If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-003-22112 | | Well ID: 37-003-22112 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.573514, -79.851522 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: ABERCROMBIE 1 | | Farm/Lease Name: ABERCROMBIE 1 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2010-03-12 |
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.573514 | | Latitude: 40.573514 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-03-12 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-08-11 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2010-08-19 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2010-12-15 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-09-18 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 65: | Line 131: | ||
| style="text-align: right;" | 60 | | style="text-align: right;" | 60 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2011 | | 2011 | ||
Line 74: | Line 140: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2012 | | 2012 | ||
Line 82: | Line 148: | ||
| style="text-align: right;" | 3,592.35 | | style="text-align: right;" | 3,592.35 | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 6249.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2013 | | 2013 | ||
Line 92: | Line 158: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2014 | | 2014 | ||
Line 101: | Line 167: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2015 | | 2015 | ||
Line 110: | Line 176: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2016 | | 2016 | ||
Line 119: | Line 185: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2017 | | 2017 | ||
Line 128: | Line 194: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2018 | | 2018 | ||
− | | | + | | [[MARCO DRILLING INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
|} | |} | ||
Line 151: | Line 217: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 156: | Line 223: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | Produced Fluid | + | | [[MARCO DRILLING INC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 220.00 Bbl | | style="text-align: right;" | 220.00 Bbl | ||
| ROAD SPREADING | | ROAD SPREADING | ||
Line 181: | Line 249: | ||
| 1911496 | | 1911496 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-12 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 188: | Line 256: | ||
| 1913187 | | 1913187 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-11 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 195: | Line 263: | ||
| 1913232 | | 1913232 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-16 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 202: | Line 270: | ||
| 1913238 | | 1913238 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-18 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 209: | Line 277: | ||
| 1915451 | | 1915451 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-30 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 216: | Line 284: | ||
| 1915804 | | 1915804 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-20 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 223: | Line 291: | ||
| 1917076 | | 1917076 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2010-09-03 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 230: | Line 298: | ||
| 1927786 | | 1927786 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2010-10-07 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 237: | Line 305: | ||
| 1933532 | | 1933532 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2010-12-01 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 244: | Line 312: | ||
| 1937880 | | 1937880 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2010-12-14 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 251: | Line 319: | ||
| 1939742 | | 1939742 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2010-12-14 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 258: | Line 326: | ||
| 1985421 | | 1985421 | ||
| Primary Facility | | Primary Facility | ||
− | | 06 | + | | 2011-06-09 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 293: | Line 361: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-003-22112 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.573514,"lon":-79.851522,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Indiana Township | |
Operator Name: MARCO DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: ABERCROMBIE 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-12 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.573514 | |
Longitude: -79.851522 |
Date | Event |
---|---|
2010-03-12 | New Permit Application |
2010-08-11 | Performed Spud Operation |
2010-08-19 | Drilling Completion |
2010-12-15 | Perforation |
2013-09-18 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | MARCO DRILLING INC | 1,022.00 | 60 | 0.00 | 0 | 0.00 | 0 |
2011 | MARCO DRILLING INC | 2,322.82 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | MARCO DRILLING INC | 3,592.35 | 365 | 6249.00 | 365 | 0.00 | 0 |
2013 | MARCO DRILLING INC | 3,203.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | MARCO DRILLING INC | 3,089.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | MARCO DRILLING INC | 819.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | MARCO DRILLING INC | 1,852.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | MARCO DRILLING INC | 2,112.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | MARCO DRILLING INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | MARCO DRILLING INC | Produced Fluid | 220.00 Bbl | ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1911496 | Primary Facility | 2010-08-12 | Routine/Complete Inspection | No Violations Noted | On August 12, 2010 I conducted a routine inspecion of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were present. The pits appeared to be in good condition. Repairs and additions were needed to the silt fence installation in order to match the plan on site. No erosion was leaving site. The operator was contacted and the necessary repairs were made the same day. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved. |
1913187 | Primary Facility | 2010-08-11 | Drilling/Alteration | No Violations Noted | ACCESS STILL UNDER CONSTRUCTION. SUPPORT EQUIPTMENTARRIVING ON SITE. RIG IS UP. NO PIT YET. |
1913232 | Primary Facility | 2010-08-16 | Drilling/Alteration | No Violations Noted | USE RIG 5 DRILLING AT 1560'. SITE, PIT, E&S, AND ACCESS, OK. |
1913238 | Primary Facility | 2010-08-18 | Drilling/Alteration | No Violations Noted | BIT AT 2340'. SITE, PIT, E&S, AND ACCESS, OK. |
1915451 | Primary Facility | 2010-08-30 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. IT IS HOOKED UP AND PRODUCING. PIT IS DRAINED. SITE IS CLEAN AND DOZED. |
1915804 | Primary Facility | 2010-08-20 | Drilling/Alteration | No Violations Noted | USE RIG 5 IS GONE. |
1917076 | Primary Facility | 2010-09-03 | Routine/Complete Inspection | No Violations Noted | On September 3rd, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The well was producing. No tanks on site yet. The access road was in good condition. A site ID sign and E&S plan were present. The pits were drained and empty at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved |
1927786 | Primary Facility | 2010-10-07 | Drilling/Alteration | No Violations Noted | GAS WELL IS HOOKED UP AND PRODUCING. SITE IS GRADED, AND SEEDED. PIT IS DRAINED. ACCESS IS STONED. |
1933532 | Primary Facility | 2010-12-01 | Routine/Complete Inspection | No Violations Noted | On Decmber 1st, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The well was not in production. No tanks on site yet. The access road was in good condition but needed some maintenance after the recent rain storm. A site ID sign and E&S plan were present. The pits were drained and empty at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved. |
1937880 | Primary Facility | 2010-12-14 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. EQUIPTMENT IS MOVING ONTO SITE FOR 12/15/10 OPEN HOLE FRAC. |
1939742 | Primary Facility | 2010-12-14 | Routine/Complete Inspection | No Violations Noted | On Decmber 15th, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The frac was taking place. A site ID sign and E&S plan were present. The pit appeared to be in good condition. The access road was in good condition. No spills or leaks were observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved. |
1985421 | Primary Facility | 2011-06-09 | Routine/Complete Inspection | No Violations Noted | On June 9th, 2011 I conducted a routine inspecion of the above site. The well was in production. A well tag was present. A site ID sign and E&S plan were present. The pit was closed and the site was graded. Some vegetation was coming up. The access road was in good condition. No spills or leaks were observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved. |
For data sources see[7]