If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1186041502020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.24486,"lon":-118.583994,"icon":""}]} |
| Location: 02/02-15-118-04W6/0 | |
| Location Alias: 02/02-15-18-04 W6M | |
| Location Alias 2: 02/02-15-118-04 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 118 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 15 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ET AL ZAMA 2-15-118-4 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0181587 | |
| License Date: 1995-10-23 | |
| License Status: Abandoned | |
| Spud Date: 1995-10-30 | |
| Final Drill Date: 1995-11-12 | |
| Well Total Depth: 1510.00 m | |
| Surface Hole Latitude: 59.244860 | |
| Surface Hole Longitude: -118.583994 |
| Date | Event |
|---|---|
| 1995-10-23 | Obtained License |
| 1995-10-31 | Surface Casing Operation Performed |
| 1995-11-04 | Direction Drilling Operation Performed - Deviate |
| 1995-11-08 | Well Log Performed |
| 1995-11-09 | Drill Stem Test Performed |
| 1995-11-12 | Finished Drilling |
| 1995-11-12 | Well Log Performed |
| 1995-11-12 | Well Mode changed to Drilled and Cased |
| 1995-11-14 | Intermediate Casing Operation Performed |
| 1995-11-14 | Liner Casing Operation Performed |
| 1995-11-15 | Rig Released |
| 1995-11-21 | Well Log Performed |
| 1995-11-23 | Perforation Treatment Performed - Jet Perforation |
| 1995-11-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-11-25 | Well Began Production |
| 1995-11-25 | Well Fluid changed to Crude Oil |
| 1995-11-25 | Well Mode changed to Pumping |
| 1996-10-03 | Well Log Performed |
| 1999-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-09-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2002-09-27 | Plug Back Performed |
| 2002-09-27 | Well Fluid changed to Crude Oil |
| 2002-09-27 | Well Log Performed |
| 2002-09-27 | Well Mode changed to Abandoned Zone |
| 2002-09-28 | Perforation Treatment Performed - Jet Perforation |
| 2002-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2010-03-04 | Perforation Treatment Performed - Cement Plug |
| 2010-03-04 | Plug Back Performed |
| 2010-03-05 | Perforation Treatment Performed - Cement Plug |
| 2010-03-05 | Plug Back Performed |
| 2010-03-06 | Well Log Performed |
| 2010-03-07 | Perforation Treatment Performed - Jet Perforation |
| 2010-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-03-08 | Perforation Treatment Performed - Remedial Casing |
| 2010-03-08 | Well Log Performed |
| 2010-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2010-03-09 | Perforation Treatment Performed - Jet Perforation |
| 2010-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-03-10 | Perforation Treatment Performed - Remedial Casing |
| 2010-03-16 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1995-11-04 | 1107.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1995-11-23 | Perforation | 1482.50 | 1484.50 | 13 |
| 2002-09-28 | Perforation | 1370.50 | 1371.50 | 13 |
| 2002-09-28 | Perforation | 1375.00 | 1376.00 | 13 |
| 2002-09-28 | Perforation | 1386.50 | 1387.50 | 13 |
| 2002-09-28 | Perforation | 1392.50 | 1394.50 | 13 |
| 2002-09-29 | Acid Treatment | 1367.00 | 1394.50 | 0 |
| 2010-03-04 | Cement Plug | 1371.50 | 1421.00 | 0 |
| 2010-03-05 | Cement Plug | 1224.80 | 1371.50 | 0 |
| 2010-03-07 | Perforation | 657.00 | 658.00 | 17 |
| 2010-03-08 | Remedial Casing Cementing | 657.00 | 658.00 | 0 |
| 2010-03-08 | Packing Device Capped w/Cement | 641.00 | 655.00 | 0 |
| 1995-11-23 | Perforation | 1486.50 | 1488.50 | 13 |
| 2010-03-09 | Perforation | 357.50 | 358.50 | 17 |
| 2010-03-09 | Acid Treatment | 357.50 | 358.50 | 0 |
| 2010-03-10 | Remedial Casing Cementing | 357.50 | 358.50 | 0 |
| 2010-03-10 | Packing Device Capped w/Cement | 347.00 | 355.00 | 0 |
| 1995-11-23 | Perforation | 1489.50 | 1490.50 | 13 |
| 1995-11-23 | Perforation | 1492.00 | 1493.00 | 13 |
| 1995-11-23 | Perforation | 1494.00 | 1495.00 | 13 |
| 1995-11-24 | Acid Treatment | 1482.50 | 1495.00 | 0 |
| 1999-10-22 | Acid Treatment | 1482.50 | 1484.50 | 0 |
| 2002-09-27 | Packing Device Capped w/Cement | 1472.00 | 1480.00 | 0 |
| 2002-09-28 | Perforation | 1367.00 | 1368.50 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1995 | 751 | 0.0 | 0.0 | 0.0 |
| 1996 | 5246 | 0.0 | 0.0 | 0.0 |
| 1997 | 7965 | 0.0 | 0.0 | 0.0 |
| 1998 | 8248 | 0.0 | 0.0 | 0.0 |
| 1999 | 8638 | 0.0 | 0.0 | 0.0 |
| 2000 | 8612 | 0.0 | 0.0 | 0.0 |
| 2001 | 8729 | 0.0 | 0.0 | 0.0 |
| 2002 | 6340 | 0.0 | 0.0 | 0.0 |
For data sources see[6]