X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-22290"

m
m
Line 11: Line 11:
 
| County: [[Summit_County,_Ohio|Summit]]
 
| County: [[Summit_County,_Ohio|Summit]]
 
|-
 
|-
| Municipality: Portage Township
+
| Municipality: [[Akron City,_Summit_County,_Ohio|Akron City]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]

Revision as of 05:15, 14 August 2019

Well Details

Well ID: 34-153-22290
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Akron City
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: GRIMM UNIT
License Status: Producing
License Date: 1986-09-10
Spud Date: 1986-09-20
Spud Drilling Contractor: RAPID DRILLING
Final Drill Date: 1986-09-26
Well Total Depth: 3705 ft
Configuration: Vertical
Latitude: 41.125529828
Longitude: -81.53827438

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1986-09-10 2455 WHIDBEY RESOURCES INC GeoDate 9/10/86
Oil and Gas 1986-09-10 Issued Date 9/10/86 Expired Date 9/10/87 Acres 0000000 Tool Type RTF Proposed Formation Proposed Depth 03705 Proposed Drill Depth 03705
Original Spud 1986-09-20 CORR FTG 6-10-95
Completed 1986-09-26 CORR FTG 6-10-95
Reached Total Depth 1986-09-26 CORR FTG 6-10-95
Completion Report Received 1986-11-12 CORR FTG 6-10-95
Construction Permit Expires 1987-09-10 CORR FTG 6-10-95
CO 1995-05-16 84 EVERFLOW EASTERN PTNS L P GeoDate 9/10/86
Record Last Modified 2017-02-15 CORR FTG 6-10-95

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3543 3608 24

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 110000 Gal 25000 FRAC: H2O,SAND
Not Treated 0 200 Gal 0 HOLLOW STEEL CARRIER SHOTS, 7 1/2%

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 WHIDBEY RESOURCES INC 50636 5243 365
1988 WHIDBEY RESOURCES INC 25353 3538 365
1990 WHIDBEY RESOURCES INC 23299 2632 365
1992 WHIDBEY RESOURCES INC 14604 1741 365
1993 WHIDBEY RESOURCES INC 12258 1257 365
1995 EVERFLOW EASTERN PTNS L P 9520 878 365
1996 EVERFLOW EASTERN PTNS L P 14290 1426 365
1997 EVERFLOW EASTERN PTNS L P 12328 1112 365
1998 EVERFLOW EASTERN PTNS L P 10489 704 365
1999 EVERFLOW EASTERN PTNS L P 9017 892 365
2000 EVERFLOW EASTERN PTNS L P 6643 683 365
2001 EVERFLOW EASTERN PTNS L P 4944 580 365
2002 EVERFLOW EASTERN PTNS L P 5270 601 365
2003 EVERFLOW EASTERN PTNS L P 4191 492 365
2004 EVERFLOW EASTERN PTNS L P 4159 458 365
2005 EVERFLOW EASTERN PTNS L P 3855 446 365
2006 EVERFLOW EASTERN PTNS L P 3203 529 365
2007 EVERFLOW EASTERN PTNS L P 3343 446 365
2008 EVERFLOW EASTERN PTNS L P 3302 410 365
2009 EVERFLOW EASTERN PTNS L P 3004 208 365
2010 EVERFLOW EASTERN PTNS L P 2556 292 365
2011 EVERFLOW EASTERN PTNS L P 1783 234 365
2012 EVERFLOW EASTERN PTNS L P 1388 206 366
2013 EVERFLOW EASTERN PTNS L P 1113 201 365
2014 EVERFLOW EASTERN PTNS L P 865 66 365
2015 EVERFLOW EASTERN PTNS L P 743 50 365
2016 EVERFLOW EASTERN PTNS L P 615 40 365
2017 EVERFLOW EASTERN PTNS L P 1273 121 365
2018 EVERFLOW EASTERN PTNS L P 543 75 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 WHIDBEY RESOURCES INC Brine 175 365
1988 WHIDBEY RESOURCES INC Brine 0 365
1990 WHIDBEY RESOURCES INC Brine 80 365
1992 WHIDBEY RESOURCES INC Brine 0 365
1993 WHIDBEY RESOURCES INC Brine 0 365
1995 EVERFLOW EASTERN PTNS L P Brine 173 365
1996 EVERFLOW EASTERN PTNS L P Brine 70 365
1997 EVERFLOW EASTERN PTNS L P Brine 70 365
1998 EVERFLOW EASTERN PTNS L P Brine 55 365
1999 EVERFLOW EASTERN PTNS L P Brine 0 365
2000 EVERFLOW EASTERN PTNS L P Brine 66 365
2001 EVERFLOW EASTERN PTNS L P Brine 72 365
2002 EVERFLOW EASTERN PTNS L P Brine 41 365
2003 EVERFLOW EASTERN PTNS L P Brine 69 365
2004 EVERFLOW EASTERN PTNS L P Brine 41 365
2005 EVERFLOW EASTERN PTNS L P Brine 0 365
2006 EVERFLOW EASTERN PTNS L P Brine 0 365
2007 EVERFLOW EASTERN PTNS L P Brine 87 365
2008 EVERFLOW EASTERN PTNS L P Brine 45 365
2009 EVERFLOW EASTERN PTNS L P Brine 175 365
2010 EVERFLOW EASTERN PTNS L P Brine 223 365
2011 EVERFLOW EASTERN PTNS L P Brine 222 365
2012 EVERFLOW EASTERN PTNS L P Brine 219 366
2013 EVERFLOW EASTERN PTNS L P Brine 135 365
2014 EVERFLOW EASTERN PTNS L P Brine 158 365
2015 EVERFLOW EASTERN PTNS L P Brine 197 365
2016 EVERFLOW EASTERN PTNS L P Brine 56 365
2017 EVERFLOW EASTERN PTNS L P Brine 0 365
2018 EVERFLOW EASTERN PTNS L P Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0173321368 2005-01-03 Production Wells No Violations Status check inspection - no violations at this time.
1614010977 2018-12-27 UrbanProduction Wells No Violations The well was concealed in a landscaping bed at 1250 Woodsview Drive and secured with a locked chain link fence with legible I. D, signage posted. The tank battery was shared with Grimm # 2-D and #3-D. The well was constructed as a plunger lift well. A domestic gas connection and meter was part of the wellhead assembly. The tank battery consisted of one (1) 210 barrel tank, two (2) 100 barrel tanks, one (1) 50 barrel tank and one (1) 2410 separator with orifice gas measurement meter. The load lines were plugged and the oil line was locked. The tank battery was surrounded with an earthen dike.
1993832812 2008-01-31 Production Wells No Violations Status check inspection - no violations at this time.

For data sources see[9]

References