If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-25949 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.2341751285,"lon":-82.5248325432,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-08-04 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.2341751285 | |
Longitude: -82.5248325432 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1811476225 | 2012-01-24 | An inspection of tank battery location was conducted with Jeff Fry and Brandon Mitchell. Please refer to Brandon Mitchell's report for details regarding the Preliminary Restoration. | ||||
-1975127471 | 2008-08-07 | They are cementing the production casing today. | ||||
-2085421680 | 2008-08-06 | I witnessed drilling operations today. The surface casing has been cemented and they plan on reaching TD this evening. Cementers will cement the longstring in the morning. | ||||
-929830638 | 2008-08-05 | I witnessed the surface job. | ||||
1328053736 | 2012-01-18 | During my inspection I completed a preliminary status check and found that the well was equipped with a pumping unit. The well was not pumping during my inspection but the valves were all open. The pits have been closed and the area around the well has been graded. The well produces into a shared tank battery but has no ID posted at the well. The tank battery consist of one 100 barrel tank, two gas seperators, and two gas meters inside of a dike. This is a shared tank battery for two wells. The permit numbers are 5949 and 6029. There is a ID posted at the tank battery. The lease road is in good condition. Preliminary restoration passed. |