If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20724 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.25,"lon":-80.84,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Smithfield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001498 | |
Farm/Lease Name: JACK HAMILTON E SMF JF | |
License Status: Producing | |
License Date: 2017-10-11 | |
Spud Date: 2017-06-11 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-12-30 | |
Well Total Depth: 21736.00 ft | |
Configuration: Horizontal | |
Latitude: 40.250000 | |
Longitude: -80.840000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-04-12 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/12/2017, Expired Date:4/12/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-10-11 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/11/2017, Expired Date:10/11/2019 12:00:00 PM, Drilling unit acres:595.875, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-12-30 | |
Correction to Well | 2018-04-13 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-09-05 | |
Record Last Modified | 2018-09-08 | |
Construction Permit Expires | 2019-10-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-09-07 | 9838 | 10331 | 0 |
2018-09-07 | 17930 | 18033 | 0 |
17930 | 18033 | 0 | |
9838 | 10331 | 0 | |
9838 | 10331 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/19/2018 | 04/18/2018 | 9161 | 19,699,500.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor E | UPP | Scale Inhibitor | Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.00224541 | 4262.3 |
DETA phosphonate | 15827-60-8 | 5 | 0.00224541 | 4262.3 | ||||
Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 20 | 0.00898164 | 17049.2 | ||||
Sand | UPP | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 12.1819 | 23,124,000.0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | DETA phosphonate | 15827-60-8 | 5 | 0.00224541 | 4262.3 | |
Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00312778 | 5937.23 | ||||
Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00312778 | 5937.23 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000288373 | 547.399 | ||||
Ethylene glycol | 107-21-1 | 20 | 0.00115349 | 2189.59 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000867 | 16.453 | ||||
Methanol | 67-56-1 | 5 | 0.00004334 | 82.265 | ||||
Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00312778 | 5937.23 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.00813222 | 15436.8 | ||||
Thiourea | 62-56-6 | 1 | 0.00000867 | 16.453 | ||||
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.00224541 | 4262.3 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000433378 | 822.65 | ||||
AP Breaker | UPP | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00000948 | 18 | |
Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.603 | 164,392,000.0 | |
I-7L | UPP | Iron Control | Ammonium glycolate | 35249-89-9 | 20 | 0.00115349 | 2189.59 | |
Ethylene glycol | 107-21-1 | 20 | 0.00115349 | 2189.59 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000288373 | 547.399 | ||||
Unihib G | UPP | Acid inhibitor | Formaldehyde | 50-00-0 | 1 | 0.00000867 | 16.453 | |
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000433378 | 822.65 | ||||
Methanol | 67-56-1 | 5 | 0.00004334 | 82.265 | ||||
Thiourea | 62-56-6 | 1 | 0.00000867 | 16.453 | ||||
Butyl diglycol | 112-34-5 | 75 | 0.000650066 | 1233.97 | ||||
Unislick ST50 | UPP | Friction reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0187667 | 35623.4 | |
Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00312778 | 5937.23 | ||||
Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00312778 | 5937.23 | ||||
Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00312778 | 5937.23 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.00813222 | 15436.8 | ||||
HCL Acid (15%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.00118942 | 2257.8 | |
HCL Acid (7.5%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0804688 | 152748 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-04-19 | H2O | 15 | 7450 Bbl | 349999 | Universal Well Services Inc. | STAGE 1 OF 47 |
2018-05-02 | H2O | 7 | 8729 Bbl | 371785 | Universal Well Services Inc. | STAGE 47 OF 47…SEE IMAGES FOR STAGES 2-46 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 5234171 | 0 | 209 |
2019 | ASCENT RESOURCES UTICA LLC | 1047851 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 35715 | 209 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 7398 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1582763012 | 2019-10-23 0:00 | PW | No Violations | 1.00 |
0963129231 | 2017-08-24 | Drill / Deepen / Reopen | No Violations | |
1504786198 | 2017-09-07 | Casing String Witnessed | No Violations | I am on site today to witness the cementing of the 18.625 inch mine string casing. Falcon Drilling rig 26 drilled a 24 inch diameter hole to a depth of 185 feet and set 168 feet of 18.625 inch, 87.5 pound per foot casing. O-Tex pumped 30 barrels of gel then 425 sacks of class A cement, 1.2 yield, 15.6 pound per gallon, 2 percent Calcium Chloride. Two voids were identified from 103 feet to 106 feet and from 130 feet to 135 feet, two baskets were set at 108 feet and 106 feet to avoid the upper void (conductor to 100 feet). O-Tex displaced with 50 barrels of fresh water to land the plug. Cement did not circulate to surface. Falcon ran approximately 100 feet of one inch tremie pipe down the backside of the 18.625 inch casing. O-Tex pumped 6 barrels of class A, 1.2 yield, 15.6 pound per gallon cement to set the basket. After 3 failed top out attempts I left the job, they plan to wait until O-Tex can bring out some sodium silicate in approximately 4 hours to attempt to top out again. After a total of 8 top outs (680 sacks), cement returned to surface and remained static. |
1514477853 | 2017-12-28 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed patterson 284 had reached total depth of 21,736 feet. They are currently tripping out of the hole and have around 3500 feet to go. Company man Ted Snelling believes they will start running 5.5 inch diameter production casing this evening and cement production casing tomorrow. |
1520967320 | 2018-03-13 | Preliminary Restoration | No Violations | On the day of my inspection I found a Universal frac crew setting up the pad for frac job. Water tanks and containment are onsite, no frac pump. 7-15 frac stacks are on all wells. 2H, 5H, and 7H are the first wells planned for stimulation. Outslopes of pad are vegetated and stable. Site meets requirements of ORC 1509.072A for preliminary restoration. |
1523971100 | 2018-04-17 | Completion Testing | No Violations | On the day of my inspection Universal Well Service was on location fracking this well. They are on stage 66 and should be done fracking this well by tomorrow. |
1747288351 | 2018-06-12 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that the pad has been brought online. Pad has 5 properly labeled wellheads. Production equipment includes two 500 barrel steel tanks, five GPUs, two line heaters (for the 5H and 7H wells), and seven sand seperators. These wells do not have tubing in them and are produced through the 5.5 inch diameter production casing. Set up appears to be a frac stack with well head on top of it. Flowback operations onsite have a target goal of 32.6 mmcf/day for this well but the company man Chad Patin does not think it will do over 27 mmcf/day. Wells with target goals over 20 mmcf/day have an additional line heater to supplement the GPU. Surface annular pressure is 150 psi, intermediate annular pressure is 521, and production pressure is 5072 psi. Flowback is finished on this well. Pad is stable and vegetated. Site meets requirements of 1509.072A for preliminary restoration. |
963129231 | 2017-8-24 0:00: | DD | No Violations | 2.80 |
For data sources see[10]