X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-049-25370"

m
m
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-049-25370
 
| Well ID: 37-049-25370
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 42.242391, -79.809527 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 42.242392, -79.809528 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Erie_County,_Pennsylvania|Erie]]
 +
|-
 +
| Municipality: [[North East Township,_Erie_County,_Pennsylvania|North East Township]]
 
|-
 
|-
 
| Operator Name: [[LAKE ERIE ENERGY PART LLC]]
 
| Operator Name: [[LAKE ERIE ENERGY PART LLC]]
 
|-
 
|-
| First Permit Date: 2010-09-23
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date: 2010-09-23
+
| Farm/Lease Name: CHAFFIN 1
 
|-
 
|-
| Spud Date: None
+
| License Status:  
 
|-
 
|-
| Unconventional: No
+
| Spud Date:  
 
|-
 
|-
| Horizontal: No
+
| Permit Date: 2010-09-23
 
|-
 
|-
| Violations: None
+
| Well Type: GAS
 
|-
 
|-
| Latitude: 42.242391
+
| Unconventional Well: N
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 42.242392
 +
|-
 +
| Longitude: -79.809528
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Longitude: -79.809527
+
| 2010-09-23
 +
| New Permit Application
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Job Number
!scope="col" | GAS QUANTITY
+
!scope="col" | Job Start Date
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Job End Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | True Vertical Depth (ft)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Total Water Volume (gal)
!scope="col" | OIL QUANTITY
+
!scope="col" | Total Non-Water Volume (gal)
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-0
+
|}-->
| style="text-align:right;" | 0.0
+
<!--==== Fluid Composition Data ====
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Job Number
| style="text-align:right;" | 0.0
+
!scope="col" | Trade Name
| style="text-align:right;" | 0.0
+
!scope="col" | Supplier
| style="text-align:right;" | 0.0
+
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2011-0
+
| 2010
| style="text-align:right;" | 0.0
+
| [[LAKE ERIE ENERGY PART LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011
 +
| [[LAKE ERIE ENERGY PART LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-0
+
| 2012
| style="text-align:right;" | 0.0
+
| [[LAKE ERIE ENERGY PART LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
|}-->
!scope="col" | FACILITY STATE
+
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1941721
 
| 1941721
 +
| Primary Facility
 
| 2011-01-10
 
| 2011-01-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Upon inspection today I found this new well pad site to be located right on the south edge of Woodmere Road  and stabilzed with rock. The top soil has been piled along the edge of the site as per the E&S plan. The slit fence has been installed as per the E&S Plan. The Site ID Tag and E&S Plan where both on-site. No violations found
 
| Upon inspection today I found this new well pad site to be located right on the south edge of Woodmere Road  and stabilzed with rock. The top soil has been piled along the edge of the site as per the E&S plan. The slit fence has been installed as per the E&S Plan. The Site ID Tag and E&S Plan where both on-site. No violations found
|
 
|-
 
 
|-
 
|-
 
| 1953779
 
| 1953779
 +
| Primary Facility
 
| 2011-02-28
 
| 2011-02-28
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| The purpose of my inspection today was to determine if the E&S controls are functioning  as designed during this time of heavy snow melt and rain. Upon inspection I found the entire site has been covered with stone; the slit fence was intatc and filtering as required.. The E&S Plan and Well Site ID tag where also on -site.  The pits have not been constructed yet.  
+
| The purpose of my inspection today was to determine if the E&S controls are functioning  as designed during this time of heavy snow melt and rain. Upon inspection I found the entire site has been covered with stone; the slit fence was intatc and filtering as required.. The E&S Plan and Well Site ID tag where also on -site.  The pits have not been constructed yet.
 
 
No violations.
 
|
 
|-
 
 
|-
 
|-
 
| 1954371
 
| 1954371
 +
| Primary Facility
 
| 2011-03-03
 
| 2011-03-03
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Today Jon Scott and I inspected this site to determine if the E&S controls have been functioning as designed to prevent sediment laden runoff from leaving the newly constructed well pad site during the time of heavy snow melt and rain occurring recently. Upon inspection we found the slit fence was intact and filtering as required. The site did receive run-off from vineyard area to the south ; this runoff picked up sediment on the site and carried it around the west side of the site and into the slit fence where it was contained. The access area and site have been covered with a rock base; the pits have not been constructed. We also the found the required E&S Plan and the Well Site ID tag. No violations.
 
| Today Jon Scott and I inspected this site to determine if the E&S controls have been functioning as designed to prevent sediment laden runoff from leaving the newly constructed well pad site during the time of heavy snow melt and rain occurring recently. Upon inspection we found the slit fence was intact and filtering as required. The site did receive run-off from vineyard area to the south ; this runoff picked up sediment on the site and carried it around the west side of the site and into the slit fence where it was contained. The access area and site have been covered with a rock base; the pits have not been constructed. We also the found the required E&S Plan and the Well Site ID tag. No violations.
|
 
|-
 
 
|-
 
|-
 
| 2052902
 
| 2052902
 +
| Primary Facility
 
| 2012-03-14
 
| 2012-03-14
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2084367
 
| 2084367
 +
| Primary Facility
 
| 2012-07-12
 
| 2012-07-12
 +
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 04:10, 16 May 2020

Well Details

Well ID: 37-049-25370
Loading map...
Country: United States
State: Pennsylvania
County: Erie
Municipality: North East Township
Operator Name: LAKE ERIE ENERGY PART LLC
Well Pad ID:
Farm/Lease Name: CHAFFIN 1
License Status:
Spud Date:
Permit Date: 2010-09-23
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 42.242392
Longitude: -79.809528

For data sources see[1][2][3]

Well History

Date Event
2010-09-23 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 LAKE ERIE ENERGY PART LLC 0.00 0 0.00 0 0.00 0
2011 LAKE ERIE ENERGY PART LLC 0.00 0 0.00 0 0.00 0
2012 LAKE ERIE ENERGY PART LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1941721 Primary Facility 2011-01-10 Routine/Complete Inspection No Violations Noted Upon inspection today I found this new well pad site to be located right on the south edge of Woodmere Road and stabilzed with rock. The top soil has been piled along the edge of the site as per the E&S plan. The slit fence has been installed as per the E&S Plan. The Site ID Tag and E&S Plan where both on-site. No violations found
1953779 Primary Facility 2011-02-28 Routine/Complete Inspection No Violations Noted The purpose of my inspection today was to determine if the E&S controls are functioning as designed during this time of heavy snow melt and rain. Upon inspection I found the entire site has been covered with stone; the slit fence was intatc and filtering as required.. The E&S Plan and Well Site ID tag where also on -site. The pits have not been constructed yet.
1954371 Primary Facility 2011-03-03 Routine/Complete Inspection No Violations Noted Today Jon Scott and I inspected this site to determine if the E&S controls have been functioning as designed to prevent sediment laden runoff from leaving the newly constructed well pad site during the time of heavy snow melt and rain occurring recently. Upon inspection we found the slit fence was intact and filtering as required. The site did receive run-off from vineyard area to the south ; this runoff picked up sediment on the site and carried it around the west side of the site and into the slit fence where it was contained. The access area and site have been covered with a rock base; the pits have not been constructed. We also the found the required E&S Plan and the Well Site ID tag. No violations.
2052902 Primary Facility 2012-03-14 Routine/Complete Inspection No Violations Noted
2084367 Primary Facility 2012-07-12 Site Restoration No Violations Noted

For data sources see[6]

References