-54-0 Breaker 0.0672 Canyon Technical Services
Non-hazardous base ingredient(s) Not Available Breaker 0.0672 Canyon Technical Services
Boric Acid 10043-35-3 Crosslinker 0.1415 Canyon Technical Services
Monoethanolamine 141-43-5 Crosslinker 0.1415 Canyon Technical Services
Water 7732-18-5 Crosslinker 0.1415 Canyon Technical Services
Isopropyl Alcohol 67-63-0 Demulsifier 0.0393 Canyon Technical Services
Methanol 67-56-1 Demulsifier 0.0393 Canyon Technical Services
Non-hazardous base ingredient(s) Not Available Demulsifier 0.0393 Canyon Technical Services
Sulfonic Acids (Petroleum) 61789-85-3 Demulsifier 0.0393 Canyon Technical Services
Polysacharide Suspension Not Available Gelling Agent 0.4148 Canyon Technical Services
Non-hazardous base ingredient(s) Not Available Scale Inhibitor 0.1318 Canyon Technical Services
Silica. crystalline-quartz 14808-60-7 Scale Inhibitor 0.1318 Canyon Technical Services
White mineral oil 8042-47-5 Scale Inhibitor 0.1318 Canyon Technical Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
1/13/2017 1/13/2017 0:00 Surface Water - Runoff 869

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 7348 1104.1 0.0 0.0
2018 8526 844.9 0.0 0.0
2019 2009 148.4 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-30 No Incident N/A N/A
2017-01-04 No Incident N/A N/A

For data sources see[9]

References