Well ID: 37-003-22112
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Indiana Township
Operator Name: MARCO DRILLING INC
Well Pad ID:
Farm/Lease Name: ABERCROMBIE 1
License Status:
Spud Date:
Permit Date: 2010-03-12
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.573514
Longitude: -79.851522

For data sources see[1][2][3]

Well History

Date Event
2010-03-12 New Permit Application
2010-08-11 Performed Spud Operation
2010-08-19 Drilling Completion
2010-12-15 Perforation
2013-09-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MARCO DRILLING INC 1,022.00 60 0.00 0 0.00 0
2011 MARCO DRILLING INC 2,322.82 365 0.00 0 0.00 0
2012 MARCO DRILLING INC 3,592.35 365 6249.00 365 0.00 0
2013 MARCO DRILLING INC 3,203.00 365 0.00 0 0.00 0
2014 MARCO DRILLING INC 3,089.00 365 0.00 0 0.00 0
2015 MARCO DRILLING INC 819.00 365 0.00 0 0.00 0
2016 MARCO DRILLING INC 1,852.00 365 0.00 0 0.00 0
2017 MARCO DRILLING INC 2,112.00 365 0.00 0 0.00 0
2018 MARCO DRILLING INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 MARCO DRILLING INC Produced Fluid 220.00 Bbl ROAD SPREADING

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1911496 Primary Facility 2010-08-12 Routine/Complete Inspection No Violations Noted On August 12, 2010 I conducted a routine inspecion of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were present. The pits appeared to be in good condition. Repairs and additions were needed to the silt fence installation in order to match the plan on site. No erosion was leaving site. The operator was contacted and the necessary repairs were made the same day. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved.
1913187 Primary Facility 2010-08-11 Drilling/Alteration No Violations Noted ACCESS STILL UNDER CONSTRUCTION. SUPPORT EQUIPTMENTARRIVING ON SITE. RIG IS UP. NO PIT YET.
1913232 Primary Facility 2010-08-16 Drilling/Alteration No Violations Noted USE RIG 5 DRILLING AT 1560'. SITE, PIT, E&S, AND ACCESS, OK.
1913238 Primary Facility 2010-08-18 Drilling/Alteration No Violations Noted BIT AT 2340'. SITE, PIT, E&S, AND ACCESS, OK.
1915451 Primary Facility 2010-08-30 Drilling/Alteration No Violations Noted DRILLING COMPLETE. IT IS HOOKED UP AND PRODUCING. PIT IS DRAINED. SITE IS CLEAN AND DOZED.
1915804 Primary Facility 2010-08-20 Drilling/Alteration No Violations Noted USE RIG 5 IS GONE.
1917076 Primary Facility 2010-09-03 Routine/Complete Inspection No Violations Noted On September 3rd, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The well was producing. No tanks on site yet. The access road was in good condition. A site ID sign and E&S plan were present. The pits were drained and empty at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved
1927786 Primary Facility 2010-10-07 Drilling/Alteration No Violations Noted GAS WELL IS HOOKED UP AND PRODUCING. SITE IS GRADED, AND SEEDED. PIT IS DRAINED. ACCESS IS STONED.
1933532 Primary Facility 2010-12-01 Routine/Complete Inspection No Violations Noted On Decmber 1st, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The well was not in production. No tanks on site yet. The access road was in good condition but needed some maintenance after the recent rain storm. A site ID sign and E&S plan were present. The pits were drained and empty at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved.
1937880 Primary Facility 2010-12-14 Drilling/Alteration No Violations Noted DRILLING COMPLETE. EQUIPTMENT IS MOVING ONTO SITE FOR 12/15/10 OPEN HOLE FRAC.
1939742 Primary Facility 2010-12-14 Routine/Complete Inspection No Violations Noted On Decmber 15th, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The frac was taking place. A site ID sign and E&S plan were present. The pit appeared to be in good condition. The access road was in good condition. No spills or leaks were observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.
1985421 Primary Facility 2011-06-09 Routine/Complete Inspection No Violations Noted On June 9th, 2011 I conducted a routine inspecion of the above site. The well was in production. A well tag was present. A site ID sign and E&S plan were present. The pit was closed and the site was graded. Some vegetation was coming up. The access road was in good condition. No spills or leaks were observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.

For data sources see[7]