X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0164210110000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0164210110000
 
| Well ID: 0164210110000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.31975700000003826, -112.76366299999995135 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.319757, -112.763663 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-01-016-21W4/0
 
| Location: 00/10-01-016-21W4/0
 +
|-
 +
| Location Alias: 00/10-01-16-21 W4M
 +
|-
 +
| Location Alias 2: 00/10-01-016-21 W4/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Vulcan County,_Alberta|Vulcan County]]
 
|-
 
|-
 
| Well Name: COMPTON LONGCO 10-1-16-21
 
| Well Name: COMPTON LONGCO 10-1-16-21
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0072655
 
|-
 
|-
 
| License Date: 1978-10-27
 
| License Date: 1978-10-27
 
|-
 
|-
| Final Drilling Date: 1979-02-05
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 1979-01-29
 +
|-
 +
| Final Drill Date: 1979-02-05
 +
|-
 +
| Well Total Depth: 1381 m
 +
|-
 +
| Surface Hole Latitude: 50.319757
 +
|-
 +
| Surface Hole Longitude: -112.763663
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1979-02-18
 +
| Perforation
 +
| style="text-align: right;" | 1309
 +
| style="text-align: right;" | 1309.3
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1979-02-18
 +
| Perforation
 +
| style="text-align: right;" | 1352
 +
| style="text-align: right;" | 1352.6
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1979-02-18
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1309
 +
| style="text-align: right;" | 1352.6
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-02-22
 +
| Perforation
 +
| style="text-align: right;" | 1322.5
 +
| style="text-align: right;" | 1323
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1981-06-16
 +
| Perforation
 +
| style="text-align: right;" | 1317.7
 +
| style="text-align: right;" | 1318
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1981-06-18
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1309
 +
| style="text-align: right;" | 1318
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-06-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1316
 +
| style="text-align: right;" | 1321
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-06-20
 +
| Perforation
 +
| style="text-align: right;" | 1308
 +
| style="text-align: right;" | 1310
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1988-04-19
 +
| Perforation
 +
| style="text-align: right;" | 1322.5
 +
| style="text-align: right;" | 1323
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 1381.0m
+
| 1988-04-20
 +
| Perforation
 +
| style="text-align: right;" | 1322
 +
| style="text-align: right;" | 1323
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Fluid Type: Gas
+
| 1988-05-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1318
 +
| style="text-align: right;" | 1321
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Abandoned Zone
+
| 1988-05-20
 +
| Perforation
 +
| style="text-align: right;" | 1310.5
 +
| style="text-align: right;" | 1312
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Well Type: Not Applicable
+
| 1988-10-20
 +
| Perforation
 +
| style="text-align: right;" | 1308
 +
| style="text-align: right;" | 1310
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 1988-10-22
 +
| Acid Treatment
 +
| style="text-align: right;" | 1308
 +
| style="text-align: right;" | 1310
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 50.31975700000003826
+
| 1989-02-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1288
 +
| style="text-align: right;" | 1296
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -112.76366299999995135
+
| 1989-02-16
 +
| Perforation
 +
| style="text-align: right;" | 1056
 +
| style="text-align: right;" | 1057.2
 +
| style="text-align: right;" | 13
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1982
 +
| style="text-align: right;" | 4149
 +
| style="text-align: right;" | 5271.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 3.0
 +
|-
 +
| 1983
 +
| style="text-align: right;" | 6098
 +
| style="text-align: right;" | 13874.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 3.2
 +
|-
 +
| 1984
 +
| style="text-align: right;" | 6303
 +
| style="text-align: right;" | 20971.6
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 11.0
 +
|-
 +
| 1985
 +
| style="text-align: right;" | 5480
 +
| style="text-align: right;" | 18941.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 4.6
 +
|-
 +
| 1986
 +
| style="text-align: right;" | 3638
 +
| style="text-align: right;" | 9297.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2.4
 +
|-
 +
| 1987
 +
| style="text-align: right;" | 4907
 +
| style="text-align: right;" | 17648.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 8.2
 +
|-
 +
| 1988
 +
| style="text-align: right;" | 4156
 +
| style="text-align: right;" | 5887.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 240.5
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 02:07, 8 June 2019

Well Details

Well ID: 0164210110000
Loading map...
Location: 00/10-01-016-21W4/0
Location Alias: 00/10-01-16-21 W4M
Location Alias 2: 00/10-01-016-21 W4/00
Province: Alberta
County/Municipality: Vulcan County
Well Name: COMPTON LONGCO 10-1-16-21
Operator Name:
License Number: 0072655
License Date: 1978-10-27
License Status: Suspension
Spud Date: 1979-01-29
Final Drill Date: 1979-02-05
Well Total Depth: 1381 m
Surface Hole Latitude: 50.319757
Surface Hole Longitude: -112.763663

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-02-18 Perforation 1309 1309.3 13
1979-02-18 Perforation 1352 1352.6 13
1979-02-18 Cement Squeeze 1309 1352.6 0
1979-02-22 Perforation 1322.5 1323 13
1981-06-16 Perforation 1317.7 1318 13
1981-06-18 Cement Squeeze 1309 1318 0
1981-06-18 Packing Device Capped w/Cement 1316 1321 0
1981-06-20 Perforation 1308 1310 13
1988-04-19 Perforation 1322.5 1323 13
1988-04-20 Perforation 1322 1323 13
1988-05-20 Packing Device Capped w/Cement 1318 1321 0
1988-05-20 Perforation 1310.5 1312 13
1988-10-20 Perforation 1308 1310 13
1988-10-22 Acid Treatment 1308 1310 0
1989-02-16 Packing Device Capped w/Cement 1288 1296 0
1989-02-16 Perforation 1056 1057.2 13

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 4149 5271.1 0.0 3.0
1983 6098 13874.1 0.0 3.2
1984 6303 20971.6 0.0 11.0
1985 5480 18941.0 0.0 4.6
1986 3638 9297.3 0.0 2.4
1987 4907 17648.9 0.0 8.2
1988 4156 5887.1 0.0 240.5

For data sources see[4]

References