X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344031513000

Well Details

Well ID: 0344031513000
Loading map...
Location: 00/13-15-034-03W4/0
Location Alias: 00/13-15-34-03 W4M
Location Alias 2: 00/13-15-034-03 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: RHE HZ PROVOST 13-15-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0489609
License Date: 2018-06-19
License Status: Issued
Spud Date: 2018-07-07
Final Drill Date: 2018-07-23
Well Total Depth: 2338 m
Surface Hole Latitude: 51.924018
Surface Hole Longitude: -110.334008

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
07 Jul 2018 Predator Drilling Inc. 8 N/A Set Surface
21 Jul 2018 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-21 437
2018-07-21 864 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-08 Multi-Stage Fracture 2280.6 2280.7 0
2018-08-08 Multi-Stage Fracture 2254.9 2255 0
2018-08-08 Multi-Stage Fracture 2218.2 2218.3 0
2018-08-08 Multi-Stage Fracture 2192.8 2192.9 0
2018-08-08 Multi-Stage Fracture 2152.6 2152.7 0
2018-08-08 Multi-Stage Fracture 2124.6 2124.7 0
2018-08-08 Multi-Stage Fracture 2083.2 2083.3 0
2018-08-08 Multi-Stage Fracture 2056.4 2056.5 0
2018-08-08 Multi-Stage Fracture 2015 2015.1 0
2018-08-08 Multi-Stage Fracture 1986.8 1986.9 0
2018-08-08 Multi-Stage Fracture 1961.1 1961.2 0
2018-08-08 Multi-Stage Fracture 1920.1 1920.2 0
2018-08-08 Multi-Stage Fracture 1878.2 1878.3 0
2018-08-08 Multi-Stage Fracture 1838 1838.1 0
2018-08-08 Multi-Stage Fracture 1809.3 1809.4 0
2018-08-09 Multi-Stage Fracture 1767.4 1767.5 0
2018-08-09 Multi-Stage Fracture 1739.5 1739.6 0
2018-08-09 Multi-Stage Fracture 1699.4 1699.5 0
2018-08-09 Multi-Stage Fracture 1672.8 1672.9 0
2018-08-09 Multi-Stage Fracture 1631.9 1632 0
2018-08-09 Multi-Stage Fracture 1606 1606.1 0
2018-08-09 Multi-Stage Fracture 1538.5 1538.6 0
2018-08-09 Multi-Stage Fracture 1512.7 1512.8 0
2018-08-09 Multi-Stage Fracture 1471.1 1471.2 0
2018-08-09 Multi-Stage Fracture 1443.9 1444 0
2018-08-09 Multi-Stage Fracture 1402.3 1402.4 0
2018-08-09 Multi-Stage Fracture 1347.5 1347.6 0
2018-08-09 Multi-Stage Fracture 1319.9 1320 0
2018-08-09 Multi-Stage Fracture 1278.9 1279 0
2018-08-09 Multi-Stage Fracture 1251.5 1251.6 0
2018-08-09 Multi-Stage Fracture 1211.7 1211.8 0
2018-08-09 Multi-Stage Fracture 1185.2 1185.3 0
2018-08-09 Multi-Stage Fracture 1145.7 1145.8 0
2018-08-09 Multi-Stage Fracture 1093.4 1093.5 0
2018-08-09 Multi-Stage Fracture 1041.1 1041.2 0
2018-08-09 Multi-Stage Fracture 1001.7 1001.8 0
2018-08-09 Multi-Stage Fracture 962.2 962.3 0
2018-08-09 Multi-Stage Fracture 935.7 935.8 0
2018-08-09 Multi-Stage Fracture 909.2 909.3 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
08/08/2018 08/09/2018 Potassium Hydroxide 1310-58-3 Crosslinker 0.141 Fusion Technologies Inc.

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
7/31/2018 8/1/2018 0:00 Surface Water - Runoff 1800

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3407 1034.5 0.0 0.0
2019 2149 275.1 0.0 0.0

For data sources see[8]

References