If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-129-20232 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.616500389,"lon":-82.8639965515,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-04-14 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.616500389 | |
Longitude: -82.8639965515 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1629080587 | 2011-04-21 | - contacted that the well will be plug.
- Formation Cementing Inc. on site for plugging. - Total depth of well 3,119 feet, 102 joint of drill pipe place into well for plugging. - 300 foot plug set at bottom of well Rose Run formation, pull 15 joints of pipe for next plug, set 200 foot plug for the Trenton formation. Gel spacer place between next plug, pull 44 joints of pipe set 200 foot plug at the bottom of surface casing. Pull 39 joints of pipe for plug below ground level. Pull 4 joints of pipe and top off well after cement settled. - 146 sacks of cement with 2% gel and cotton seed hull were used. 130 Lbs of gel and 100 lbs of accelerator used. |
||||
919829267 | 2011-04-18 | - contacted for surface casing. On site Bowman Drilling contactor doing drilling. Spud 4/15/2011 conductor casing set 5/15/2011 to a depth of 168 ft.
8.75 hole drilled to 1285 First joint of 7" casing new the rest of the 7" casing is used witness casing placed into bore hole. Total length of 7" casing 1,278 with landing joint. Copied and total casing tallie. Formation Cementing Inc. pump 185 sacks class A cement with 2% gel, cotton seed hulls and flakes added. Wiper plug was use. Cement circulated to surface. - Request for notification for BOP test since several resident in the area. - Rig driller call for BOP test and told him that test couldn't be done until 8 hours after surface casing cementing job is completed. - Back on site for BOP test, took 4 attempts for BOP to pass. |
||||
985778973 | 2012-02-02 | - Pits have been fill in, area graded to original contour. Landowner has planted winter wheat and is growing. Will approve final restoration. |