X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-23364"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-23364
 
| Well ID: 37-085-23364
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.437420, -80.404778 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.437420, -80.404778 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: MILLER 4
 
| Farm/Lease Name: MILLER 4
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2004-01-15
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2003-07-25
 
| Permit Date: 2003-07-25
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.437420
 
| Latitude: 41.437420
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2003-07-25
 +
| New Permit Application
 +
|-
 +
| 2004-01-15
 +
| Performed Spud Operation
 +
|-
 +
| 2004-01-21
 +
| Drilling Completion
 +
|-
 +
| 2004-02-03
 +
| Perforation
 +
|-
 +
| 2004-05-18
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 96: Line 137:
 
| 2004
 
| 2004
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 10,879.00
+
| style="text-align: right;" | 10879
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 261.95
 
| style="text-align: right;" | 261.95
Line 105: Line 146:
 
| 2005
 
| 2005
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 19,843.00
+
| style="text-align: right;" | 19843
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 190.48
 
| style="text-align: right;" | 190.48
Line 114: Line 155:
 
| 2006
 
| 2006
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 14,393.00
+
| style="text-align: right;" | 14393.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 164.00
 
| style="text-align: right;" | 164.00
Line 123: Line 164:
 
| 2007
 
| 2007
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 9,816.00
+
| style="text-align: right;" | 9816.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 99.00
+
| style="text-align: right;" | 99
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 132: Line 173:
 
| 2008
 
| 2008
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 6,538.00
+
| style="text-align: right;" | 6538.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 43.67
 
| style="text-align: right;" | 43.67
Line 141: Line 182:
 
| 2009
 
| 2009
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 4,915.00
+
| style="text-align: right;" | 4915.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 57.73
 
| style="text-align: right;" | 57.73
Line 225: Line 266:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 30.45
 
| style="text-align: right;" | 30.45
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[L & B ENERGY LLP]]
 +
| style="text-align: right;" | 1,145.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 217.52
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 289: Line 339:
 
| 2010
 
| 2010
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 185.00 Bbl
 
| style="text-align: right;" | 185.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 296: Line 346:
 
| 2011
 
| 2011
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 303: Line 353:
 
| 2013
 
| 2013
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
 
| 34-155-21893
 
| 34-155-21893
 +
|-
 +
| 2015
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 67.00 Bbl
 +
| Injection Disposal Well
 +
| 34-007-20919
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 78.00 Bbl
 
| style="text-align: right;" | 78.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 317: Line 374:
 
| 2017
 
| 2017
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 66.00 Bbl
 
| style="text-align: right;" | 66.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 324: Line 381:
 
| 2018
 
| 2018
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 38.00 Bbl
 
| style="text-align: right;" | 38.00 Bbl
 +
| Injection Disposal Well
 +
| 34-007-21847
 +
|-
 +
| 2019
 +
| [[L & B ENERGY LLP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 54.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
 
| 34-007-21847
 
| 34-007-21847

Latest revision as of 08:42, 15 May 2020

Well Details

Well ID: 37-085-23364
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: West Salem Township
Operator Name: L & B ENERGY LLP
Well Pad ID:
Farm/Lease Name: MILLER 4
License Status: ACTIVE
Spud Date:
Permit Date: 2003-07-25
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.437420
Longitude: -80.404778

For data sources see[1][2][3]

Well History

Date Event
2003-07-25 New Permit Application
2004-01-15 Performed Spud Operation
2004-01-21 Drilling Completion
2004-02-03 Perforation
2004-05-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2003 CEDAR VALLEY ENERGY INC 0.00 0 0.00 0 0.00 0
2004 CEDAR VALLEY ENERGY INC 10879 365 261.95 365 0.00 0
2005 CEDAR VALLEY ENERGY INC 19843 365 190.48 365 0.00 0
2006 CEDAR VALLEY ENERGY INC 14393.00 365 164.00 365 0.00 0
2007 CEDAR VALLEY ENERGY INC 9816.00 365 99 365 0.00 0
2008 CEDAR VALLEY ENERGY INC 6538.00 365 43.67 365 0.00 0
2009 CEDAR VALLEY ENERGY INC 4915.00 365 57.73 365 0.00 0
2010 CEDAR VALLEY ENERGY INC 5,010.00 365 229.06 365 0.00 0
2011 CEDAR VALLEY ENERGY INC 3,867.00 365 0.00 0 0.00 0
2012 CEDAR VALLEY ENERGY INC 2,486.00 365 48.77 365 0.00 0
2013 CEDAR VALLEY ENERGY INC 2,091.00 365 72.31 365 0.00 0
2014 CEDAR VALLEY ENERGY INC 1,723.00 365 0.00 0 0.00 0
2015 CEDAR VALLEY ENERGY INC 1,436.00 365 0.00 0 0.00 0
2016 L & B ENERGY LLP 1,574.00 365 47.28 365 0.00 0
2017 L & B ENERGY LLP 991.00 365 0.00 0 0.00 0
2018 L & B ENERGY LLP 855.00 365 30.45 365 0.00 0
2019 L & B ENERGY LLP 1,145.00 365 217.52 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2004 CEDAR VALLEY ENERGY INC Brine 693.00 Bbl Injection Disposal Well 1893 1894 3203
2005 CEDAR VALLEY ENERGY INC Brine 50.00 Bbl Reuse other than road spreading
2005 CEDAR VALLEY ENERGY INC Brine 294.00 Bbl Injection Disposal Well
2006 CEDAR VALLEY ENERGY INC Brine 202.00 Bbl Injection Disposal Well
2008 CEDAR VALLEY ENERGY INC Brine 85.00 Bbl Other 3415523795
2009 CEDAR VALLEY ENERGY INC Brine 40.00 Bbl Injection Disposal Well OH-3415523795
2010 CEDAR VALLEY ENERGY INC Produced Fluid 185.00 Bbl Injection Disposal Well 34-155-23795
2011 CEDAR VALLEY ENERGY INC Produced Fluid 80.00 Bbl Injection Disposal Well 34-155-23795
2013 CEDAR VALLEY ENERGY INC Produced Fluid 40.00 Bbl Injection Disposal Well 34-155-21893
2015 CEDAR VALLEY ENERGY INC Produced Fluid 67.00 Bbl Injection Disposal Well 34-007-20919
2016 L & B ENERGY LLP Produced Fluid 78.00 Bbl Injection Disposal Well 34-007-20919
2017 L & B ENERGY LLP Produced Fluid 66.00 Bbl Injection Disposal Well 34-155-24063
2018 L & B ENERGY LLP Produced Fluid 38.00 Bbl Injection Disposal Well 34-007-21847
2019 L & B ENERGY LLP Produced Fluid 54.00 Bbl Injection Disposal Well 34-007-21847

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1329556 Primary Facility 2004-04-21 Administrative/File Review No Violations Noted Well record review

For data sources see[7]

References