X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-119-28754"

m
m
Line 11: Line 11:
 
| County: [[Muskingum_County,_Ohio|Muskingum]]
 
| County: [[Muskingum_County,_Ohio|Muskingum]]
 
|-
 
|-
| Municipality: [[Meigs_Township,_Muskingum_County,_Ohio|Meigs Township]]
+
| Municipality: [[Meigs Township,_Muskingum_County,_Ohio|Meigs Township]]
 
|-
 
|-
 
| Operator Name: [[ARTEX ENERGY GROUP LLC]]
 
| Operator Name: [[ARTEX ENERGY GROUP LLC]]

Revision as of 00:44, 13 August 2019

Well Details

Well ID: 34-119-28754
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Meigs Township
Operator Name: ARTEX ENERGY GROUP LLC
Well Pad ID: US-OH-000479
Farm/Lease Name: FREC MUSK MEIGS
License Status: Drilling
License Date: 2016-08-16
Spud Date: 2012-02-06
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 39.801287936
Longitude: -81.71686082

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-01-20 Proposed Formations:TRENTON/BLACK RIVER, Issued Date:1/20/2012, Expired Date:1/19/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Change of Owner 2014-11-10 Operator changed from 8798, ANADARKO E & P ONSHORE LLC to 5352, ARTEX OIL COMPANY
APP 2016-08-16 Proposed Formations:, Issued Date:8/16/2016, Expired Date:8/16/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:TI
Construction Permit Expires 2017-08-16 STATUS CHANGE CONDUCTOR WAS SET AND WELL WAS DRILLED TO APPROXIMATELY 600'. CASING AND MOUSE HOLE HAVE HAD OPEN CASING SPOT WELDED SHUT AND AREA FILLED WITH GRAVEL. NO ACTIVITY HAS OCCURRED SINCE-ALE Inactive status expired-TE
Change of Owner 2019-05-23 Operator changed from 5352, ARTEX OIL COMPANY to 9897, ARTEX ENERGY GROUP LLC
Record Last Modified 2019-05-23 STATUS CHANGE CONDUCTOR WAS SET AND WELL WAS DRILLED TO APPROXIMATELY 600'. CASING AND MOUSE HOLE HAVE HAD OPEN CASING SPOT WELDED SHUT AND AREA FILLED WITH GRAVEL. NO ACTIVITY HAS OCCURRED SINCE-ALE Inactive status expired-TE

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0082175982 2013-01-30 Drill / Deepen / Reopen No Violations Well is not drilled. Waiting on drill rig. Conductor and tin horn are in place.
0122106257 2015-11-04 Not Drilled No Violations An inspection of this well location revealed tin horn and 130 of conductor have been installed. The well was never drilled past that depth. The tin horn and conductor was observed at the surface. The conductor casing has been plated and welded. Well status in RBDMS is Not Drilled (ND). Time of inspection: 12:30 PM. Weather: 78*F, Sunny
0528537143 2013-07-10 Drill / Deepen / Reopen No Violations Brad Sellers and I looked at the pad where the top hole was set but no surface pipe has been ran. Company has casings wleded and plated over but they set with well spudded.
0650632978 2018-06-19 Drill / Deepen / Reopen No Violations The inspection was conducted under hot, humid and dry conditions. The temperature was 84 degrees Fahrenheit. The inspection is due to Temporary Inactive status follow-up. The 8- foot tin horn was somewhat exposed to the surface and the 20- inch conductor was exposed with a plate and identification welded on the top. The 16- inch mouse hole has a welded-on plate on the top of the casing. There is a fence enclosing the equipment with an identification attached to the fence.
0942123105 2016-05-31 Drill / Deepen / Reopen No Violations On the day of my inspection Aaron Evilsizor accompanied me on my inspection. The wells are requested for Temporary Inactive Status. I showed Aaron that tops of the casing will be welded with a solid cap. The tin horns were filled up with pea gravel.
1205118381 2012-09-11 Drill / Deepen / Reopen No Violations Tin horn is in place and conductor pipe is in place with plate welded to it. No rig at this time.
1470855137 2016-08-09 Drill / Deepen / Reopen No Violations On the day of inspection the purpose is for Temporary Inactive status. The haul road that goes West off of Prouty road starts at coordinates of 39.80667,---28745 and 119-28754. The road across the haul road to the south is at coordinates of 39.79985,--
1907106016 2012-02-07 Drill / Deepen / Reopen No Violations On day of inspection Ziggenfuss was drilling at depth of 320of 19open hole.On Monday 2-6-12 rig spudded and set 130of 20conductor.
1993011323 2013-02-05 Drill / Deepen / Reopen No Violations I accompanied Pat Shreve on the inspection of this well. The tin horn was in place but there was no rig at the time of inspection.

For data sources see[3]

References