34-019-22536

Well Details

Well ID: 34-019-22536
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing:
Violations:
Latitude:
Longitude:

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1046653962 2013-12-20 I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Express has drilled a 26 inch hole to a total depth of 120 feet and ran 120 feet of 20 inch conductor casing (94 pounds per foot / inside diameter 19.124 inches). Allied cemented the casing with 238 sacks of Class "A" with 2% CaCl and 1/2 pound per sack flake. The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.23 gallons of mix water per sack. Allied pumped 50 barrels of cement, pumped 39 barrels of displacement, and there was 7 barrels of cement returns to surface. My inspection revealed no violations at this time.
-350242038 2014-01-30 I was on site to witness the cementing of the 13 3/8 inch surface casing. My inspection revealed that Nomac Rig # 73 has drilled a 17.5 inch hole to a total depth of 545 feet and ran 535 feet of 13 3/8 inch surface casing (54.5 pounds per foot / inside diameter 12.615 inches). They installed 5 bowspring centralizers on the casing string on joints 1,3,6,9, and 12. O-TEX cemented the casing with 500 sacks of Class "H" (D901) with 2% CaCl, , and 1/4 pound per sack celloflake. The cement had a density of 15.6 pounds per gallon, a yield of 1.20 cubic feet per sack, and they used 5.25 gallons of mix water per sack. O-TEX pumped 106.86 barrels of cement, 77 barrels of displacement, and there was 25 barrels of cement returns to surface. They bumped the plug with 160 PSI and the bumped the pressure up to 820 PSI to conduct the casing test. Casing test was approved, floats held, and there was approximately 1/2 barrel of flowback when the pressure was released. My inspection revealed no violations at this time.