If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 86: | Line 86: | ||
|- | |- | ||
| 2011 | | 2011 | ||
− | | | + | | [[ENERVEST OPR LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 131: | Line 131: | ||
|- | |- | ||
| 2016 | | 2016 | ||
− | | | + | | [[ENERVEST OPR LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 140: | Line 140: | ||
|- | |- | ||
| 2017 | | 2017 | ||
− | | | + | | [[ENERVEST OPR LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 149: | Line 149: | ||
|- | |- | ||
| 2018 | | 2018 | ||
− | | | + | | [[ENERVEST OPR LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 167: | Line 167: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 172: | Line 173: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2012- | + | | 2012 |
+ | | [[ENERVEST OPR LLC]] | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 181.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[ENERVEST OPR LLC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 599.00 Bbl | | style="text-align: right;" | 599.00 Bbl | ||
Line 178: | Line 187: | ||
| 34-007-24523 | | 34-007-24523 | ||
|- | |- | ||
− | | | + | | 2013 |
− | + | | [[ENERVEST OPR LLC]] | |
− | | | ||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 753.00 Bbl | | style="text-align: right;" | 753.00 Bbl | ||
Line 190: | Line 194: | ||
| 34-007-24523 | | 34-007-24523 | ||
|- | |- | ||
− | | 2013 | + | | 2013 |
+ | | [[ENERVEST OPR LLC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 446.00 Bbl | | style="text-align: right;" | 446.00 Bbl | ||
Line 196: | Line 201: | ||
| | | | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
+ | | [[ENERVEST OPR LLC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 1,408.02 Bbl | | style="text-align: right;" | 1,408.02 Bbl | ||
Line 202: | Line 208: | ||
| 34-007-24523 | | 34-007-24523 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
+ | | [[ENERVEST OPR LLC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 2.42 Bbl | | style="text-align: right;" | 2.42 Bbl |
Well ID: 37-039-25753 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.798,"lon":-80.328583,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Crawford | |
Municipality: Spring Township | |
Operator Name: ENERVEST OPR LLC | |
Well Pad ID: | |
Farm/Lease Name: MILLER 1 | |
License Status: Active | |
Spud Date: 2012-01-06 | |
Permit Date: 2011-12-21 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.7980 | |
Longitude: -80.328583 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | ENERVEST OPR LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | ENERVEST OPR LLC | 3,632.00 | 245 | 0.00 | 0 | 0.00 | 0 |
2013 | ENERVEST OPR LLC | 4,997.00 | 365 | 63.11 | 365 | 0.00 | 0 |
2014 | ENERVEST OPR LLC | 3,724.57 | 365 | 124.78 | 365 | 0.00 | 0 |
2015 | ENERVEST OPR LLC | 80.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2016 | ENERVEST OPR LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | ENERVEST OPR LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | ENERVEST OPR LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | ENERVEST OPR LLC | Produced Fluid (in Barrels) | 181.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | ENERVEST OPR LLC | Produced Fluid (in Barrels) | 599.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24523 |
2013 | ENERVEST OPR LLC | Produced Fluid (in Barrels) | 753.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24523 |
2013 | ENERVEST OPR LLC | Produced Fluid (in Barrels) | 446.00 Bbl | ROAD SPREADING | |
2014 | ENERVEST OPR LLC | Produced Fluid (in Barrels) | 1,408.02 Bbl | INJECTION DISPOSAL WELL | 34-007-24523 |
2014 | ENERVEST OPR LLC | Produced Fluid (in Barrels) | 2.42 Bbl | STORAGE PENDING DISPOSAL OR REUSE |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2029692 | Primary Facility | 2011-12-27 | Routine/Complete Inspection | No Violations Noted | Upon inspection today I found a new well access road and well pad under construction. The Site ID- Permit and E&S Plan where posted. The access road was stoned; the well pad was being stoned while on-site and the pits being dug. One item of concern was that a top soil pile was approx 15' from a blue line stream w/o BMPs to control run-off. I called Drilling Supervisor, Jeff Foley and explained that BMPs to control potential run-off must be installed right away; he agreed to have the dirt contractor install whatever was needed. All setback requirerments have been met. |
2029881 | Primary Facility | 2011-12-28 | Follow-up Inspection | No Violations Noted | Today's inspection was in follow-up to my concerns identified during my 12/27/2011 inspection, and to evaluate the current status of this new well site. Upon inspection I found the items of concern I had mentioned to the Drilling Supervisor, Mr Foley had been addrssed. BMPs have been installed as requested. The well pad is still under construction The Site ID- Permit and E&S Plan where posted. The access road condition has in good condition. the well pad was stoned. No rig on-site. |
2032576 | Primary Facility | 2012-01-09 | Drilling/Alteration | No Violations Noted | |
2033278 | Primary Facility | 2012-01-11 | Drilling/Alteration | No Violations Noted | |
2034459 | Primary Facility | 2012-01-10 | Follow-up Inspection | No Violations Noted | Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both pits had over 4 ft of freeboard. Some sections of the slit fence needed repaired. I called the Jeff Foley, Project Manager, and he agreed to have the BMP repaired today. |
2034483 | Primary Facility | 2012-01-11 | Follow-up Inspection | No Violations Noted | Follow-up inspection to determine if the BMPs locateon the east side of the access road have been repaired. Upon inspection I found the BMP repaired; rig on-site with over 4ft of freeboard in pits. |
2035179 | Primary Facility | 2012-01-13 | Drilling/Alteration | No Violations Noted | |
2035382 | Primary Facility | 2012-01-18 | Drilling/Alteration | No Violations Noted | |
2038572 | Primary Facility | 2012-01-26 | Follow-up Inspection | No Violations Noted | Follow-up inspection to determine if the BMPs are being main tained as required to keep sediment from entering the blue line stream that borders the site to the east. Upon inspeciton I found all BMPs in good condition. The rig was still on site and the pits open with over 2 ft of freeboard. |
2068733 | Primary Facility | 2012-05-16 | Routine/Complete Inspection | No Violations Noted | |
2069109 | Primary Facility | 2012-05-18 | Routine/Partial Inspection | No Violations Noted | |
2097233 | Primary Facility | 2012-08-24 | Routine/Complete Inspection | No Violations Noted | |
2129469 | Primary Facility | 2013-01-08 | Routine/Complete Inspection | No Violations Noted | |
2175002 | Primary Facility | 2013-06-11 | Routine/Complete Inspection | No Violations Noted | |
2354704 | Primary Facility | 2015-03-24 | Routine/Complete Inspection | No Violations Noted | |
2540936 | Primary Facility | 2016-12-02 | Administrative/File Review | No Violations Noted | production review |
For data sources see[6]