If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-003-22112 | | Well ID: 37-003-22112 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.573514, -79.851522 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 08 | + | | Spud Date: 2010-08-11 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2010-03-12 |
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 65: | Line 90: | ||
| style="text-align: right;" | 60 | | style="text-align: right;" | 60 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2011 | | 2011 | ||
Line 74: | Line 99: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2012 | | 2012 | ||
Line 85: | Line 110: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2013 | | 2013 | ||
Line 92: | Line 117: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2014 | | 2014 | ||
Line 101: | Line 126: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2015 | | 2015 | ||
Line 110: | Line 135: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2016 | | 2016 | ||
Line 119: | Line 144: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2017 | | 2017 | ||
Line 128: | Line 153: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2018 | | 2018 | ||
− | | | + | | [[MARCO DRILLING INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
|} | |} | ||
Line 151: | Line 176: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 156: | Line 182: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[MARCO DRILLING INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 220.00 Bbl | | style="text-align: right;" | 220.00 Bbl | ||
Line 181: | Line 208: | ||
| 1911496 | | 1911496 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-12 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 188: | Line 215: | ||
| 1913187 | | 1913187 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-11 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 195: | Line 222: | ||
| 1913232 | | 1913232 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-16 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 202: | Line 229: | ||
| 1913238 | | 1913238 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-18 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 209: | Line 236: | ||
| 1915451 | | 1915451 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-30 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 216: | Line 243: | ||
| 1915804 | | 1915804 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2010-08-20 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 223: | Line 250: | ||
| 1917076 | | 1917076 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2010-09-03 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 230: | Line 257: | ||
| 1927786 | | 1927786 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2010-10-07 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 237: | Line 264: | ||
| 1933532 | | 1933532 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2010-12-01 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 244: | Line 271: | ||
| 1937880 | | 1937880 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2010-12-14 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 251: | Line 278: | ||
| 1939742 | | 1939742 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2010-12-14 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 258: | Line 285: | ||
| 1985421 | | 1985421 | ||
| Primary Facility | | Primary Facility | ||
− | | 06 | + | | 2011-06-09 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 293: | Line 320: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-003-22112 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.573514,"lon":-79.851522,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Indiana Township | |
Operator Name: MARCO DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: ABERCROMBIE 1 | |
License Status: Active | |
Spud Date: 2010-08-11 | |
Permit Date: 2010-03-12 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.573514 | |
Longitude: -79.851522 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | MARCO DRILLING INC | 1,022.00 | 60 | 0.00 | 0 | 0.00 | 0 |
2011 | MARCO DRILLING INC | 2,322.82 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | MARCO DRILLING INC | 3,592.35 | 365 | 6,249.00 | 365 | 0.00 | 0 |
2013 | MARCO DRILLING INC | 3,203.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | MARCO DRILLING INC | 3,089.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | MARCO DRILLING INC | 819.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | MARCO DRILLING INC | 1,852.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | MARCO DRILLING INC | 2,112.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | MARCO DRILLING INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | MARCO DRILLING INC | Produced Fluid (in Barrels) | 220.00 Bbl | ROAD SPREADING |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1911496 | Primary Facility | 2010-08-12 | Routine/Complete Inspection | No Violations Noted | On August 12, 2010 I conducted a routine inspecion of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were present. The pits appeared to be in good condition. Repairs and additions were needed to the silt fence installation in order to match the plan on site. No erosion was leaving site. The operator was contacted and the necessary repairs were made the same day. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved. |
1913187 | Primary Facility | 2010-08-11 | Drilling/Alteration | No Violations Noted | ACCESS STILL UNDER CONSTRUCTION. SUPPORT EQUIPTMENTARRIVING ON SITE. RIG IS UP. NO PIT YET. |
1913232 | Primary Facility | 2010-08-16 | Drilling/Alteration | No Violations Noted | USE RIG 5 DRILLING AT 1560'. SITE, PIT, E&S, AND ACCESS, OK. |
1913238 | Primary Facility | 2010-08-18 | Drilling/Alteration | No Violations Noted | BIT AT 2340'. SITE, PIT, E&S, AND ACCESS, OK. |
1915451 | Primary Facility | 2010-08-30 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. IT IS HOOKED UP AND PRODUCING. PIT IS DRAINED. SITE IS CLEAN AND DOZED. |
1915804 | Primary Facility | 2010-08-20 | Drilling/Alteration | No Violations Noted | USE RIG 5 IS GONE. |
1917076 | Primary Facility | 2010-09-03 | Routine/Complete Inspection | No Violations Noted | On September 3rd, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The well was producing. No tanks on site yet. The access road was in good condition. A site ID sign and E&S plan were present. The pits were drained and empty at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved |
1927786 | Primary Facility | 2010-10-07 | Drilling/Alteration | No Violations Noted | GAS WELL IS HOOKED UP AND PRODUCING. SITE IS GRADED, AND SEEDED. PIT IS DRAINED. ACCESS IS STONED. |
1933532 | Primary Facility | 2010-12-01 | Routine/Complete Inspection | No Violations Noted | On Decmber 1st, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The well was not in production. No tanks on site yet. The access road was in good condition but needed some maintenance after the recent rain storm. A site ID sign and E&S plan were present. The pits were drained and empty at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved. |
1937880 | Primary Facility | 2010-12-14 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. EQUIPTMENT IS MOVING ONTO SITE FOR 12/15/10 OPEN HOLE FRAC. |
1939742 | Primary Facility | 2010-12-14 | Routine/Complete Inspection | No Violations Noted | On Decmber 15th, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The frac was taking place. A site ID sign and E&S plan were present. The pit appeared to be in good condition. The access road was in good condition. No spills or leaks were observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved. |
1985421 | Primary Facility | 2011-06-09 | Routine/Complete Inspection | No Violations Noted | On June 9th, 2011 I conducted a routine inspecion of the above site. The well was in production. A well tag was present. A site ID sign and E&S plan were present. The pit was closed and the site was graded. Some vegetation was coming up. The access road was in good condition. No spills or leaks were observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved. |
For data sources see[6]