If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0866103616022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.506269,"lon":-119.42978,"icon":""}]} |
| Location: 02/16-36-086-10W6/2 | |
| Location Alias: 02/16-36-86-10 W6M | |
| Location Alias 2: 02/16-36-086-10 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 086 | |
| Meridian: 6 | |
| Range: 10 | |
| Section: 36 | |
| County/Municipality: Clear Hills County | |
| Well Name: EEL WORSLEY 16-36-86-10 | |
| Operator Name: Enercapita Energy Ltd. | |
| License Number: 0313251 | |
| License Date: 2004-08-12 | |
| License Status: Issued | |
| Spud Date: 2004-10-13 | |
| Final Drill Date: 2004-10-17 | |
| Well Total Depth: 1430.00 m | |
| Surface Hole Latitude: 56.506269 | |
| Surface Hole Longitude: -119.429780 |
| Date | Event |
|---|---|
| 2004-08-12 | Obtained License |
| 2004-10-14 | Surface Casing Operation Performed |
| 2004-10-17 | Finished Drilling |
| 2004-10-17 | Well Mode changed to Drilled and Cased |
| 2004-10-18 | Well Log Performed |
| 2004-10-19 | Production Casing Operation Performed |
| 2004-10-20 | Rig Released |
| 2004-10-27 | Perforation Treatment Performed - Jet Perforation |
| 2004-10-30 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-09 | Well Began Production |
| 2004-11-09 | Well Fluid changed to Gas |
| 2004-11-09 | Well Mode changed to Flowing |
| 2009-05-01 | Well Fluid changed to Gas |
| 2009-05-01 | Well Mode changed to Suspended |
| 2010-01-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-01-26 | Perforation Treatment Performed - Cement Squeeze |
| 2010-01-26 | Plug Back Performed |
| 2010-01-26 | Well Fluid changed to Gas |
| 2010-01-26 | Well Log Performed |
| 2010-01-26 | Well Mode changed to Abandoned Zone |
| 2010-01-28 | Perforation Treatment Performed - Jet Perforation |
| 2010-01-28 | Well Log Performed |
| 2010-01-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2010-02-01 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-01 | Well Log Performed |
| 2010-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2010-02-03 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-03 | Well Log Performed |
| 2010-02-04 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-04 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-10-27 | Perforation | 1389.00 | 1390.00 | 17 |
| 2010-02-03 | Perforation | 1019.80 | 1029.00 | 17 |
| 2010-02-04 | Perforation | 1012.00 | 1013.00 | 17 |
| 2010-02-04 | Perforation | 1014.50 | 1016.50 | 17 |
| 2004-10-30 | Perforation | 968.00 | 970.00 | 17 |
| 2010-01-26 | Packing Device Capped w/Cement | 1375.00 | 1383.00 | 0 |
| 2010-01-26 | Cement Squeeze | 968.00 | 970.00 | 0 |
| 2010-01-28 | Perforation | 1107.00 | 1108.50 | 17 |
| 2010-01-28 | Perforation | 1110.00 | 1111.00 | 17 |
| 2010-01-29 | Acid Treatment | 1107.00 | 1111.00 | 0 |
| 2010-02-01 | Perforation | 1099.50 | 1101.00 | 17 |
| 2010-02-02 | Acid Treatment | 1099.50 | 1101.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 1348 | 0.0 | 0.0 | 0.0 |
| 2005 | 7604 | 0.0 | 0.0 | 0.0 |
| 2006 | 7957 | 0.0 | 0.0 | 0.0 |
| 2007 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]