If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485071610030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.14227,"lon":-114.926945,"icon":""}]} |
Location: 03/10-16-048-07W5/0 | |
Location Alias: 03/10-16-48-07 W5M | |
Location Alias 2: 03/10-16-048-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 07 | |
Section: 16 | |
County/Municipality: Brazeau County | |
Well Name: ARC 103 HZ PEMBINA 10-16-48-7 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0468393 | |
License Date: 2014-07-23 | |
License Status: Issued | |
Spud Date: 2014-10-01 | |
Final Drill Date: 2014-10-07 | |
Well Total Depth: 3558.00 m | |
Surface Hole Latitude: 53.142270 | |
Surface Hole Longitude: -114.926945 |
Date | Event |
---|---|
2014-07-23 | Obtained License |
2014-10-01 | Surface Casing Operation Performed |
2014-10-02 | Direction Drilling Operation Performed - Deviate |
2014-10-03 | Direction Drilling Operation Performed - Horizontal |
2014-10-03 | Well Log Performed |
2014-10-04 | Intermediate Casing Operation Performed |
2014-10-07 | Finished Drilling |
2014-10-07 | Well Log Performed |
2014-10-07 | Well Mode changed to Drilled and Cased |
2014-10-08 | Liner Casing Operation Performed |
2014-10-08 | Perforation Treatment Performed - Open-Hole Completion |
2014-10-09 | Rig Released |
2014-11-16 | Well Log Performed |
2014-11-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-01-08 | Well Began Production |
2015-01-08 | Well Fluid changed to Crude Oil |
2015-01-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-10-01 | Excalibur Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-10-02 | 1048.10 | Deviate (5 - 79 degrees) |
2014-10-03 | 1592.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-10-08 | Open Hole/Barefoot Completion | 3547.00 | 3558.00 | 0 |
2014-11-22 | Multi-Stage Fracture | 2858.40 | 2858.50 | 0 |
2014-11-22 | Multi-Stage Fracture | 2781.50 | 2781.60 | 0 |
2014-11-22 | Multi-Stage Fracture | 2701.50 | 2701.60 | 0 |
2014-11-22 | Multi-Stage Fracture | 2623.50 | 2623.60 | 0 |
2014-11-22 | Multi-Stage Fracture | 2543.50 | 2543.60 | 0 |
2014-11-22 | Multi-Stage Fracture | 2466.40 | 2466.50 | 0 |
2014-11-22 | Multi-Stage Fracture | 2387.50 | 2387.60 | 0 |
2014-11-22 | Multi-Stage Fracture | 2310.50 | 2310.60 | 0 |
2014-11-22 | Multi-Stage Fracture | 2229.90 | 2230.00 | 0 |
2014-11-22 | Multi-Stage Fracture | 2154.50 | 2154.60 | 0 |
2014-11-22 | Multi-Stage Fracture | 3542.40 | 3542.50 | 0 |
2014-11-22 | Multi-Stage Fracture | 2073.10 | 2073.20 | 0 |
2014-11-22 | Multi-Stage Fracture | 1996.50 | 1996.60 | 0 |
2014-11-22 | Multi-Stage Fracture | 1918.40 | 1918.50 | 0 |
2014-11-22 | Multi-Stage Fracture | 1840.60 | 1840.70 | 0 |
2014-11-22 | Multi-Stage Fracture | 1756.90 | 1757.00 | 0 |
2014-11-22 | Multi-Stage Fracture | 1673.00 | 1673.10 | 0 |
2014-11-22 | Multi-Stage Fracture | 3455.40 | 3455.50 | 0 |
2014-11-22 | Multi-Stage Fracture | 3347.30 | 3347.40 | 0 |
2014-11-22 | Multi-Stage Fracture | 3258.00 | 3258.10 | 0 |
2014-11-22 | Multi-Stage Fracture | 3179.40 | 3179.50 | 0 |
2014-11-22 | Multi-Stage Fracture | 3100.80 | 3100.90 | 0 |
2014-11-22 | Multi-Stage Fracture | 3019.90 | 3020.00 | 0 |
2014-11-22 | Multi-Stage Fracture | 2937.80 | 2937.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-11-22 | 2014-11-22 | 1,454 | 2,867 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 85.8294 | N/A | |||
Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 10.5168 | N/A | ||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 3.8208 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 0.5423 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0144 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0144 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0144 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0144 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0144 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1981 | N/A | |
water | Not Available | 100 | 0.1981 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0962 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0962 | N/A | ||||
FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0478 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0478 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0478 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-11-16 | 2014-11-18 | Surface Water - Runoff | 2876 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 6326 | 0.0 | 0.0 | 0.0 |
2016 | 6067 | 0.0 | 0.0 | 0.0 |
2017 | 6971 | 0.0 | 0.0 | 0.0 |
2018 | 8025 | 0.0 | 0.0 | 0.0 |
2019 | 8551 | 0.0 | 0.0 | 0.0 |
2020 | 2087 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-10-09 | No Incident Encountered | 0.00 | 0.00 |
2014-11-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]