If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0164210110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.319757,"lon":-112.763663,"icon":""}]} |
Location: 00/10-01-016-21W4/0 | |
Location Alias: 00/10-01-16-21 W4M | |
Location Alias 2: 00/10-01-016-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 21 | |
Section: 01 | |
County/Municipality: Vulcan County | |
Well Name: COMPTON LONGCO 10-1-16-21 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0072655 | |
License Date: 1978-10-27 | |
License Status: Abandoned | |
Spud Date: 1979-01-29 | |
Final Drill Date: 1979-02-05 | |
Well Total Depth: 1381.00 m | |
Surface Hole Latitude: 50.319757 | |
Surface Hole Longitude: -112.763663 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-10-27 | Obtained License |
1979-02-05 | Finished Drilling |
1979-02-05 | Well Mode changed to Drilled and Cased |
1979-02-06 | Drill Stem Test Performed |
1979-02-07 | Drill Stem Test Performed |
1979-02-09 | Production Casing Operation Performed |
1979-02-18 | Perforation Treatment Performed - Cement Squeeze |
1979-02-18 | Perforation Treatment Performed - Jet Perforation |
1979-02-22 | Perforation Treatment Performed - Jet Perforation |
1981-06-16 | Perforation Treatment Performed - Jet Perforation |
1981-06-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-06-18 | Perforation Treatment Performed - Cement Squeeze |
1981-06-20 | Perforation Treatment Performed - Jet Perforation |
1982-05-07 | Well Began Production |
1982-05-07 | Well Fluid changed to Gas |
1982-05-07 | Well Mode changed to Flowing |
1988-04-19 | Perforation Treatment Performed - Jet Perforation |
1988-04-20 | Perforation Treatment Performed - Jet Perforation |
1988-04-20 | Well Log Performed |
1988-05-19 | Well Log Performed |
1988-05-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-05-20 | Perforation Treatment Performed - Jet Perforation |
1988-10-20 | Perforation Treatment Performed - Jet Perforation |
1988-10-20 | Well Log Performed |
1988-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-02-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-02-16 | Perforation Treatment Performed - Jet Perforation |
1989-02-16 | Plug Back Performed |
1989-02-16 | Well Fluid changed to Gas |
1989-02-16 | Well Log Performed |
1989-02-16 | Well Mode changed to Abandoned Zone |
2020-01-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-01-28 | Plug Back Performed |
2020-03-12 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-02-18 | Perforation | 1309.00 | 1309.30 | 13 |
1988-04-20 | Perforation | 1322.00 | 1323.00 | 13 |
1988-05-20 | Packing Device Capped w/Cement | 1318.00 | 1321.00 | 0 |
1988-05-20 | Perforation | 1310.50 | 1312.00 | 13 |
1988-10-20 | Perforation | 1308.00 | 1310.00 | 13 |
1988-10-22 | Acid Treatment | 1308.00 | 1310.00 | 0 |
1989-02-16 | Packing Device Capped w/Cement | 1288.00 | 1296.00 | 0 |
1989-02-16 | Perforation | 1056.00 | 1057.20 | 13 |
2020-01-28 | Packing Device Capped w/Cement | 1039.00 | 1047.00 | 0 |
1979-02-18 | Perforation | 1352.00 | 1352.60 | 13 |
1979-02-18 | Cement Squeeze | 1309.00 | 1352.60 | 0 |
1979-02-22 | Perforation | 1322.50 | 1323.00 | 13 |
1981-06-16 | Perforation | 1317.70 | 1318.00 | 13 |
1981-06-18 | Cement Squeeze | 1309.00 | 1318.00 | 0 |
1981-06-18 | Packing Device Capped w/Cement | 1316.00 | 1321.00 | 0 |
1981-06-20 | Perforation | 1308.00 | 1310.00 | 13 |
1988-04-19 | Perforation | 1322.50 | 1323.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 4149 | 0.0 | 0.0 | 0.0 |
1983 | 6098 | 0.0 | 0.0 | 0.0 |
1984 | 6303 | 0.0 | 0.0 | 0.0 |
1985 | 5480 | 0.0 | 0.0 | 0.0 |
1986 | 3638 | 0.0 | 0.0 | 0.0 |
1987 | 4907 | 0.0 | 0.0 | 0.0 |
1988 | 4156 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-01-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]