If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-055-21952 | | Well ID: 34-055-21952 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.620181533, -81.18791296 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: | + | | State: Ohio |
+ | |- | ||
+ | | County: [[Geauga_County,_Ohio|Geauga]] | ||
+ | |- | ||
+ | | Municipality: [[Hambden_Township,_Geauga_County,_Ohio|Hambden Township]] | ||
|- | |- | ||
| Operator Name: [[ALLIED OIL FIELD SERVICES LTD]] | | Operator Name: [[ALLIED OIL FIELD SERVICES LTD]] | ||
Line 13: | Line 17: | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: MONARCHINO |
|- | |- | ||
− | | | + | | License Status: Final Restoration |
|- | |- | ||
− | | | + | | License Date: 2012-01-26 |
|- | |- | ||
| Spud Date: 2007-06-03 | | Spud Date: 2007-06-03 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[BIG SKY ENERGY INC.]] |
+ | |- | ||
+ | | Final Drill Date: 2007-06-08 | ||
+ | |- | ||
+ | | Well Total Depth: 3900 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Well Status: | + | | Latitude: 41.620181533 |
+ | |- | ||
+ | | Longitude: -81.18791296 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | APP | ||
+ | | 2007-05-31 | ||
+ | | Proposed Formations:CLINTON, Issued Date:5/31/2007, Expired Date:5/30/2008 6:00:00 AM, Drilling unit acres:45.35, Proposed Well Type:OG, Proposed Well Class:POOL | ||
+ | |- | ||
+ | | Completed | ||
+ | | 2007-06-08 | ||
+ | | | ||
+ | |- | ||
+ | | Reached Total Depth | ||
+ | | 2007-06-08 | ||
+ | | | ||
+ | |- | ||
+ | | Completion Report Received | ||
+ | | 2007-09-18 | ||
+ | | | ||
+ | |- | ||
+ | | Change of Owner | ||
+ | | 2010-01-25 | ||
+ | | Operator changed from 3847, HALL & HORNING SERV INC to 8602, ALLIED OIL FIELD SERVICES LTD | ||
+ | |- | ||
+ | | APP | ||
+ | | 2010-09-02 | ||
+ | | Proposed Formations:CLINTON, Issued Date:9/2/2010, Expired Date:9/1/2012 12:00:00 PM, Drilling unit acres:45.35, Proposed Well Type:OG, Proposed Well Class: | ||
|- | |- | ||
− | | | + | | Plugged/Abandoned |
+ | | 2010-09-15 | ||
+ | | | ||
|- | |- | ||
− | | | + | | Construction Permit Expires |
+ | | 2012-09-01 | ||
+ | | | ||
|- | |- | ||
− | | | + | | Record Last Modified |
+ | | 2017-02-15 | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
+ | |- | ||
+ | | 2007-12-21 | ||
+ | | style="text-align: right;" | 3692 | ||
+ | | style="text-align: right;" | 3725 | ||
+ | | style="text-align: right;" | 67 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Perfs Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | == Stimulations Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Stimulation Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Fluid Volume |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Company |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Comments |
|- | |- | ||
− | |||
− | |||
| | | | ||
+ | | H2O | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 1500 Bbl | ||
+ | | style="text-align: right;" | 30000 | ||
| | | | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblStimulation Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2007 | ||
+ | | [[HALL & HORNING SERV INC]] | ||
+ | | style="text-align: right;" | 45 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 70 | ||
+ | |- | ||
+ | | 2008 | ||
+ | | [[HALL & HORNING SERV INC]] | ||
+ | | style="text-align: right;" | 1638 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 366 | ||
+ | |- | ||
+ | | 2009 | ||
+ | | [[HALL & HORNING SERV INC]] | ||
+ | | style="text-align: right;" | 788 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 195 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[ALLIED OIL FIELD SERVICES LTD]] | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | |} |
− | | style="text-align: | + | For data sources see<ref>{{cite web |
− | | | + | | title = Risk Based Data Management System - Production Table - Oil and Gas Data |
− | | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | | + | | date = 2019-05-07 |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | |
− | + | | accessdate = 2019-05-21 }}</ref> | |
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
|- | |- | ||
+ | | 2007 | ||
+ | | [[HALL & HORNING SERV INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 70 | ||
|- | |- | ||
− | | | + | | 2008 |
− | | style="text-align:right;" | | + | | [[HALL & HORNING SERV INC]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 805 | |
− | + | | style="text-align: right;" | 366 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2009 | ||
+ | | [[HALL & HORNING SERV INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 195 | ||
|- | |- | ||
− | | 2012 | + | | 2012 |
− | | style="text-align:right;" | 0 | + | | [[ALLIED OIL FIELD SERVICES LTD]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 0 | |
− | | style="text-align:right;" | 0 | ||
− | |||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Ohio Department of Natural Resources | + | | title = Risk Based Data Management System - Production Table - Brine Data |
− | | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | ||
− | |||
|- | |- | ||
− | | -1152367165 | + | | 0693128958 |
+ | | 2007-10-18 | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | Pits have been filled, graded and seeded. Vegetation is established. Tank battery has been installed, affected area has been graded and seeded. Lease road from the creek east needs to be restored. Lease road is washing out, rill erosion. One 110 BBL tank and one 35 BBL tank on site. | ||
+ | |- | ||
+ | | 0886268154 | ||
+ | | 2007-06-14 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Rig has moved off, service rig has moved on. Pit liners have slipped form the north east side of the pit. Called Randy Hall informed him that pits need closed. Pits are no longer capable of contained brine. Drainage is contained on site. | ||
+ | |- | ||
+ | | 1152367165 | ||
| 2009-05-08 | | 2009-05-08 | ||
− | | | + | | Production Wells |
+ | | No Violations | ||
| Lease road has been repaired. Operator has added water bars along lease road to slow drainage. Tank battery is in good repair. | | Lease road has been repaired. Operator has added water bars along lease road to slow drainage. Tank battery is in good repair. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1160828219 | | 1160828219 | ||
| 2012-01-26 | | 2012-01-26 | ||
− | | | + | | Final Restoration |
+ | | No Violations | ||
| Site has been graded and seeded, vegetation is established. Land owner uses lease road for his own use. All equipment has been removed. Lease road is also CEI right-of-way. | | Site has been graded and seeded, vegetation is established. Land owner uses lease road for his own use. All equipment has been removed. Lease road is also CEI right-of-way. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1184350808 | | 1184350808 | ||
| 2007-07-13 | | 2007-07-13 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Well head has been installed, well is a rabbit well. Operator has solidified the working pit. Blow pit to the east of the working pit has not been solidified or closed. Pit linear has slipped from all sides of the pit. North end of the pit landowner has enlarged the pit. The pit is on a hill, the backside of the pit was checked, there was no indication of brine release down the hill. East of the pits and south of the pits approximately 6 small maple trees 10 | + | | Violations Noted |
− | + | | Well head has been installed, well is a rabbit well. Operator has solidified the working pit. Blow pit to the east of the working pit has not been solidified or closed. Pit linear has slipped from all sides of the pit. North end of the pit landowner has enlarged the pit. The pit is on a hill, the backside of the pit was checked, there was no indication of brine release down the hill. East of the pits and south of the pits approximately 6 small maple trees 10-15 & 2-3 in diameter were showing signs of distress. Leaves were browning out. I spoke to Dan Horning on site, the trees could either be stressed from brine leaching into the soil or from drilling. Dan and the landowner was informed that they area was not suitable for pits to be cut and squeezed. Blow pit must be solidified and closed. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1218806218 | | 1218806218 | ||
| 2008-08-13 | | 2008-08-13 | ||
− | | | + | | Production Wells |
+ | | No Violations | ||
| On site with Ed Schultz and Dan Horning from Hall and Horning. Also on site with Jay Cheslock DMRM supervisor. Lease road going down hill to the tank battery is not stable, it has rill erosion and gully erosion forming. Lease road is washing out from the top of the hill to the bottom. Sediment is being deposited at the bottom of the hill by a stream. Slope will needs stabilized, lease road needs to be constructed out of durable material. Suggested to operator that water bars may help slow the water. Diverting water at the top of the hill will also slow the velocity of the water. Tank battery is at the bottom of the hill. Operator is using a load line from the bottom of the hill to the top to of the hill to unload brine from the tank. Operator was advised to make repairs as quickly as possible. Well site is stable, vegetation is established. | | On site with Ed Schultz and Dan Horning from Hall and Horning. Also on site with Jay Cheslock DMRM supervisor. Lease road going down hill to the tank battery is not stable, it has rill erosion and gully erosion forming. Lease road is washing out from the top of the hill to the bottom. Sediment is being deposited at the bottom of the hill by a stream. Slope will needs stabilized, lease road needs to be constructed out of durable material. Suggested to operator that water bars may help slow the water. Diverting water at the top of the hill will also slow the velocity of the water. Tank battery is at the bottom of the hill. Operator is using a load line from the bottom of the hill to the top to of the hill to unload brine from the tank. Operator was advised to make repairs as quickly as possible. Well site is stable, vegetation is established. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1406318673 |
− | |||
| 2008-08-13 | | 2008-08-13 | ||
− | | | + | | Production Wells |
− | | | + | | No Violations |
− | |||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 1485966846 | | 1485966846 | ||
| 2010-09-15 | | 2010-09-15 | ||
− | | | + | | Plug / Plug Back |
+ | | No Violations | ||
| The well was plugged to abandon. The entire plugging operation was witnessed. | | The well was plugged to abandon. The entire plugging operation was witnessed. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1658110161 |
| 2007-06-07 | | 2007-06-07 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Fuel tanks on the back trailer has leaked onto the ground. Operator has pads socking up the fuel spill. More controls are needed. Spill is a few gallons. Drill depth is 3500 | + | | No Violations |
− | + | | Fuel tanks on the back trailer has leaked onto the ground. Operator has pads socking up the fuel spill. More controls are needed. Spill is a few gallons. Drill depth is 3500. Drilling on foam, pits are good. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1671186144 | | 1671186144 | ||
| 2008-08-05 | | 2008-08-05 | ||
− | | | + | | Preliminary Restoration |
+ | | No Violations | ||
| Frac tank remains at the top of the hill, tank needs removed. Lease road from the top of the hill to the bottom of the hill is eroding. Lease road needs stabilized. Operator is using a load line to empty tank battery. There was a line from the bottom of the hill to the top. Well head site reclamation is outstanding. Operator used a temporary culvert for the stream crossing, culvert has been removed and is in the weeds, culvert needs removed from the site. | | Frac tank remains at the top of the hill, tank needs removed. Lease road from the top of the hill to the bottom of the hill is eroding. Lease road needs stabilized. Operator is using a load line to empty tank battery. There was a line from the bottom of the hill to the top. Well head site reclamation is outstanding. Operator used a temporary culvert for the stream crossing, culvert has been removed and is in the weeds, culvert needs removed from the site. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | |} | ||
+ | ==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
|- | |- | ||
− | | | + | | 1184350808 |
− | + | | US-OH-104880 | |
− | + | | 2007-07-13 | |
− | |||
− | |||
− | |||
− | |||
− | |- | ||
− | |||
− | |||
− | | 2007- | ||
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | Dike or pit not able to prevent escape of Brine or other wastes | ||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-055-21952 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.620181533,"lon":-81.18791296,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Hambden Township | |
Operator Name: ALLIED OIL FIELD SERVICES LTD | |
Well Pad ID: | |
Farm/Lease Name: MONARCHINO | |
License Status: Final Restoration | |
License Date: 2012-01-26 | |
Spud Date: 2007-06-03 | |
Spud Drilling Contractor: BIG SKY ENERGY INC. | |
Final Drill Date: 2007-06-08 | |
Well Total Depth: 3900 ft | |
Configuration: Vertical | |
Latitude: 41.620181533 | |
Longitude: -81.18791296 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-05-31 | Proposed Formations:CLINTON, Issued Date:5/31/2007, Expired Date:5/30/2008 6:00:00 AM, Drilling unit acres:45.35, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-06-08 | |
Reached Total Depth | 2007-06-08 | |
Completion Report Received | 2007-09-18 | |
Change of Owner | 2010-01-25 | Operator changed from 3847, HALL & HORNING SERV INC to 8602, ALLIED OIL FIELD SERVICES LTD |
APP | 2010-09-02 | Proposed Formations:CLINTON, Issued Date:9/2/2010, Expired Date:9/1/2012 12:00:00 PM, Drilling unit acres:45.35, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2010-09-15 | |
Construction Permit Expires | 2012-09-01 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-12-21 | 3692 | 3725 | 67 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 1500 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | HALL & HORNING SERV INC | 45 | 0 | 70 |
2008 | HALL & HORNING SERV INC | 1638 | 0 | 366 |
2009 | HALL & HORNING SERV INC | 788 | 0 | 195 |
2012 | ALLIED OIL FIELD SERVICES LTD | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | HALL & HORNING SERV INC | Brine | 0 | 70 |
2008 | HALL & HORNING SERV INC | Brine | 805 | 366 |
2009 | HALL & HORNING SERV INC | Brine | 0 | 195 |
2012 | ALLIED OIL FIELD SERVICES LTD | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0693128958 | 2007-10-18 | Preliminary Restoration | No Violations | Pits have been filled, graded and seeded. Vegetation is established. Tank battery has been installed, affected area has been graded and seeded. Lease road from the creek east needs to be restored. Lease road is washing out, rill erosion. One 110 BBL tank and one 35 BBL tank on site. |
0886268154 | 2007-06-14 | Drill / Deepen / Reopen | No Violations | Rig has moved off, service rig has moved on. Pit liners have slipped form the north east side of the pit. Called Randy Hall informed him that pits need closed. Pits are no longer capable of contained brine. Drainage is contained on site. |
1152367165 | 2009-05-08 | Production Wells | No Violations | Lease road has been repaired. Operator has added water bars along lease road to slow drainage. Tank battery is in good repair. |
1160828219 | 2012-01-26 | Final Restoration | No Violations | Site has been graded and seeded, vegetation is established. Land owner uses lease road for his own use. All equipment has been removed. Lease road is also CEI right-of-way. |
1184350808 | 2007-07-13 | Drill / Deepen / Reopen | Violations Noted | Well head has been installed, well is a rabbit well. Operator has solidified the working pit. Blow pit to the east of the working pit has not been solidified or closed. Pit linear has slipped from all sides of the pit. North end of the pit landowner has enlarged the pit. The pit is on a hill, the backside of the pit was checked, there was no indication of brine release down the hill. East of the pits and south of the pits approximately 6 small maple trees 10-15 & 2-3 in diameter were showing signs of distress. Leaves were browning out. I spoke to Dan Horning on site, the trees could either be stressed from brine leaching into the soil or from drilling. Dan and the landowner was informed that they area was not suitable for pits to be cut and squeezed. Blow pit must be solidified and closed. |
1218806218 | 2008-08-13 | Production Wells | No Violations | On site with Ed Schultz and Dan Horning from Hall and Horning. Also on site with Jay Cheslock DMRM supervisor. Lease road going down hill to the tank battery is not stable, it has rill erosion and gully erosion forming. Lease road is washing out from the top of the hill to the bottom. Sediment is being deposited at the bottom of the hill by a stream. Slope will needs stabilized, lease road needs to be constructed out of durable material. Suggested to operator that water bars may help slow the water. Diverting water at the top of the hill will also slow the velocity of the water. Tank battery is at the bottom of the hill. Operator is using a load line from the bottom of the hill to the top to of the hill to unload brine from the tank. Operator was advised to make repairs as quickly as possible. Well site is stable, vegetation is established. |
1406318673 | 2008-08-13 | Production Wells | No Violations | |
1485966846 | 2010-09-15 | Plug / Plug Back | No Violations | The well was plugged to abandon. The entire plugging operation was witnessed. |
1658110161 | 2007-06-07 | Drill / Deepen / Reopen | No Violations | Fuel tanks on the back trailer has leaked onto the ground. Operator has pads socking up the fuel spill. More controls are needed. Spill is a few gallons. Drill depth is 3500. Drilling on foam, pits are good. |
1671186144 | 2008-08-05 | Preliminary Restoration | No Violations | Frac tank remains at the top of the hill, tank needs removed. Lease road from the top of the hill to the bottom of the hill is eroding. Lease road needs stabilized. Operator is using a load line to empty tank battery. There was a line from the bottom of the hill to the top. Well head site reclamation is outstanding. Operator used a temporary culvert for the stream crossing, culvert has been removed and is in the weeds, culvert needs removed from the site. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1184350808 | US-OH-104880 | 2007-07-13 | Dike or pit not able to prevent escape of Brine or other wastes |
For data sources see[9]