X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262712002

Well Details

Well ID: 0524262712002
Loading map...
Location: 00/12-27-052-26W4/2
Location Alias: 00/12-27-52-26 W4M
Location Alias 2: 00/12-27-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 27
County/Municipality: Parkland County
Well Name: CENTRAL LEDUC WILD NO. 1 WELL
Operator Name: Ovintiv Canada ULC
License Number: 0001842
License Date: 1950-08-04
License Status: RecCertified
Spud Date: 1950-08-09
Final Drill Date: 1950-09-17
Well Total Depth: 1565.10 m
Surface Hole Latitude: 53.521245
Surface Hole Longitude: -113.759378

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-08-04 Obtained License
1950-08-25 Drill Stem Test Performed
1950-08-28 Drill Stem Test Performed
1950-08-29 Drill Stem Test Performed
1950-09-11 Drill Stem Test Performed
1950-09-17 Drill Stem Test Performed
1950-09-17 Finished Drilling
1950-09-17 Well Mode changed to Drilled and Cased
1950-09-18 Liner Casing Operation Performed
1950-09-18 Perforation Treatment Performed - Open-Hole Completion
1950-11-29 Perforation Treatment Performed - Cement Squeeze
1950-12-02 Perforation Treatment Performed - Bullet Perforation
1950-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-12-04 Perforation Treatment Performed - Cement Squeeze
1950-12-07 Perforation Treatment Performed - Bullet Perforation
1950-12-09 Perforation Treatment Performed - Bullet Perforation
1950-12-10 Perforation Treatment Performed - Bullet Perforation
1950-12-14 Perforation Treatment Performed - Bullet Perforation
1950-12-14 Perforation Treatment Performed - Jet Perforation
1951-01-07 Perforation Treatment Performed - Bullet Perforation
1962-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-05-25 Perforation Treatment Performed - Jet Perforation
1962-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-05-29 Perforation Treatment Performed - Jet Perforation
1962-06-05 Well Began Production
1962-06-05 Well Fluid changed to Crude Oil
1962-06-05 Well Mode changed to Pumping
1965-10-18 Well Fluid changed to Crude Oil
1965-10-18 Well Mode changed to Suspended
1990-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-02 Plug Back Performed
1990-10-02 Well Fluid changed to Crude Oil
1990-10-02 Well Mode changed to Abandoned
1990-10-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-18 Open Hole/Barefoot Completion 1559.10 1561.50 0
1950-12-10 Bullet Perforation 1559.70 1560.60 10
1950-12-10 Bullet Perforation 1560.60 1560.90 16
1950-12-14 Perforation 1560.60 1560.90 13
1950-12-14 Bullet Perforation 1560.60 1560.90 13
1951-01-07 Bullet Perforation 1560.90 1561.20 20
1962-05-24 Packing Device Capped w/Cement 1524.00 1524.00 0
1962-05-25 Perforation 1275.60 1275.90 13
1962-05-26 Acid Treatment 1275.60 1275.90 0
1962-05-29 Perforation 1275.90 1276.80 13
1990-10-02 Packing Device Capped w/Cement 1262.00 1270.00 0
1950-11-29 Cement Squeeze 1559.10 1561.50 0
1950-12-02 Bullet Perforation 1562.40 1563.00 13
1950-12-04 Acid Treatment 1562.40 1563.00 0
1950-12-04 Cement Squeeze 1562.40 1563.00 0
1950-12-07 Bullet Perforation 1559.70 1560.00 13
1950-12-09 Bullet Perforation 1560.00 1560.30 13
1950-12-10 Bullet Perforation 1559.70 1560.30 13
1950-12-10 Bullet Perforation 1560.30 1560.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References