If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Carroll_County,_Ohio|Carroll]] | | County: [[Carroll_County,_Ohio|Carroll]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Brown Township,_Carroll_County,_Ohio|Brown Township]] |
|- | |- | ||
| Operator Name: [[ENERVEST OPERATING LLC]] | | Operator Name: [[ENERVEST OPERATING LLC]] |
Well ID: 34-019-21696 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.710563599,"lon":-81.23567794,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Brown Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: EVANICH | |
License Status: Producing | |
License Date: 1984-05-15 | |
Spud Date: 1984-06-11 | |
Spud Drilling Contractor: SHERMAN DRLG | |
Final Drill Date: 1984-06-15 | |
Well Total Depth: 5315 ft | |
Configuration: Vertical | |
Latitude: 40.710563599 | |
Longitude: -81.23567794 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1984-05-15 | Issued Date 5/15/84 Expired Date 11/11/84 Acres 0080000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05315 Proposed Drill Depth 05315 |
Original Spud | 1984-06-11 | IP = 22.5 BW |
Completed | 1984-06-15 | IP = 22.5 BW |
Reached Total Depth | 1984-06-15 | IP = 22.5 BW |
CO | 1984-07-22 | 182 BELDEN & BLAKE CO GeoDate 5/15/84 |
Completion Report Received | 1984-08-23 | IP = 22.5 BW |
Construction Permit Expires | 1984-11-11 | IP = 22.5 BW |
Change of Owner | 2002-08-06 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC |
Record Last Modified | 2017-02-15 | IP = 22.5 BW |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5101 | 5221 | 0 |
2006-09-11 | 5118 | 5218 | 37 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 4900 Bbl | 100000 | FRAC: H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | WITCO CORP | 3535 | 3995 | 365 |
1985 | WITCO CORP | 2051 | 2461 | 365 |
1986 | WITCO CORP | 1077 | 1812 | 365 |
1987 | BELDEN & BLAKE CORPORATION | 1019 | 1396 | 365 |
2001 | BELDEN & BLAKE CORPORATION | 624 | 490 | 384 |
2002 | BELDEN & BLAKE CORPORATION | 685 | 311 | 367 |
2003 | BELDEN & BLAKE CORPORATION | 639 | 401 | 365 |
2004 | BELDEN & BLAKE CORPORATION | 569 | 81 | 366 |
2005 | BELDEN & BLAKE CORPORATION | 656 | 381 | 365 |
2006 | BELDEN & BLAKE CORPORATION | 723 | 255 | 365 |
2007 | ENERVEST OPERATING LLC | 796 | 349 | 365 |
2008 | ENERVEST OPERATING LLC | 822 | 269 | 365 |
2009 | ENERVEST OPERATING LLC | 826 | 322 | 365 |
2010 | ENERVEST OPERATING LLC | 1018 | 286 | 365 |
2011 | ENERVEST OPERATING LLC | 836 | 266 | 0 |
2012 | ENERVEST OPERATING LLC | 614 | 182 | 366 |
2013 | ENERVEST OPERATING LLC | 624 | 254 | 365 |
2014 | ENERVEST OPERATING LLC | 153 | 407 | 365 |
2015 | ENERVEST OPERATING LLC | 487 | 296 | 365 |
2016 | ENERVEST OPERATING LLC | 340 | 217 | 366 |
2017 | ENERVEST OPERATING LLC | 148 | 49 | 365 |
2018 | ENERVEST OPERATING LLC | 427 | 189 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | WITCO CORP | Brine | 0 | 365 |
1985 | WITCO CORP | Brine | 998 | 365 |
1986 | WITCO CORP | Brine | 710 | 365 |
1987 | BELDEN & BLAKE CORPORATION | Brine | 485 | 365 |
2001 | BELDEN & BLAKE CORPORATION | Brine | 456 | 384 |
2002 | BELDEN & BLAKE CORPORATION | Brine | 215 | 367 |
2003 | BELDEN & BLAKE CORPORATION | Brine | 186 | 365 |
2004 | BELDEN & BLAKE CORPORATION | Brine | 147 | 366 |
2005 | BELDEN & BLAKE CORPORATION | Brine | 338 | 365 |
2006 | BELDEN & BLAKE CORPORATION | Brine | 124 | 365 |
2007 | ENERVEST OPERATING LLC | Brine | 102 | 365 |
2008 | ENERVEST OPERATING LLC | Brine | 105 | 365 |
2009 | ENERVEST OPERATING LLC | Brine | 126 | 365 |
2010 | ENERVEST OPERATING LLC | Brine | 127 | 365 |
2011 | ENERVEST OPERATING LLC | Brine | 112 | |
2012 | ENERVEST OPERATING LLC | Brine | 59 | 366 |
2013 | ENERVEST OPERATING LLC | Brine | 95 | 365 |
2014 | ENERVEST OPERATING LLC | Brine | 421 | 365 |
2015 | ENERVEST OPERATING LLC | Brine | 238 | 365 |
2016 | ENERVEST OPERATING LLC | Brine | 164 | 366 |
2017 | ENERVEST OPERATING LLC | Brine | 125 | 365 |
2018 | ENERVEST OPERATING LLC | Brine | 143 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0057638124 | 2015-03-23 | Production Wells | No Violations | I was on location to follow up to the spill that occurred on 3/22/2015. Currently Kurt Kollar of the Ohio EPA is on location and directing Enervest in the cleanup effort. The flowline has been fixed and pressure tested to ensure there are no more leaks. The hard booms, siphon damns, booms and adsorbent pads show signs of containing the free oil in the creek. The Little Sandy Creek has been walked and pockets of free oil identified for cleanup. The free oil surrounding the wellhead has been dusted with peat sorb at this time but has not been fully cleaned up. Enervest currently has two track hoes on location and continuing cleanup. Cleanup will continue for the next several days and will be monitored. |
0099408135 | 2015-05-28 | Production Wells | No Violations | I was on location to follow up to the oil spill that occurred on 3/22/2015. There is no more oil on location or entering the stream. The silt fence has been installed and the location has been seeded. Vegetation has only been partially established. The stuffing box on the wellhead is leaking and there freshly stained soil inside the dike of the well. I have contacted Troy Wells of Enervest requesting the stuffing box be replaced to stop the flow of oil from the wellhead, and all free oil be cleaned up. When vegetation is established on the hillside and the stuffing box repaired the compliance notice will be closed. A follow up will be conducted to ensure the spill has been properly remediated. |
0474645160 | 2015-04-13 | Production Wells | No Violations | I was on location to follow up to the oil spill that occurred on 3/22/2015. The soft booms and siphon damns have been removed and no additional can be seen. Enervest has installed the required silt fence, but has not seeded the hillside on location. The 300bbl production tank is still on location and is awaiting removal. A follow up will be conducted to ensure the spill has been properly remediated. |
0487277260 | 2015-03-23 | Production Wells | No Violations | I was on location to assist Inspector Fred Romeo on a flow line leak and oil release that occurred over the weekend. Kurt Kollar (OEPA), Tom Kottis (Carroll County EMA), and numerous Enervest personnel were on location assessing the clean-up. Enervest repaired the leak in the woods and had a hard boom in the drainage ditch that leads to Little Sandy Creek. An unknown amount of crude oil had leaked into the ditch and migrated into the creek. Kurt instructed the Enervest personnel as to what needed to be done with containment and clean-up of the spill. I inspected the tank battery and found it was diked and contained 1-100 barrel tank, one (1) heated separator, and two (2) vertical separation units. There is a domestic hook-up with a drip bottle and permit # 21656 also produces to this battery. There is a 300 barrel tank sitting outside the tank battery that is no longer in service. I told Troy Wells (Enervest) that the tank needs to be removed as soon as frost laws allow larger equipment on the road. Fred and I inspected the wellhead and found the well equipped with an electric pumping unit. The entire wellhead was covered with a thick coating of paraffin and a circular area, 8-10 in diameter in front of the wellhead, was saturated with crude oil. Fresh Peatsorb has been recently spread over the affected area and pockets of puddled oil were apparent around the wellhead. Inspector Romeo is going to issue a compliance notice for the spill and for the pollution and contamination around the wellhead. This clean-up continues. |
0578130998 | 2015-03-30 | Production Wells | No Violations | I was on location to follow up to the oil spill that occurred on 3/22/2015. Currently Enervest is skimming oil from the surface of the creek before the siphon damns placed in the creek. The Ohio EPA has approved the removal of the hard booms from the stream. The soft booms and siphon damns will stay in place to ensure no oil moves down the creek. Enervest will be required to install silt fence and seed the hillside on location and the hillside to prevent erosion of the hillside into the stream. A follow up will be conducted to ensure the spill has been properly remediated. |
0947676929 | 2015-04-07 | Production Wells | No Violations | I was on location to follow up to the oil spill that occurred on 3/22/2015. The soft booms and siphon damns are still in place to ensure no oil moves down the creek. An oil sheen and small amounts of oil are still entering the stream from the hillside. Enervest will be required to install silt fence and seed the hillside on location and the hillside to prevent erosion of the hillside into the stream. A follow up will be conducted to ensure the spill has been properly remediated. |
1002367764 | 2015-07-06 | Production Wells | No Violations | I was on location to follow up to the oil spill that occurred on 3/22/2015. There is no more oil on location or entering the stream. The silt fence has been installed and the location has been seeded. Vegetation has been established. The stuffing box on the well has been fixed and is not leaking oil. At this time the spill has been remediated and the compliance notice has been closed. |
1315366679 | 2015-03-25 | Production Wells | No Violations | I was on location to follow up to the oil spill that occurred on 3/22/2015. There are no contractors on location at the time of inspection. The hillside where the oil spill occurred has been excavated and cleared. The hard boom and siphon damns are still present in the creek to catch any free oil sill present. Enervest is going to be bringing out a vacuum truck tomorrow 3/26/2015 to remove the free oil from the water surface in front of the hard booms and siphon damns. The spill will be continued to be monitored to ensure cleanup is complete. |
1427117631 | 2015-03-22 | Production Wells | Violations Noted | I was on location to respond to a call regarding an oil spill from this well. At 4:35pm Tom Hill, DOGRM Northeast Regional Supervisor, was called by Kurt Kollar of the Ohio EPA and informed of a suspected spill in Stark County. I arrived on scene and met Kurt Kollar at 5:55pm. The tank battery and this well are located in Carroll County on the Stark County border. It was determined that a non-buried flow line had leaked approximately 5-10bbls of crude oil on the hillside. The spill covered approximately 5x50 down to the stream bank where the oil was entering the waterway. The stream was an unnamed tributary of the Little Sandy Creek. Approximately 1 mile of the creek has been identified to have been affected by the spill. The majority of the affected land and stream is located in Stark County. Tim McConaha and superintendent Troy Wells of Enervest were contacted informing them of the spill and to have crews dispatched to the location. The tank battery for the well is contained within a worn dike and has I.D. signage, two (2) horizontal separators, house gas connection, a 140bbl production tank and concrete brine vault. An unmarked 300bbl production tank was sitting outside of the dike and is currently unused. The well is an electrically driven pumpjack well with invalid identification stating Belden and Blake as the operator. The soil surrounding the wellhead has approximately 1 bbl of fresh oil spilled surrounding the wellhead. The wellhead is covered in heavy paraffin. A hard boom was installed in the creek by Kurt Kollar of the OEPA and multiple booms installed in the creek to isolate and prevent the oil movement during the night. The well was shut in to prevent any additional oil spill. The landowner stated that the leak was identified by a hunter during the hunting season, but the leak was not reported. Enervest has been informed that the leaking wellhead must be repaired, the spill around the wellhead cleaned up and proper identification placed on the pumpjack |
1427301472 | 2015-03-24 | Production Wells | No Violations | I conducted an inspection on site to observe spill clean-up with Regional Supervisor Tom Hill and Inspector Shannon Mullins. We walked approximately 1,000 feet of the tributary of Sandy Creek, and observed small pockets of crude oil in the stream being cleaned by Enervest at various locations. A dam was installed down stream from the hard boom and soft boom, which were put in place at the mouth of the tributary to Sandy Creek. We then walked Sandy Creek south of Chapel Street with Kurt Kollar from the Ohio EPA, and observed clean-up efforts of Sandy Creek at the source of the spill near the flowline leak where Enervest was excavating the contanimated soil. |
1612156387 | 2018-04-19 | Production Wells | No Violations | The well is equipped with a pumping unit. The tank battery is shared with PN#21656. No violations were observed at the time of inspection. |
1617726926 | 2015-04-28 | Production Wells | No Violations | I was on location to follow up to the oil spill that occurred on 3/22/2015. There is no more oil on location or entering the stream. The silt fence has been installed and the location has been seeded. Vegetation has only been partially established. The 300bbl tank has been removed from location and the area around the tank battery has been graded and a new dike installed. When vegetation is established on the hillside the compliance notice will be closed. A follow up will be conducted to ensure the spill has been properly remediated. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1427117631 | US-OH-112456 | 2015-07-20 | Well operation causing pollution and contamination | |
1427117631 | US-OH-112457 | 2015-07-20 | Failure to legibly identify well |
For data sources see[9]