X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0124162002022"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0124162002022
 
| Well ID: 0124162002022
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.0060320000000047, -112.15099399999996876 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.006032, -112.150994 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/02-20-012-16W4/2
 
| Location: 02/02-20-012-16W4/2
 
|-
 
|-
| Well Name: SPYGLASS ENCHANT 2-20-12-16
+
| Location Alias: 02/02-20-12-16 W4M
 +
|-
 +
| Location Alias 2: 02/02-20-012-16 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 012
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 16
 +
|-
 +
| Section: 20
 +
|-
 +
| County/Municipality: [[Municipal District of Taber,_Alberta|Municipal District of Taber]]
 +
|-
 +
| Well Name: SLE ENCHANT 2-20-12-16
 +
|-
 +
| Operator Name: [[SanLing Energy Ltd.]]
 +
|-
 +
| License Number: 0215796
 
|-
 
|-
 
| License Date: 1998-06-11
 
| License Date: 1998-06-11
 
|-
 
|-
| Final Drilling Date: 1998-07-10
+
| License Status: Suspension
 
|-
 
|-
| Total Depth: 1016.0m
+
| Spud Date: 1998-07-07
 
|-
 
|-
| Fluid Type: Not Applicable
+
| Final Drill Date: 1998-07-10
 
|-
 
|-
| Status: Abandoned Zone
+
| Well Total Depth: 1016.00 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 50.006032
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -112.150994
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1998-05-09
 +
| Well Log Performed
 +
|-
 +
| 1998-06-11
 +
| Obtained License
 +
|-
 +
| 1998-07-08
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1998-07-10
 +
| Finished Drilling
 +
|-
 +
| 1998-07-10
 +
| Well Log Performed
 +
|-
 +
| 1998-07-10
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Latitude: 50.0060320000000047
+
| 1998-07-11
 +
| Production Casing Operation Performed
 
|-
 
|-
| Longitude: -112.15099399999996876
+
| 1998-07-12
 +
| Rig Released
 
|-
 
|-
 +
| 1998-09-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-09-04
 +
| Well Log Performed
 +
|-
 +
| 1998-09-05
 +
| Perforation Treatment Performed - Bridge Plug No Cement Required
 +
|-
 +
| 1998-09-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-05-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-05-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-05-12
 +
| Plug Back Performed
 +
|-
 +
| 2009-05-13
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-05-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-05-13
 +
| Plug Back Performed
 +
|-
 +
| 2009-05-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-05-15
 +
| Plug Back Performed
 +
|-
 +
| 2009-12-15
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1998-09-04
 +
| Perforation
 +
| style="text-align: right;" | 996.00
 +
| style="text-align: right;" | 998.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-09-05
 +
| Bridge Plug, No Cement
 +
| style="text-align: right;" | 995.50
 +
| style="text-align: right;" | 995.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-09-05
 +
| Perforation
 +
| style="text-align: right;" | 991.00
 +
| style="text-align: right;" | 994.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-05-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 975.60
 +
| style="text-align: right;" | 983.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-05-12
 +
| Perforation
 +
| style="text-align: right;" | 870.50
 +
| style="text-align: right;" | 875.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2009-05-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 859.50
 +
| style="text-align: right;" | 867.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-05-13
 +
| Perforation
 +
| style="text-align: right;" | 853.00
 +
| style="text-align: right;" | 855.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2009-05-15
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 841.00
 +
| style="text-align: right;" | 849.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 18:41, 9 July 2020

Well Details

Well ID: 0124162002022
Loading map...
Location: 02/02-20-012-16W4/2
Location Alias: 02/02-20-12-16 W4M
Location Alias 2: 02/02-20-012-16 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 16
Section: 20
County/Municipality: Municipal District of Taber
Well Name: SLE ENCHANT 2-20-12-16
Operator Name: SanLing Energy Ltd.
License Number: 0215796
License Date: 1998-06-11
License Status: Suspension
Spud Date: 1998-07-07
Final Drill Date: 1998-07-10
Well Total Depth: 1016.00 m
Surface Hole Latitude: 50.006032
Surface Hole Longitude: -112.150994

For data sources see[1][2]

Well History

Date Event
1998-05-09 Well Log Performed
1998-06-11 Obtained License
1998-07-08 Surface Casing Operation Performed
1998-07-10 Finished Drilling
1998-07-10 Well Log Performed
1998-07-10 Well Mode changed to Drilled and Cased
1998-07-11 Production Casing Operation Performed
1998-07-12 Rig Released
1998-09-04 Perforation Treatment Performed - Jet Perforation
1998-09-04 Well Log Performed
1998-09-05 Perforation Treatment Performed - Bridge Plug No Cement Required
1998-09-05 Perforation Treatment Performed - Jet Perforation
2009-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-05-12 Perforation Treatment Performed - Jet Perforation
2009-05-12 Plug Back Performed
2009-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-05-13 Perforation Treatment Performed - Jet Perforation
2009-05-13 Plug Back Performed
2009-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-05-15 Plug Back Performed
2009-12-15 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-09-04 Perforation 996.00 998.50 13
1998-09-05 Bridge Plug, No Cement 995.50 995.80 0
1998-09-05 Perforation 991.00 994.00 13
2009-05-12 Packing Device Capped w/Cement 975.60 983.60 0
2009-05-12 Perforation 870.50 875.00 17
2009-05-13 Packing Device Capped w/Cement 859.50 867.50 0
2009-05-13 Perforation 853.00 855.00 17
2009-05-15 Packing Device Capped w/Cement 841.00 849.00 0

For data sources see[4]



References