If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-121-24554 | | Well ID: 34-121-24554 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.631377437, -81.44825904 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | | + | | County: [[Noble_County,_Ohio|Noble]] |
|- | |- | ||
− | | | + | | Municipality: [[Jefferson_Township,_Noble_County,_Ohio|Jefferson Township]] |
|- | |- | ||
− | | | + | | Operator Name: [[TRIAD HUNTER LLC]] |
|- | |- | ||
− | | | + | | Well Pad ID: [[001181]] |
|- | |- | ||
− | | | + | | Farm/Lease Name: WOODCHOPPER |
|- | |- | ||
− | | | + | | License Status: Producing |
|- | |- | ||
− | | | + | | License Date: 2019-05-30 |
|- | |- | ||
− | | | + | | Spud Date: 2018-07-28 |
|- | |- | ||
− | | | + | | Spud Drilling Contractor: |
|- | |- | ||
− | | | + | | Final Drill Date: |
|- | |- | ||
− | | | + | | Well Total Depth: |
|- | |- | ||
− | | | + | | Configuration: Horizontal |
|- | |- | ||
+ | | Latitude: 39.631377437 | ||
+ | |- | ||
+ | | Longitude: -81.44825904 | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables |
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | APP | ||
+ | | 2014-12-05 | ||
+ | | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/5/2014, Expired Date:12/4/2016 12:00:00 PM, Drilling unit acres:417.5, Proposed Well Type:OG, Proposed Well Class:POOL | ||
+ | |- | ||
+ | | APP | ||
+ | | 2018-07-25 | ||
+ | | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/25/2018, Expired Date:7/24/2020 12:00:00 PM, Drilling unit acres:680.38, Proposed Well Type:OG, Proposed Well Class:POOL | ||
+ | |- | ||
+ | | Correction to Well | ||
+ | | 2019-04-19 | ||
+ | | TAKE/TARGET AS-DRILLED PLAT | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2019-06-11 | ||
+ | | proposed drilling survey submitted prior to spud-ALE 9/16/15 | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2020-07-24 | ||
+ | | proposed drilling survey submitted prior to spud-ALE 9/16/15 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[TRIAD HUNTER LLC]] | ||
+ | | style="text-align: right;" | 236090 | ||
+ | | style="text-align: right;" | 14446 | ||
+ | | style="text-align: right;" | 90 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Production Table - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[TRIAD HUNTER LLC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 23126 | ||
+ | | style="text-align: right;" | 90 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Production Table - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Inspection Date | ||
+ | !scope="col" style="text-align: center"| Inspection Type | ||
+ | !scope="col" style="text-align: center"| Inspection Result | ||
+ | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | 0500704422 | ||
+ | | 2018-08-29 | ||
+ | | Casing String Witnessed | ||
+ | | No Violations | ||
+ | | During my inspection Schlumberger Cementing was on location cementing the 9.625-inch diameter intermediate casing. The casing set depth was at 6421 feet. The job was pumped in 2 stages with the stage tool was at 3988 feet in depth. I witnessed the first stage and Schlumberger pumped a 40 barrel spacer, 112 barrels of cement weighing 12.1 pound per gallon, and 84 barrels of 15.2 pound per gallon cement. | ||
+ | |- | ||
+ | | 1054407353 | ||
+ | | 2018-07-27 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | The purpose of my inspection was a status check on conductors. During my inspection the rotary rig was drilling the 26-inch diameter borehole. Components of H&P Drilling Rig 611 were slowly being brought on to the pad. The two remaining conductors of the pad had not yet been spudded. | ||
+ | |- | ||
+ | | 1532963572 | ||
+ | | 2018-07-29 | ||
+ | | Casing String Witnessed | ||
+ | | No Violations | ||
+ | | The purpose of my inspection was to witness cement operations on the conductor casing. Lightning Trucking was on location with 1 auger rig, 2 bulk cement trucks, and one pump truck. The borehole was 26 inches in diameter and was drilled to 140 feet in depth. Water was encountered during the drilling process. A 20-inch diameter conductor was set on bottom of the borehole at 140 feet. Lightning Trucking plumbed up to a 2-inch diameter threaded nipple that was welded on the top plate of the conductor and pumped 323 sacks of class A cement weighing 15.6 pounds per gallon and 48 barrels of fresh water for displacement. Returns were witnessed in the cellar. | ||
+ | |- | ||
+ | | 1858728192 | ||
+ | | 2018-09-05 | ||
+ | | Casing String Witnessed | ||
+ | | No Violations | ||
+ | | During my inspection HP 611 on location and they have reached a total measured depth of 18,958 feet within the 8.5--inch diameter production casing. | ||
+ | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | ==References== | ||
+ | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-121-24554 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.631377437,"lon":-81.44825904,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Jefferson Township | |
Operator Name: TRIAD HUNTER LLC | |
Well Pad ID: 001181 | |
Farm/Lease Name: WOODCHOPPER | |
License Status: Producing | |
License Date: 2019-05-30 | |
Spud Date: 2018-07-28 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Horizontal | |
Latitude: 39.631377437 | |
Longitude: -81.44825904 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-12-05 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/5/2014, Expired Date:12/4/2016 12:00:00 PM, Drilling unit acres:417.5, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2018-07-25 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/25/2018, Expired Date:7/24/2020 12:00:00 PM, Drilling unit acres:680.38, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2019-04-19 | TAKE/TARGET AS-DRILLED PLAT |
Record Last Modified | 2019-06-11 | proposed drilling survey submitted prior to spud-ALE 9/16/15 |
Construction Permit Expires | 2020-07-24 | proposed drilling survey submitted prior to spud-ALE 9/16/15 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | TRIAD HUNTER LLC | 236090 | 14446 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | TRIAD HUNTER LLC | Brine | 23126 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0500704422 | 2018-08-29 | Casing String Witnessed | No Violations | During my inspection Schlumberger Cementing was on location cementing the 9.625-inch diameter intermediate casing. The casing set depth was at 6421 feet. The job was pumped in 2 stages with the stage tool was at 3988 feet in depth. I witnessed the first stage and Schlumberger pumped a 40 barrel spacer, 112 barrels of cement weighing 12.1 pound per gallon, and 84 barrels of 15.2 pound per gallon cement. |
1054407353 | 2018-07-27 | Drill / Deepen / Reopen | No Violations | The purpose of my inspection was a status check on conductors. During my inspection the rotary rig was drilling the 26-inch diameter borehole. Components of H&P Drilling Rig 611 were slowly being brought on to the pad. The two remaining conductors of the pad had not yet been spudded. |
1532963572 | 2018-07-29 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness cement operations on the conductor casing. Lightning Trucking was on location with 1 auger rig, 2 bulk cement trucks, and one pump truck. The borehole was 26 inches in diameter and was drilled to 140 feet in depth. Water was encountered during the drilling process. A 20-inch diameter conductor was set on bottom of the borehole at 140 feet. Lightning Trucking plumbed up to a 2-inch diameter threaded nipple that was welded on the top plate of the conductor and pumped 323 sacks of class A cement weighing 15.6 pounds per gallon and 48 barrels of fresh water for displacement. Returns were witnessed in the cellar. |
1858728192 | 2018-09-05 | Casing String Witnessed | No Violations | During my inspection HP 611 on location and they have reached a total measured depth of 18,958 feet within the 8.5--inch diameter production casing. |
For data sources see[7]