If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2005-08-30 |
|- | |- | ||
| Spud Date: 2005-10-18 | | Spud Date: 2005-10-18 |
Well ID: 34-153-22952 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.013859895,"lon":-81.5509166,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP | |
Well Pad ID: | |
Farm/Lease Name: ALBRECHT | |
License Status: Producing | |
License Date: 2005-08-30 | |
Spud Date: 2005-10-18 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2005-10-24 | |
Well Total Depth: 4098 ft | |
Configuration: Directional | |
Latitude: 41.013859895 | |
Longitude: -81.55091660 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-08-30 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:8/30/2005, Expired Date:8/30/2006 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2005-09-02 | TARGET INFORMATION: 830'SL & 380'EL OF LOT 6, TRACT 15. X= 2,261,745, Y= 491,815. ELEV= 995'. |
Original Spud | 2005-10-18 | RBDMS Rec |
Completed | 2005-10-24 | RBDMS Rec |
Reached Total Depth | 2005-10-24 | RBDMS Rec |
Correction to Well | 2005-12-30 | CORRECTION TO TARGET INFORMATION: 980'SL & 435'EL OF LOT 6, TRACT 15; X= 2,261,685; Y= 491,970. |
Completion Report Received | 2006-02-03 | RBDMS Rec |
Construction Permit Expires | 2006-08-30 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-04-21 | 3900 | 3977 | 126 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 2694 Bbl | 80000 | 1000 GALLONS FE ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | OHIO VALLEY ENERGY SYSTEM CORP | 0 | 0 | 0 |
2006 | OHIO VALLEY ENERGY SYSTEM CORP | 15979 | 90 | 332 |
2007 | OHIO VALLEY ENERGY SYSTEM CORP | 17279 | 82 | 364 |
2008 | OHIO VALLEY ENERGY SYSTEM CORP | 9700 | 76 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEM CORP | 6925 | 114 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEM CORP | 5558 | 0 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEM CORP | 4186 | 44 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEM CORP | 4465 | 48 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEM CORP | 3352 | 0 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEM CORP | 3067 | 47 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEM CORP | 2818 | 0 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEM CORP | 2595 | 62 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEM CORP | 2406 | 0 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEM CORP | 2102 | 61 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 0 | 0 |
2006 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 677 | 332 |
2007 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 222 | 364 |
2008 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 137 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 90 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 131 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 22 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 67 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 72 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 128 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 131 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 49 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 0 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0066211078 | 2018-03-15 | Production Wells | No Violations | With Stephen Ochs (District Supervisor), I did a status check inspection for this well. The well is equipped with a plunger-lift system. The tank battery consists of a steel production tank, a plastic brine tank, a horizontal separator and a meter. The well is legibly identified. The well and tank battery are fenced in, gated and locked. No compliance issues are cited at this time. |
0155901758 | 2005-09-02 | Drill / Deepen / Reopen | No Violations | Status check inspection. Ohio Valley has started building the location by cutting the concrete curb and starting to fill a low area north of the well stake. |
0162081056 | 2005-12-05 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and the tank battery should be set within the next week. Additional grading is necessary before approving preliminary restoration. |
0475043146 | 2005-09-15 | Drill / Deepen / Reopen | No Violations | The drill site has been enlarged with fill material and the silt fence has been installed. |
0510627949 | 2005-10-18 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling moving on site and Whipstock is digging the pits. Should spud later tonight with surface job sometime tomorrow evening. No violations at this time. |
0665102003 | 2016-09-01 | UrbanProduction Wells | No Violations | The well head and tank battery were accessed through the parking lot of the Acme Fresh Market located at 3151 Cormany Rd., Akron, Oh 44319. The well was operated as a 1.5 Plunger Lift well and secured with a locked chain link fence. The 8.625 casing annular manifold was present and read zero (0) psi. The well head was I. D. with legible signage. I did not idenify any leaks at the well head. The tank battery is located 120 feet to the east of the well head and was properly identified. The tank battery was surrounded with a locked chain link fence ( with privacy slats ) and an earthern dike. The well head and tank battery were properly landscaped. The tank battery was comprised of one (1) 140 barrel oil tank, one (1) poly 25 barrel brine tank and a horizontal separator. The 140 barrel tank was equipped with charcoal filter, lightening arrestor and pressure relief inspection hatch. The equipment was spaced properly. The load lines were locked and plugged. I did not identify any leaks in the tank battery. No violations. |
1068829001 | 2005-10-20 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead. The pits are lined and in good condition. No violations at this time. |
1131465339 | 2005-10-25 | Drill / Deepen / Reopen | No Violations | Drilling completed. Wildcat still on site for rig maintenance. Pits lined and in good condition. No violations at this time. |
1132104430 | 2005-11-02 | Drill / Deepen / Reopen | No Violations | The drilling rig has moved off. The pits are lined and in good condition but need to be pumped down. The fence around the pits has been blown down and needs to be restaked. I contacted Dale Nething who said that he would send a crew over today to repair the fence. |
1138118577 | 2006-01-12 | Production Wells | No Violations | The tank battery is less that 75 from the drilling unit. The tanks must either be moved or a waiver obtained from the affected neighbors. Since the well is not yet in production, a NOV will not be written. |
1225378317 | 2005-12-28 | Production Wells | No Violations | The tank battery has been built and reclamation work along the north side of the location has begun. No violations at this time. |
1247909841 | 2009-09-22 | Production Wells | No Violations | Status check inspection found no violations at this time. |
1447823721 | 2006-07-17 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
For data sources see[9]