X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0524262712002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0524262712002
 
| Well ID: 0524262712002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.521245, -113.759378 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.521245, -113.759378 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/12-27-052-26W4/2
 
| Location: 00/12-27-052-26W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/12-27-052-26 W4/02
 
| Location Alias 2: 00/12-27-052-26 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 052
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 27
 
|-
 
|-
 
| County/Municipality: [[Parkland County,_Alberta|Parkland County]]
 
| County/Municipality: [[Parkland County,_Alberta|Parkland County]]
Line 17: Line 27:
 
| Well Name: CENTRAL LEDUC WILD NO. 1 WELL
 
| Well Name: CENTRAL LEDUC WILD NO. 1 WELL
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Ovintiv Canada ULC]]
 
|-
 
|-
 
| License Number: 0001842
 
| License Number: 0001842
Line 29: Line 39:
 
| Final Drill Date: 1950-09-17
 
| Final Drill Date: 1950-09-17
 
|-
 
|-
| Well Total Depth: 1565.1 m
+
| Well Total Depth: 1565.10 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.521245
 
| Surface Hole Latitude: 53.521245
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1950-08-04
 +
| Obtained License
 +
|-
 +
| 1950-08-25
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-08-28
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-08-29
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-09-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-09-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-09-17
 +
| Finished Drilling
 +
|-
 +
| 1950-09-17
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1950-09-18
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1950-09-18
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1950-11-29
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1950-12-02
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1950-12-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1950-12-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1950-12-07
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1950-12-09
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1950-12-10
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1950-12-14
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1950-12-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1951-01-07
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1962-05-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1962-05-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1962-05-26
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-05-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1962-06-05
 +
| Well Began Production
 +
|-
 +
| 1962-06-05
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1962-06-05
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1965-10-18
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1965-10-18
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1990-10-02
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1990-10-02
 +
| Plug Back Performed
 +
|-
 +
| 1990-10-02
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1990-10-02
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1990-10-03
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 201:
 
| 1950-09-18
 
| 1950-09-18
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 1559.1
+
| style="text-align: right;" | 1559.10
| style="text-align: right;" | 1561.5
+
| style="text-align: right;" | 1561.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-11-29
 
| 1950-11-29
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1559.1
+
| style="text-align: right;" | 1559.10
| style="text-align: right;" | 1561.5
+
| style="text-align: right;" | 1561.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-12-02
 
| 1950-12-02
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1562.4
+
| style="text-align: right;" | 1562.40
| style="text-align: right;" | 1563
+
| style="text-align: right;" | 1563.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1950-12-04
 
| 1950-12-04
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1562.4
+
| style="text-align: right;" | 1562.40
| style="text-align: right;" | 1563
+
| style="text-align: right;" | 1563.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-12-04
 
| 1950-12-04
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1562.4
+
| style="text-align: right;" | 1562.40
| style="text-align: right;" | 1563
+
| style="text-align: right;" | 1563.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-12-07
 
| 1950-12-07
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1560
+
| style="text-align: right;" | 1560.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1950-12-09
 
| 1950-12-09
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1560
+
| style="text-align: right;" | 1560.00
| style="text-align: right;" | 1560.3
+
| style="text-align: right;" | 1560.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1950-12-10
 
| 1950-12-10
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1560.3
+
| style="text-align: right;" | 1560.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1950-12-10
 
| 1950-12-10
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1560.3
+
| style="text-align: right;" | 1560.30
| style="text-align: right;" | 1560.6
+
| style="text-align: right;" | 1560.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1950-12-10
 
| 1950-12-10
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1560.6
+
| style="text-align: right;" | 1560.60
 
| style="text-align: right;" | 10
 
| style="text-align: right;" | 10
 
|-
 
|-
 
| 1950-12-10
 
| 1950-12-10
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1560.6
+
| style="text-align: right;" | 1560.60
| style="text-align: right;" | 1560.9
+
| style="text-align: right;" | 1560.90
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
 
|-
 
|-
 
| 1950-12-14
 
| 1950-12-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1560.6
+
| style="text-align: right;" | 1560.60
| style="text-align: right;" | 1560.9
+
| style="text-align: right;" | 1560.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1950-12-14
 
| 1950-12-14
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1560.6
+
| style="text-align: right;" | 1560.60
| style="text-align: right;" | 1560.9
+
| style="text-align: right;" | 1560.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1951-01-07
 
| 1951-01-07
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1560.9
+
| style="text-align: right;" | 1560.90
| style="text-align: right;" | 1561.2
+
| style="text-align: right;" | 1561.20
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 1962-05-24
 
| 1962-05-24
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1524
+
| style="text-align: right;" | 1524.00
| style="text-align: right;" | 1524
+
| style="text-align: right;" | 1524.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-05-25
 
| 1962-05-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1275.6
+
| style="text-align: right;" | 1275.60
| style="text-align: right;" | 1275.9
+
| style="text-align: right;" | 1275.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1962-05-26
 
| 1962-05-26
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1275.6
+
| style="text-align: right;" | 1275.60
| style="text-align: right;" | 1275.9
+
| style="text-align: right;" | 1275.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-05-29
 
| 1962-05-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1275.9
+
| style="text-align: right;" | 1275.90
| style="text-align: right;" | 1276.8
+
| style="text-align: right;" | 1276.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-10-02
 
| 1990-10-02
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1262
+
| style="text-align: right;" | 1262.00
| style="text-align: right;" | 1270
+
| style="text-align: right;" | 1270.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 190: Line 317:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 223: Line 364:
 
| 1962
 
| 1962
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 33.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 623.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1963
 
| 1963
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 123.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 770.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1964
 
| 1964
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 52.4
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 1301.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1965
 
| 1965
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 5.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 130.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 249: Line 390:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 17:26, 13 July 2020

Well Details

Well ID: 0524262712002
Loading map...
Location: 00/12-27-052-26W4/2
Location Alias: 00/12-27-52-26 W4M
Location Alias 2: 00/12-27-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 27
County/Municipality: Parkland County
Well Name: CENTRAL LEDUC WILD NO. 1 WELL
Operator Name: Ovintiv Canada ULC
License Number: 0001842
License Date: 1950-08-04
License Status: RecCertified
Spud Date: 1950-08-09
Final Drill Date: 1950-09-17
Well Total Depth: 1565.10 m
Surface Hole Latitude: 53.521245
Surface Hole Longitude: -113.759378

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-08-04 Obtained License
1950-08-25 Drill Stem Test Performed
1950-08-28 Drill Stem Test Performed
1950-08-29 Drill Stem Test Performed
1950-09-11 Drill Stem Test Performed
1950-09-17 Drill Stem Test Performed
1950-09-17 Finished Drilling
1950-09-17 Well Mode changed to Drilled and Cased
1950-09-18 Liner Casing Operation Performed
1950-09-18 Perforation Treatment Performed - Open-Hole Completion
1950-11-29 Perforation Treatment Performed - Cement Squeeze
1950-12-02 Perforation Treatment Performed - Bullet Perforation
1950-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-12-04 Perforation Treatment Performed - Cement Squeeze
1950-12-07 Perforation Treatment Performed - Bullet Perforation
1950-12-09 Perforation Treatment Performed - Bullet Perforation
1950-12-10 Perforation Treatment Performed - Bullet Perforation
1950-12-14 Perforation Treatment Performed - Bullet Perforation
1950-12-14 Perforation Treatment Performed - Jet Perforation
1951-01-07 Perforation Treatment Performed - Bullet Perforation
1962-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-05-25 Perforation Treatment Performed - Jet Perforation
1962-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-05-29 Perforation Treatment Performed - Jet Perforation
1962-06-05 Well Began Production
1962-06-05 Well Fluid changed to Crude Oil
1962-06-05 Well Mode changed to Pumping
1965-10-18 Well Fluid changed to Crude Oil
1965-10-18 Well Mode changed to Suspended
1990-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-02 Plug Back Performed
1990-10-02 Well Fluid changed to Crude Oil
1990-10-02 Well Mode changed to Abandoned
1990-10-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-18 Open Hole/Barefoot Completion 1559.10 1561.50 0
1950-11-29 Cement Squeeze 1559.10 1561.50 0
1950-12-02 Bullet Perforation 1562.40 1563.00 13
1950-12-04 Acid Treatment 1562.40 1563.00 0
1950-12-04 Cement Squeeze 1562.40 1563.00 0
1950-12-07 Bullet Perforation 1559.70 1560.00 13
1950-12-09 Bullet Perforation 1560.00 1560.30 13
1950-12-10 Bullet Perforation 1559.70 1560.30 13
1950-12-10 Bullet Perforation 1560.30 1560.60 13
1950-12-10 Bullet Perforation 1559.70 1560.60 10
1950-12-10 Bullet Perforation 1560.60 1560.90 16
1950-12-14 Perforation 1560.60 1560.90 13
1950-12-14 Bullet Perforation 1560.60 1560.90 13
1951-01-07 Bullet Perforation 1560.90 1561.20 20
1962-05-24 Packing Device Capped w/Cement 1524.00 1524.00 0
1962-05-25 Perforation 1275.60 1275.90 13
1962-05-26 Acid Treatment 1275.60 1275.90 0
1962-05-29 Perforation 1275.90 1276.80 13
1990-10-02 Packing Device Capped w/Cement 1262.00 1270.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References