If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-26548 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3538186647,"lon":-81.8487030175,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1995-08-01 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 2 | |
Latitude: 40.3538186647 | |
Longitude: -81.8487030175 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1669089934 | 2013-05-17 | On the day of my inspection Cemenco hooked up to the 4.5" casing to circulate through perforations. The pressure increased rapidly when attempting to circulate. The pressure was not allowed to increase over 1200 psi. Cemenco shut down without pumping any cement. The casing will need to be perforated again. | ||||
1012280073 | 2011-09-13 | R & B Drilling rig changing pump. | ||||
1236959815 | 2009-03-13 | Call from Dennis Devers @ 3:15 pm w/ OEPA 3/12/09 notified Rocky King of oil spill . Call from Bill Arnolt @ 4:30 pm w/ Northwood Energy 3/12/09 . 3/13/09 inspection of oil spill at well site . 210 bl. Storage tank inside dike , the dike contained all but 0.5 bls. Oil ran into drain tile at well site and came out down hill approximately 100' covering a area of 40' by 70' . Oil and contaminated soil have been removed from this area oil spill clean up is on going at this time . Storage tank is 25' from well head . Storage tank is in violation of spacing . Tank will need to at a minimum of 50' from well head & diked to contain 110 % of storage tank . No identification at well or tank . Called Bill Arnolt this date and notified of violations . | 9-9-05(A)10 | |||
1236959815 | 2009-03-13 | Call from Dennis Devers @ 3:15 pm w/ OEPA 3/12/09 notified Rocky King of oil spill . Call from Bill Arnolt @ 4:30 pm w/ Northwood Energy 3/12/09 . 3/13/09 inspection of oil spill at well site . 210 bl. Storage tank inside dike , the dike contained all but 0.5 bls. Oil ran into drain tile at well site and came out down hill approximately 100' covering a area of 40' by 70' . Oil and contaminated soil have been removed from this area oil spill clean up is on going at this time . Storage tank is 25' from well head . Storage tank is in violation of spacing . Tank will need to at a minimum of 50' from well head & diked to contain 110 % of storage tank . No identification at well or tank . Called Bill Arnolt this date and notified of violations . | 9-9-05(A)2 | |||
1237224595 | 2009-03-16 | Meet with landowner ( Ester Mathis ) and Mark Fluharty with Northwood energy at well site went over clean up of oil spill . Storage tank pad is built tank ready to be moved 50' from well head . All but storage old storage tank area cleaned up and ready for seeding . Soil is being removed from oil tank area this inspection . | ||||
1243353594 | 2009-05-26 | Oil spill in compliance . | ||||
1368720576 | 2013-05-15 | On the day of my inspection Appalachian Well Surveys ran a neutron and gamma log in cased hole. Then they ran a bond log to determine the top of the production string cement. The cement top was at 5274'. | ||||
1368799957 | 2013-05-16 | Appalachian Well Surveys set a cast iron bridge plug at 5500' and a drillable bridge plug at 5266' Then they perforated the 4.5" casing with 6 shots at 5262'. | ||||
1369404838 | 2013-05-24 | On the day of my inspection Davis Well Service was running 2.375" tubing into the well to drill out the cement and bridge plug. | ||||
1993741583 | 2013-11-12 | On the day of my inspection I found that the well site was graded out to the approximate contour of the surrounding landscape and covered in well established short grasses. This plug back site passes preliminary restoration. | ||||
784909817 | 2013-05-14 | On the day of my inspection Davis Well Service ran tubing to 6088'. Cemenco broke circulation and pumped a 300' plug in the 4.5" casing from 6088' to 5788'. Good circulation was maintained throughout the job and there were no leaks or spills. | ||||
933583251 | 2013-05-13 | On the day of my inspection Davis Well Service pulled 6080' of tubing. The permit was on location and there were no leaks or spills. | ||||
9689 | PASSED Y WITNESSED 11/9/95 INSPECTOR DATE 11/0919/95 DATA FROM OLD VAX INFO |