If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21025 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.39,"lon":-81.19,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Monroe Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: CHEW UNIT | |
License Status: Producing | |
License Date: 2007-09-05 | |
Spud Date: 2007-09-14 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2007-09-23 | |
Well Total Depth: 6150.00 ft | |
Configuration: Vertical | |
Latitude: 40.390000 | |
Longitude: -81.190000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-09-05 | Proposed Formations:CLINTON, Issued Date:9/5/2007, Expired Date:9/4/2008 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-09-23 | |
Reached Total Depth | 2007-09-23 | |
Completion Report Received | 2008-02-06 | |
Construction Permit Expires | 2008-09-04 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-03-26 | 5891 | 5996 | 123 |
5891 | 5996 | 123 | |
5891 | 5996 | 123 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 81200 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | ALLIANCE PETROLEUM CORPORATION | 1649.00 | 347.00 | 365 |
2009 | ALLIANCE PETROLEUM CORPORATION | 674.00 | 300.00 | 365 |
2010 | ALLIANCE PETROLEUM CORPORATION | 452.00 | 116.00 | 365 |
2011 | ALLIANCE PETROLEUM CORPORATION | 397.00 | 194.00 | 365 |
2012 | ALLIANCE PETROLEUM CORPORATION | 92.00 | 120.00 | 366 |
2013 | ALLIANCE PETROLEUM CORPORATION | 322.00 | 114.00 | 365 |
2014 | ALLIANCE PETROLEUM CORPORATION | 247.00 | 119.00 | 365 |
2015 | ALLIANCE PETROLEUM CORPORATION | 33.00 | 113.00 | 365 |
2016 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 91.00 | 365 |
2017 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 56.00 | 365 |
2018 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2009 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2010 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2011 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2012 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 366 |
2013 | ALLIANCE PETROLEUM CORPORATION | Brine | 135 | 365 |
2014 | ALLIANCE PETROLEUM CORPORATION | Brine | 200 | 365 |
2015 | ALLIANCE PETROLEUM CORPORATION | Brine | 182 | 365 |
2016 | ALLIANCE PETROLEUM CORPORATION | Brine | 150 | 365 |
2017 | ALLIANCE PETROLEUM CORPORATION | Brine | 75 | 365 |
2018 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1866529525 | 2008-9-10 0:00: | PL | No Violations | 0.50 |
-364450700 | 2007-9-6 0:00:0 | DD | No Violations | 1.00 |
-56695338 | 2019-10-23 0:00 | PW | No Violations | 1.00 |
0264498997 | 2017-08-16 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a 8.625 inch diameter wellhead, 4.5 inch diameter casing, 2.375 inch tubing, rods, domestic meter off 4.5 inch diameter casing and walking beam pumping unit with an electric motor. Production equipment includes a 210 barrel steel tank, 50 barrel poly brine tank and vertical separator, all in an earthen dike. Meter box is equipped with .125 inch diameter sales line orifice, no chart, and valves were open on tubing and casing. Tank is labeled. Production records current in RBDMS. |
0364450700 | 2007-09-06 | Drill / Deepen / Reopen | No Violations | Inspection revealed that they are building location at this time . No violations at this time. This will be the next location after they drill the Host well. |
1387337756 | 2019-12-2 0:00: | PW | No Violations | 0.20 |
1575466316 | 2019-12-2 0:00: | PW | No Violations | 0.70 |
1681482968 | 2019-11-27 0:00 | PW | No Violations | 2.00 |
1694341229 | 2008-01-14 | Completion Testing | No Violations | Inspection revealed that the drilling pits are closed and the location has been graded. No violations at this time. |
1866529525 | 2008-09-10 | Preliminary Restoration | No Violations | Inspection revealed that the preliminary restoration can be approved at this time. The tank battery consists of one 210 BBL oil storage tank and one plastic brine storage tank. The SPCC dike meets requirements at this time. No violations at this time. |
264498997 | 2017-8-16 0:00: | PW | No Violations | 1.00 |
For data sources see[9]