X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465143110000

Well Details

Well ID: 0465143110000
Loading map...
Location: 00/10-31-046-14W5/0
Location Alias: 00/10-31-46-14 W5M
Location Alias 2: 00/10-31-046-14 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 14
Section: 31
County/Municipality: Yellowhead County
Well Name: HB BRAZR 10-31-46-14
Operator Name: ATCO Midstream Processing Ltd.
License Number: 0026458
License Date: 1964-07-10
License Status: RecCertified
Spud Date: 1964-07-17
Final Drill Date: 1964-08-29
Well Total Depth: 3147.40 m
Surface Hole Latitude: 53.012481
Surface Hole Longitude: -116.017347

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-07-10 Obtained License
1964-08-29 Finished Drilling
1964-08-30 Drill Stem Test Performed
1964-09-01 Production Casing Operation Performed
1965-06-12 Well Mode changed to Drilled and Cased
1983-08-16 Perforation Treatment Performed - Jet Perforation
1983-08-16 Well Log Performed
1983-12-07 Well Log Performed
1983-12-09 Perforation Treatment Performed - Selective Jet Perforations
1983-12-09 Well Log Performed
1983-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-14 Perforation Treatment Performed - Cement Squeeze
1983-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-01 Well Began Injection
1984-06-01 Well Fluid changed to Water
1984-06-01 Well Type changed to Disposal
1985-01-10 Well Log Performed
1985-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-01-12 Plug Back Performed
1985-01-13 Perforation Treatment Performed - Jet Perforation
1985-01-13 Well Log Performed
1985-01-14 Perforation Treatment Performed - Jet Perforation
1985-01-16 Perforation Treatment Performed - Cement Squeeze
1985-01-16 Plug Back Performed
1985-01-18 Perforation Treatment Performed - Cement Squeeze
1985-01-18 Well Log Performed
1985-01-20 Perforation Treatment Performed - Cement Squeeze
1985-01-20 Plug Back Performed
1985-01-20 Well Log Performed
1985-01-25 Well Log Performed
1985-01-26 Perforation Treatment Performed - Jet Perforation
1985-01-26 Well Log Performed
1985-01-28 Well Log Performed
1985-05-07 Perforation Treatment Performed - Jet Perforation
1985-05-07 Well Log Performed
1986-05-13 Perforation Treatment Performed - Jet Perforation
1986-05-13 Well Log Performed
1987-06-30 Well Fluid changed to Water
1987-06-30 Well Mode changed to Suspended
1987-06-30 Well Type changed to Disposal
1988-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-08-16 Plug Back Performed
1988-08-16 Well Fluid changed to Water
1988-08-16 Well Mode changed to Abandoned
1988-08-16 Well Type changed to Disposal
1988-08-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-16 Perforation 1980.60 1986.70 7
1985-01-14 Perforation 1866.40 1867.40 13
1985-01-16 Cement Squeeze 1866.40 1882.80 0
1985-01-18 Cement Squeeze 1866.40 1882.80 0
1985-01-20 Cement Squeeze 1773.90 1774.90 0
1985-01-26 Perforation 1865.50 1874.50 13
1985-05-07 Perforation 1802.00 1804.70 13
1985-05-07 Perforation 1805.60 1809.60 13
1985-05-07 Perforation 1814.50 1815.50 13
1985-05-07 Perforation 1816.60 1818.40 13
1985-05-07 Perforation 1822.10 1824.50 13
1983-08-16 Perforation 1988.80 1992.50 7
1986-05-13 Perforation 1778.20 1791.00 13
1986-05-13 Perforation 1832.80 1847.10 13
1988-08-16 Packing Device Capped w/Cement 1756.50 1756.50 0
1983-12-09 Selective Jet Perforations 1947.00 1947.00 0
1983-12-14 Acid Treatment 1947.00 1947.00 0
1983-12-14 Cement Squeeze 1947.00 1947.00 0
1983-12-19 Acid Treatment 1980.60 1992.50 0
1985-01-12 Packing Device Capped w/Cement 1963.00 1971.00 0
1985-01-13 Perforation 1881.80 1882.80 13
1985-01-13 Perforation 1773.90 1774.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0

For data sources see[5]

References