X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344031513000

Well Details

Well ID: 0344031513000
Loading map...
Location: 00/13-15-034-03W4/0
Location Alias: 00/13-15-34-03 W4M
Location Alias 2: 00/13-15-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 15
County/Municipality: Special Areas No. 4
Well Name: RHE HZ PROVOST 13-15-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0489609
License Date: 2018-06-19
License Status: Issued
Spud Date: 2018-07-07
Final Drill Date: 2018-07-23
Well Total Depth: 2338.00 m
Surface Hole Latitude: 51.924018
Surface Hole Longitude: -110.334008

For data sources see[1][2]

Well History

Date Event
2018-06-19 Obtained License
2018-07-08 Surface Casing Operation Performed
2018-07-21 Direction Drilling Operation Performed - Deviate
2018-07-21 Direction Drilling Operation Performed - Horizontal
2018-07-22 Well Log Performed
2018-07-23 Finished Drilling
2018-07-23 Production Casing Operation Performed
2018-07-23 Rig Released
2018-07-23 Well Mode changed to Drilled and Cased
2018-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-17 Well Began Production
2018-08-17 Well Fluid changed to Crude Oil
2018-08-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-07 Predator Drilling Inc. 8 N/A Set Surface
2018-07-21 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-21 436.60 Deviate (5 - 79 degrees)
2018-07-21 863.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-08 Multi-Stage Fracture 2280.60 2280.70 0
2018-08-08 Multi-Stage Fracture 1986.80 1986.90 0
2018-08-08 Multi-Stage Fracture 1961.10 1961.20 0
2018-08-08 Multi-Stage Fracture 1920.10 1920.20 0
2018-08-08 Multi-Stage Fracture 1878.20 1878.30 0
2018-08-08 Multi-Stage Fracture 1838.00 1838.10 0
2018-08-08 Multi-Stage Fracture 1809.30 1809.40 0
2018-08-09 Multi-Stage Fracture 1767.40 1767.50 0
2018-08-09 Multi-Stage Fracture 1739.50 1739.60 0
2018-08-09 Multi-Stage Fracture 1699.40 1699.50 0
2018-08-09 Multi-Stage Fracture 1672.80 1672.90 0
2018-08-08 Multi-Stage Fracture 2254.90 2255.00 0
2018-08-09 Multi-Stage Fracture 1631.90 1632.00 0
2018-08-09 Multi-Stage Fracture 1606.00 1606.10 0
2018-08-09 Multi-Stage Fracture 1538.50 1538.60 0
2018-08-09 Multi-Stage Fracture 1512.70 1512.80 0
2018-08-09 Multi-Stage Fracture 1471.10 1471.20 0
2018-08-09 Multi-Stage Fracture 1443.90 1444.00 0
2018-08-09 Multi-Stage Fracture 1402.30 1402.40 0
2018-08-09 Multi-Stage Fracture 1347.50 1347.60 0
2018-08-09 Multi-Stage Fracture 1319.90 1320.00 0
2018-08-09 Multi-Stage Fracture 1278.90 1279.00 0
2018-08-08 Multi-Stage Fracture 2218.20 2218.30 0
2018-08-09 Multi-Stage Fracture 1251.50 1251.60 0
2018-08-09 Multi-Stage Fracture 1211.70 1211.80 0
2018-08-09 Multi-Stage Fracture 1185.20 1185.30 0
2018-08-09 Multi-Stage Fracture 1145.70 1145.80 0
2018-08-09 Multi-Stage Fracture 1093.40 1093.50 0
2018-08-09 Multi-Stage Fracture 1041.10 1041.20 0
2018-08-09 Multi-Stage Fracture 1001.70 1001.80 0
2018-08-09 Multi-Stage Fracture 962.20 962.30 0
2018-08-09 Multi-Stage Fracture 935.70 935.80 0
2018-08-09 Multi-Stage Fracture 909.20 909.30 0
2018-08-08 Multi-Stage Fracture 2192.80 2192.90 0
2018-08-08 Multi-Stage Fracture 2152.60 2152.70 0
2018-08-08 Multi-Stage Fracture 2124.60 2124.70 0
2018-08-08 Multi-Stage Fracture 2083.20 2083.30 0
2018-08-08 Multi-Stage Fracture 2056.40 2056.50 0
2018-08-08 Multi-Stage Fracture 2015.00 2015.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-08 2018-08-09 742 1,623 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 71.5548 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.9103 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0894 N/A
water 7732-18-5 100 0.0894 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0333 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.141 N/A
Ethylene glycol 107-21-1 100 0.141 N/A
Potassium Carbonate 584-08-7 100 0.141 N/A
Potassium Hydroxide 1310-58-3 100 0.141 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3035 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0569 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0569 N/A
water 7732-18-5 100 0.0569 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-31 2018-08-01 Surface Water - Runoff 1800

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3407 0.0 0.0 0.0
2019 8691 0.0 0.0 0.0
2020 2137 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-23 No Incident Encountered 0.00 0.00
2018-08-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References