If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23141 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.050017261,"lon":-81.6718442598,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-08-20 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.050017261 | |
Longitude: -81.6718442598 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-149447472 | 2011-11-04 | The well has been fraced and is equipped with tubing, rods and a pump jack. The tank battery equipment is on site but has not been connected. No violations at this time. | ||||
-1982534959 | 2011-09-08 | The drilling pits were solidified on 9/6/11 and have now been covered over. Perforating is scheduled for 9/9/11 and the frac job for next week. | ||||
-284346797 | 2009-08-23 | Poulson Drilling is drilling at 2900' on salt water. They coverted to fluid at the top of the Big Lime. The pits are fenced, lined and in good condition. | ||||
-843771531 | 2011-09-06 | Chem Tech was on site to solidify the drilling pits with one load (20+ tons) of dust for each pit. Mr. Seabeck provided the trackhoe to mix the dust and cover over the pit. Pit closure occurred within the required 14 days. Preliminary Restoration is due by the first of December. | ||||
1314879190 | 2011-08-26 | Poulson Drilling is moving off location. The drilling pits are fenced, lined and in good condition. The pits will be solidified and closed within 14 days. | ||||
163742938 | 2011-08-22 | Poulson Drilling is drilling at 2050' on air/soap. They will covert to fluid at the top of the Big Lime later today. The pits are fenced, lined and in good condition. | ||||
301232845 | 2011-08-29 | The drilling rig has moved off site. The drilling pits have been pumped down and are still fenced and lined. Pit solidification is still scheduled for next week. | ||||
434183832 | 2011-08-24 | Poulson Drilling is drilling at 3570' on salt water. They should TD the well tomorrow. The pits are fenced, lined and in good condition. | ||||
781903660 | 2011-08-25 | Poulson has finished drilling the well with a TD at 3910'. The longstring job will be up later today. The drilling pits are fenced, lined and in good condition. The Uniontown office received a water well complaint from Gregory Tygard (330-289-2605) at 3559 Wadsworth Road. Mr. Tygard lives two doors east of Mr. Seabeck. His complaint involves water quality after he noticed an increase in suspended sediment in his water supply. Mr. Tygard denied permission when ISSI was collecting pre-drilling water samples. The complaint information was forwarded to Kyle Tharp for an investigation. |