X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485071610030

Well Details

Well ID: 0485071610030
Loading map...
Location: 03/10-16-048-07W5/0
Location Alias: 03/10-16-48-07 W5M
Location Alias 2: 03/10-16-048-07 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 07
Section: 16
County/Municipality: Brazeau County
Well Name: ARC 103 HZ PEMBINA 10-16-48-7
Operator Name: ARC Resources Ltd.
License Number: 0468393
License Date: 2014-07-23
License Status: Issued
Spud Date: 2014-10-01
Final Drill Date: 2014-10-07
Well Total Depth: 3558.00 m
Surface Hole Latitude: 53.142270
Surface Hole Longitude: -114.926945

For data sources see[1][2]

Well History

Date Event
2014-07-23 Obtained License
2014-10-01 Surface Casing Operation Performed
2014-10-02 Direction Drilling Operation Performed - Deviate
2014-10-03 Direction Drilling Operation Performed - Horizontal
2014-10-03 Well Log Performed
2014-10-04 Intermediate Casing Operation Performed
2014-10-07 Finished Drilling
2014-10-07 Well Log Performed
2014-10-07 Well Mode changed to Drilled and Cased
2014-10-08 Liner Casing Operation Performed
2014-10-08 Perforation Treatment Performed - Open-Hole Completion
2014-10-09 Rig Released
2014-11-16 Well Log Performed
2014-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-08 Well Began Production
2015-01-08 Well Fluid changed to Crude Oil
2015-01-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-01 Excalibur Drilling Ltd. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-02 1048.10 Deviate (5 - 79 degrees)
2014-10-03 1592.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-08 Open Hole/Barefoot Completion 3547.00 3558.00 0
2014-11-22 Multi-Stage Fracture 2858.40 2858.50 0
2014-11-22 Multi-Stage Fracture 2781.50 2781.60 0
2014-11-22 Multi-Stage Fracture 2701.50 2701.60 0
2014-11-22 Multi-Stage Fracture 2623.50 2623.60 0
2014-11-22 Multi-Stage Fracture 2543.50 2543.60 0
2014-11-22 Multi-Stage Fracture 2466.40 2466.50 0
2014-11-22 Multi-Stage Fracture 2387.50 2387.60 0
2014-11-22 Multi-Stage Fracture 2310.50 2310.60 0
2014-11-22 Multi-Stage Fracture 2229.90 2230.00 0
2014-11-22 Multi-Stage Fracture 2154.50 2154.60 0
2014-11-22 Multi-Stage Fracture 3542.40 3542.50 0
2014-11-22 Multi-Stage Fracture 2073.10 2073.20 0
2014-11-22 Multi-Stage Fracture 1996.50 1996.60 0
2014-11-22 Multi-Stage Fracture 1918.40 1918.50 0
2014-11-22 Multi-Stage Fracture 1840.60 1840.70 0
2014-11-22 Multi-Stage Fracture 1756.90 1757.00 0
2014-11-22 Multi-Stage Fracture 1673.00 1673.10 0
2014-11-22 Multi-Stage Fracture 3455.40 3455.50 0
2014-11-22 Multi-Stage Fracture 3347.30 3347.40 0
2014-11-22 Multi-Stage Fracture 3258.00 3258.10 0
2014-11-22 Multi-Stage Fracture 3179.40 3179.50 0
2014-11-22 Multi-Stage Fracture 3100.80 3100.90 0
2014-11-22 Multi-Stage Fracture 3019.90 3020.00 0
2014-11-22 Multi-Stage Fracture 2937.80 2937.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-22 2014-11-22 1,454 2,867 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.8294 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 10.5168 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 3.8208 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.5423 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0144 N/A
dibromoacetonitrile 3252-43-5 100 0.0144 N/A
non-hazardous ingredients Not Available 100 0.0144 N/A
polyethylene glycol 25322-68-3 100 0.0144 N/A
sodium bromide 7647-15-6 100 0.0144 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1981 N/A
water Not Available 100 0.1981 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0962 N/A
propylene glycol 57-55-6 100 0.0962 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0478 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0478 N/A
non-hazardous ingredients Not Available 100 0.0478 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-16 2014-11-18 Surface Water - Runoff 2876

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6326 0.0 0.0 0.0
2016 6067 0.0 0.0 0.0
2017 6971 0.0 0.0 0.0
2018 8025 0.0 0.0 0.0
2019 8551 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-09 No Incident Encountered 0.00 0.00
2014-11-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References