If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465143110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.012481,"lon":-116.017347,"icon":""}]} |
Location: 00/10-31-046-14W5/0 | |
Location Alias: 00/10-31-46-14 W5M | |
Location Alias 2: 00/10-31-046-14 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 14 | |
Section: 31 | |
County/Municipality: Yellowhead County | |
Well Name: HB BRAZR 10-31-46-14 | |
Operator Name: ATCO Midstream Processing Ltd. | |
License Number: 0026458 | |
License Date: 1964-07-10 | |
License Status: RecCertified | |
Spud Date: 1964-07-17 | |
Final Drill Date: 1964-08-29 | |
Well Total Depth: 3147.40 m | |
Surface Hole Latitude: 53.012481 | |
Surface Hole Longitude: -116.017347 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1964-07-10 | Obtained License |
1964-08-29 | Finished Drilling |
1964-08-30 | Drill Stem Test Performed |
1964-09-01 | Production Casing Operation Performed |
1965-06-12 | Well Mode changed to Drilled and Cased |
1983-08-16 | Perforation Treatment Performed - Jet Perforation |
1983-08-16 | Well Log Performed |
1983-12-07 | Well Log Performed |
1983-12-09 | Perforation Treatment Performed - Selective Jet Perforations |
1983-12-09 | Well Log Performed |
1983-12-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-12-14 | Perforation Treatment Performed - Cement Squeeze |
1983-12-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-06-01 | Well Began Injection |
1984-06-01 | Well Fluid changed to Water |
1984-06-01 | Well Type changed to Disposal |
1985-01-10 | Well Log Performed |
1985-01-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-01-12 | Plug Back Performed |
1985-01-13 | Perforation Treatment Performed - Jet Perforation |
1985-01-13 | Well Log Performed |
1985-01-14 | Perforation Treatment Performed - Jet Perforation |
1985-01-16 | Perforation Treatment Performed - Cement Squeeze |
1985-01-16 | Plug Back Performed |
1985-01-18 | Perforation Treatment Performed - Cement Squeeze |
1985-01-18 | Well Log Performed |
1985-01-20 | Perforation Treatment Performed - Cement Squeeze |
1985-01-20 | Plug Back Performed |
1985-01-20 | Well Log Performed |
1985-01-25 | Well Log Performed |
1985-01-26 | Perforation Treatment Performed - Jet Perforation |
1985-01-26 | Well Log Performed |
1985-01-28 | Well Log Performed |
1985-05-07 | Perforation Treatment Performed - Jet Perforation |
1985-05-07 | Well Log Performed |
1986-05-13 | Perforation Treatment Performed - Jet Perforation |
1986-05-13 | Well Log Performed |
1987-06-30 | Well Fluid changed to Water |
1987-06-30 | Well Mode changed to Suspended |
1987-06-30 | Well Type changed to Disposal |
1988-08-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-08-16 | Plug Back Performed |
1988-08-16 | Well Fluid changed to Water |
1988-08-16 | Well Mode changed to Abandoned |
1988-08-16 | Well Type changed to Disposal |
1988-08-17 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-08-16 | Perforation | 1980.60 | 1986.70 | 7 |
1985-01-14 | Perforation | 1866.40 | 1867.40 | 13 |
1985-01-16 | Cement Squeeze | 1866.40 | 1882.80 | 0 |
1985-01-18 | Cement Squeeze | 1866.40 | 1882.80 | 0 |
1985-01-20 | Cement Squeeze | 1773.90 | 1774.90 | 0 |
1985-01-26 | Perforation | 1865.50 | 1874.50 | 13 |
1985-05-07 | Perforation | 1802.00 | 1804.70 | 13 |
1985-05-07 | Perforation | 1805.60 | 1809.60 | 13 |
1985-05-07 | Perforation | 1814.50 | 1815.50 | 13 |
1985-05-07 | Perforation | 1816.60 | 1818.40 | 13 |
1985-05-07 | Perforation | 1822.10 | 1824.50 | 13 |
1983-08-16 | Perforation | 1988.80 | 1992.50 | 7 |
1986-05-13 | Perforation | 1778.20 | 1791.00 | 13 |
1986-05-13 | Perforation | 1832.80 | 1847.10 | 13 |
1988-08-16 | Packing Device Capped w/Cement | 1756.50 | 1756.50 | 0 |
1983-12-09 | Selective Jet Perforations | 1947.00 | 1947.00 | 0 |
1983-12-14 | Acid Treatment | 1947.00 | 1947.00 | 0 |
1983-12-14 | Cement Squeeze | 1947.00 | 1947.00 | 0 |
1983-12-19 | Acid Treatment | 1980.60 | 1992.50 | 0 |
1985-01-12 | Packing Device Capped w/Cement | 1963.00 | 1971.00 | 0 |
1985-01-13 | Perforation | 1881.80 | 1882.80 | 13 |
1985-01-13 | Perforation | 1773.90 | 1774.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]