X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24707"

m
 
m
Line 11: Line 11:
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
|-
 
|-
| Municipality: [[Malaga,_Monroe_County,_Ohio|Malaga]]
+
| Municipality: [[Malaga_Township,_Monroe_County,_Ohio|Malaga Township]]
 
|-
 
|-
 
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
|-
 
|-
| Well Pad ID: [[1414]]
+
| Well Pad ID: [[001414]]
 
|-
 
|-
 
| Farm/Lease Name: MANN UNIT
 
| Farm/Lease Name: MANN UNIT
Line 37: Line 37:
 
| Longitude: -81.17122143
 
| Longitude: -81.17122143
 
|}
 
|}
For data sources see<ref name=RBDMS>{{cite web
+
For data sources see<ref>{{cite web
  | title = RBDMS
+
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2016-12-23
 +
| Proposed Formations:POINT PLEASANT, Issued Date:12/23/2016, Expired Date:12/23/2018 12:00:00 PM, Drilling unit acres:998.971, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Reached Total Depth
 +
| 2017-04-26
 +
| 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
 +
|-
 +
| Correction to Well
 +
| 2017-09-01
 +
| UPDATE TAKE/TARGET AS-DRILLED RCVD 07/18/17 ALE.
 +
|-
 +
| Completion Report Received
 +
| 2018-01-02
 +
| 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
 +
|-
 +
| Record Last Modified
 +
| 2018-01-12
 +
| 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
 +
|-
 +
| Construction Permit Expires
 +
| 2018-12-23
 +
| 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  | date =  2019-05-07  
 
  | date =  2019-05-07  
Line 44: Line 81:
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
{| class="wikitable sortable" style="width: 50%"
+
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Interval Top (ft)
 
!scope="col" style="text-align: center"| Interval Top (ft)
Line 61: Line 98:
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name = RBDMS/>
+
For data sources see<ref>{{cite web
== Production Data ==
+
  | title = Risk Based Data Management System - Perfs Table
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Period
 
!scope="col" style="text-align: center"| Operator Name
 
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 
!scope="col" style="text-align: center"| Production Days
 
|-
 
| 2017
 
| [[ANTERO RESOURCES  CORPORATION]]
 
| style="text-align: right;" | 206536
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 61
 
|-
 
| 2018
 
| [[ANTERO RESOURCES  CORPORATION]]
 
| style="text-align: right;" | 5159277
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 364
 
|-
 
| 2019
 
| [[ANTERO RESOURCES  CORPORATION]]
 
| style="text-align: right;" | 412853
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 90
 
|-
 
|}
 
For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web
 
  | title = Ohio Combined Annual Production Data
 
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2019-05-07  
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Waste Data ==
 
{| class="wikitable sortable"
 
!scope="col" style="text-align: center"| Period
 
!scope="col" style="text-align: center"| Operator Name
 
!scope="col" style="text-align: center"| Waste Type
 
!scope="col" style="text-align: center"| Quantity (bbl)
 
!scope="col" style="text-align: center"| Production Days
 
|-
 
| 2017
 
| [[ANTERO RESOURCES  CORPORATION]]
 
| Brine
 
| style="text-align: right;" | 6735
 
| style="text-align: right;" | 61
 
|-
 
| 2018
 
| [[ANTERO RESOURCES  CORPORATION]]
 
| Brine
 
| style="text-align: right;" | 86788
 
| style="text-align: right;" | 364
 
|-
 
| 2019
 
| [[ANTERO RESOURCES  CORPORATION]]
 
| Brine
 
| style="text-align: right;" | 6385
 
| style="text-align: right;" | 90
 
|-
 
|}
 
For data sources see<ref name=RBDMS/><ref name=Annual_Prod/>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Inspection ID
 
!scope="col" style="text-align: center"| Inspection Date
 
!scope="col" style="text-align: center"| Inspection Type
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
|-
 
| 0766432311
 
| 2018-05-14
 
| Production Wells
 
| No Violations
 
|  Status check inspection found the well in production and selling off the production tree with 3 primary production valves open along with the (ESD) emergency shut down valve. The company has installed on the 9.625 and 13.375 well head sections annular pressure gauges and flow lines that are tied into the low pressure recover system, the company is monitoring all annuli. There is a total of 4 wells on the pad all with the same similar construction with all 4 wells producing through sand trap separators during the initial production stages. There is also 4 gas processing units on location. Also present is a production fluid storage facility consisting of a total of 8 steel construction tanks of 400 barrel capacity located inside a polymer lined steel containment area.
 
|-
 
| 0786621859
 
| 2017-02-15
 
| Drill / Deepen /  Reopen
 
| No Violations
 
 
|-
 
| 0821486938
 
| 2017-11-01
 
| Preliminary Restoration
 
| No Violations
 
|  Preliminary Restoration status check inspection found the area affected by the well pad construction to have vegetation and erosion control present. At the time of my inspection contract workers from Myers Well Service were on site removing the erosion control filter socks from the well pad perimeter. Also noted is the well pad perimeter has a total of 6 catch basins with fluid outlet discharge drains in the closed position. Addressing the 4 active wells on the location, all 4 wells have been drilled and completed and the initial flow back stages are complete. The wells are complete with production trees and the production outlet valves are in the open position. The tin horn cellars have been filled with river gravel and have siphon tubes in place for fluid recovery. The mouse holes have also been closed in. There is annular monitoring in place on the well heads. The wells are selling into gas processing units with a total of 4 units present on location one each supporting each well. The well production fluid is being discharged into a tank battery consisting of 8 steel tanks holding a capacity of 400 barrels of fluid each, downstream from the tanks are 2 low pressure vapor burner stacks. The well pad and lease road are of stone construction with signage posted at the well pad entrance and a gate present half way down the lease road.
 
|-
 
| 1130910469
 
| 2017-06-06
 
| Completion Testing
 
| No Violations
 
|  Status check inspection on the well completion process found CalFrac Pressure Pumping Service rigging up on the hole and preparing to begin the stimulation process within the next 48 hours. Nine Energy Wireline will be providing wireline services. The well head consists of a Cameron B section pressure rated at 15,000 pound per square inch (psi) working pressure with a Cactus Completion stack consisting of a lower manual and hydraulic upper master control valves topped off with a flow cross valve section all rated at 15,000 psi working pressure. All stimulation equipment is situated on polymer containment with the well pad perimeter earthen berm being the primary containment.
 
|-
 
| 1486939349
 
| 2017-02-12
 
| Casing String Witnessed
 
| No Violations
 
|  On site inspection to witness the surface casing cement job with Frontier Drilling rig 32 on location and Halliburton Cement Service. A 17.5 diameter surface borehole has been drilled to a depth of 1,286 and 1,271 of 13.375 diameter J-
 
|-
 
| 1492707351
 
| 2017-04-20
 
| Drill / Deepen /  Reopen
 
| No Violations
 
 
|-
 
| 1503580440
 
| 2017-08-24
 
| Completion Testing
 
| No Violations
 
|  Status check inspection on the well completion process found a service rig on the hole owned by Fortis Energy along with ROC Water flow back. The well head assembly consists of a Cameron Well head lower B section along with a Cactus master valve and a Bass completion stack. The rig is preparing to start in the hole with the 2.875 work over string to drill out the completion plugs and run the production tubing. The well bore bottom perforation is at 20.346 and top perforation is at 9,063. The company is drilling out the plugs under a well bore balance condition. The drilling rig and support equipment is placed on polymer containment with the well pad perimeter earthen berm serving as the primary containment with the perimeter drain valves closed. The company man on site has been instructed to monitor annular well bore pressures pre and post drill out.
 
|-
 
| 2137788035
 
| 2017-01-06
 
| Casing String Witnessed
 
| No Violations
 
| I was on location to witness Express Energy cement the 26 inch diameter conductor casing into a 32 inch diameter bore hole. Express drilled a 100 foot 32 inch diameter bore hole and set 100 feet of 26 inch diameter conductor casing into the hole. Express ran 8 barrels of fresh water gel ahead of the cement. Express then ran 330 sacks of cement, 2% CaCL, and .50 parts per sack of floseal with 69.35 barrels of fresh water at 15.6 pounds and a yield of 1.18. Express then circulated with 55.74 barrels of fresh water until we got cement to surface. Express circulated about 20 barrels of cement to surface and finished cementing the conductor into the bore hole.
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Inspection ID
 
!scope="col" style="text-align: center"| Violation ID
 
!scope="col" style="text-align: center"| Violation Date
 
!scope="col" style="text-align: center"| Violation Code
 
!scope="col" style="text-align: center"| Violation Comments
 
|-
 
|}-->
 
For data sources see<ref name=RBDMS/>
 
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 541: Line 454:
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name = RBDMS/>
+
For data sources see<ref>{{cite web
== Well History ==
+
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2017
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| style="text-align: right;" | 206536
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 61
 +
|-
 +
| 2018
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| style="text-align: right;" | 5159277
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 364
 +
|-
 +
| 2019
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| style="text-align: right;" | 412853
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 90
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2017
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| Brine
 +
| style="text-align: right;" | 6735
 +
| style="text-align: right;" | 61
 +
|-
 +
| 2018
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| Brine
 +
| style="text-align: right;" | 86788
 +
| style="text-align: right;" | 364
 +
|-
 +
| 2019
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| Brine
 +
| style="text-align: right;" | 6385
 +
| style="text-align: right;" | 90
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Well Status
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" style="width: 15%;text-align: center"| Well Status Date
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" style="text-align: center"| Comment
+
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| 0766432311
 +
| 2018-05-14
 +
| Production Wells
 +
| No Violations
 +
|  Status check inspection found the well in production and selling off the production tree with 3 primary production valves open along with the (ESD) emergency shut down valve. The company has installed on the 9.625 and 13.375 well head sections annular pressure gauges and flow lines that are tied into the low pressure recover system, the company is monitoring all annuli. There is a total of 4 wells on the pad all with the same similar construction with all 4 wells producing through sand trap separators during the initial production stages. There is also 4 gas processing units on location. Also present is a production fluid storage facility consisting of a total of 8 steel construction tanks of 400 barrel capacity located inside a polymer lined steel containment area.
 +
|-
 +
| 0786621859
 +
| 2017-02-15
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
 
 
|-
 
|-
| APP
+
| 0821486938
| 2016-12-23
+
| 2017-11-01
| Proposed Formations:POINT PLEASANT, Issued Date:12/23/2016, Expired Date:12/23/2018 12:00:00 PM, Drilling unit acres:998.971, Proposed Well Type:OG, Proposed Well Class:POOL
+
| Preliminary Restoration
 +
| No Violations
 +
|  Preliminary Restoration status check inspection found the area affected by the well pad construction to have vegetation and erosion control present. At the time of my inspection contract workers from Myers Well Service were on site removing the erosion control filter socks from the well pad perimeter. Also noted is the well pad perimeter has a total of 6 catch basins with fluid outlet discharge drains in the closed position. Addressing the 4 active wells on the location, all 4 wells have been drilled and completed and the initial flow back stages are complete. The wells are complete with production trees and the production outlet valves are in the open position. The tin horn cellars have been filled with river gravel and have siphon tubes in place for fluid recovery. The mouse holes have also been closed in. There is annular monitoring in place on the well heads. The wells are selling into gas processing units with a total of 4 units present on location one each supporting each well. The well production fluid is being discharged into a tank battery consisting of 8 steel tanks holding a capacity of 400 barrels of fluid each, downstream from the tanks are 2 low pressure vapor burner stacks. The well pad and lease road are of stone construction with signage posted at the well pad entrance and a gate present half way down the lease road.
 
|-
 
|-
| Reached Total Depth
+
| 1130910469
| 2017-04-26
+
| 2017-06-06
| 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
+
| Completion Testing
 +
| No Violations
 +
|  Status check inspection on the well completion process found CalFrac Pressure Pumping Service rigging up on the hole and preparing to begin the stimulation process within the next 48 hours. Nine Energy Wireline will be providing wireline services. The well head consists of a Cameron B section pressure rated at 15,000 pound per square inch (psi) working pressure with a Cactus Completion stack consisting of a lower manual and hydraulic upper master control valves topped off with a flow cross valve section all rated at 15,000 psi working pressure. All stimulation equipment is situated on polymer containment with the well pad perimeter earthen berm being the primary containment.
 
|-
 
|-
| Correction to Well
+
| 1486939349
| 2017-09-01
+
| 2017-02-12
| UPDATE TAKE/TARGET AS-DRILLED RCVD 07/18/17 ALE.
+
| Casing String Witnessed
 +
| No Violations
 +
|   On site inspection to witness the surface casing cement job with Frontier Drilling rig 32 on location and Halliburton Cement Service. A 17.5 diameter surface borehole has been drilled to a depth of 1,286 and 1,271 of 13.375 diameter J-
 
|-
 
|-
| Completion Report Received
+
| 1492707351
| 2018-01-02
+
| 2017-04-20
| 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
+
| Drill / Deepen / Reopen
 +
| No Violations
 +
 
 
|-
 
|-
| Record Last Modified
+
| 1503580440
| 2018-01-12
+
| 2017-08-24
| 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
+
| Completion Testing
 +
| No Violations
 +
|  Status check inspection on the well completion process found a service rig on the hole owned by Fortis Energy along with ROC Water flow back. The well head assembly consists of a Cameron Well head lower B section along with a Cactus master valve and a Bass completion stack. The rig is preparing to start in the hole with the 2.875 work over string to drill out the completion plugs and run the production tubing. The well bore bottom perforation is at 20.346 and top perforation is at 9,063. The company is drilling out the plugs under a well bore balance condition. The drilling rig and support equipment is placed on polymer containment with the well pad perimeter earthen berm serving as the primary containment with the perimeter drain valves closed. The company man on site has been instructed to monitor annular well bore pressures pre and post drill out.
 
|-
 
|-
| Construction Permit Expires
+
| 2137788035
| 2018-12-23
+
| 2017-01-06
| 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
+
| Casing String Witnessed
 +
| No Violations
 +
| I was on location to witness Express Energy cement the 26 inch diameter conductor casing into a 32 inch diameter bore hole. Express drilled a 100 foot 32 inch diameter bore hole and set 100 feet of 26 inch diameter conductor casing into the hole. Express ran 8 barrels of fresh water gel ahead of the cement. Express then ran 330 sacks of cement, 2% CaCL, and .50 parts per sack of floseal with 69.35 barrels of fresh water at 15.6 pounds and a yield of 1.18. Express then circulated with 55.74 barrels of fresh water until we got cement to surface. Express circulated about 20 barrels of cement to surface and finished cementing the conductor into the bore hole.
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name=RBDMS/>
+
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 23:41, 23 July 2019

Well Details

Well ID: 34-111-24707
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Malaga Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: 001414
Farm/Lease Name: MANN UNIT
License Status: Producing
License Date: 2018-01-11
Spud Date: 2017-01-05
Spud Drilling Contractor: FRONTIER DRILLING
Final Drill Date: 2017-04-26
Well Total Depth: 20480 ft
Configuration: Horizontal
Latitude: 39.866153655
Longitude: -81.17122143

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-23 Proposed Formations:POINT PLEASANT, Issued Date:12/23/2016, Expired Date:12/23/2018 12:00:00 PM, Drilling unit acres:998.971, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-04-26 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
Correction to Well 2017-09-01 UPDATE TAKE/TARGET AS-DRILLED RCVD 07/18/17 ALE.
Completion Report Received 2018-01-02 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
Record Last Modified 2018-01-12 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.
Construction Permit Expires 2018-12-23 12 MONTHS CONFIDENTIALITY ON ALL LOGS-ALE 05/24/2017.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-01-11 9063 9231 4
2018-01-11 20211 20379 4

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/08/2017 07/03/2017 9216 21,816,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 DWP-641 CWS Friction Reducer Listed Below Green Line Listed Below 0 0 0
Calbreak 5501 CWS Breaker Listed Below Green Line Listed Below 0 0 0
Polymer 26100-47-0 45 0.0387 81805.3
Ammonium Persulfate 7727-54-0 0 0.00136 2881
Sorbitol tetraoleate 61723-83-9 2 0.00172 3635.79
Hydrochloric acid 7647-01-0 37 0.06079 128503
Biotite 1302-27-8 0.1 0.00413 8723.15
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 0 0.00213 4508.1
Goethite 1310-14-1 0.1 0.00621 13126.8
Quaternary ammonium compounds, bis(hydrogenated tallow alkyl)dimethyl, salts with bentonite 68953-58-2 5 0.00402 8506.87
Alcohols, C12-14, ethoxylated 84133-50-6 0.5 0.00043 908.95
Citric acid 77-92-9 60 0.00057 1209.42
2-Propenoic acid, homopolymer, sodium salt 9003-04-7 40 0.00585 12365.9
Sodium bromide 7647-15-6 4 0.00043 901.62
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.00121 2552.06
Ammonium chloride 12125-02-9 11 0.00946 19996.8
Acrylamide 79-06-1 0.1 0.00009000 181.79
Polyethylene glycol mixture 25322-68-3 54.5 0.00581 12284.6
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.0483 102082
Sorbitan monooleate 1338-43-8 4 0.00344 7271.58
Amines, tallow alkyl, ethoxylated 61791-26-2 1 0.00086 1817.9
Calcite 471-34-1 1 0.02188 46238.4
Apatite 64476-38-6 0.1 0.00413 8723.15
1,2-Propanediol 57-55-6 10 0.00146 3091.47
Crystalline silica (Quartz) 14808-60-7 100 13.4502 28,430,100.0
Ilmenite 98072-94-7 0.1 0.00309 6521.32
Illite 12173-60-3 1 0.00833 17607.6
Paraffinic hydrocarbon solvent 64742-47-8 30 0.0258 54536.9
Guar gum 9000-30-0 60 0.0483 102082
Dibromoacetonitrile 3252-43-5 3 0.00032 676.22
Polyethylene glycol monooleate 9004-96-0 3 0.00258 5453.69
Vinylidene chloride-methyl acrylate copolymer 25038-72-6 0 0.00027 576.2
Hydrochloric Acid CWS Clean Perforations Listed Below Green Line Listed Below 0 0 0
DAP-103 CWS Iron Control Listed Below Green Line Listed Below 0 0 0
Water Supplied by Operator Base Fluid Water 7732-18-5 100 86.2381 0
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
DWP-111 CWS Gel Slurry Listed Below Green Line Listed Below 0 0 0
DAP-902 CWS Scale Inhibitor Listed Below Green Line Listed Below 0 0 0
Sand (Proppant) CWS Propping Agent Listed Below Green Line Listed Below 0 0 0
SANIFRAC 8844 CWS Biocide Listed Below Green Line Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-07-03 H2O 15 10765 Bbl 502400 CalFrac STAGE 57/57

STAGES 2-56 SEE IMAGES

2017-06-08 H2O 15 8663 Bbl 507300 CalFrac STAGE 1/57

STAGES 2-56 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION 206536 0 61
2018 ANTERO RESOURCES CORPORATION 5159277 0 364
2019 ANTERO RESOURCES CORPORATION 412853 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION Brine 6735 61
2018 ANTERO RESOURCES CORPORATION Brine 86788 364
2019 ANTERO RESOURCES CORPORATION Brine 6385 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0766432311 2018-05-14 Production Wells No Violations Status check inspection found the well in production and selling off the production tree with 3 primary production valves open along with the (ESD) emergency shut down valve. The company has installed on the 9.625 and 13.375 well head sections annular pressure gauges and flow lines that are tied into the low pressure recover system, the company is monitoring all annuli. There is a total of 4 wells on the pad all with the same similar construction with all 4 wells producing through sand trap separators during the initial production stages. There is also 4 gas processing units on location. Also present is a production fluid storage facility consisting of a total of 8 steel construction tanks of 400 barrel capacity located inside a polymer lined steel containment area.
0786621859 2017-02-15 Drill / Deepen / Reopen No Violations
0821486938 2017-11-01 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the well pad construction to have vegetation and erosion control present. At the time of my inspection contract workers from Myers Well Service were on site removing the erosion control filter socks from the well pad perimeter. Also noted is the well pad perimeter has a total of 6 catch basins with fluid outlet discharge drains in the closed position. Addressing the 4 active wells on the location, all 4 wells have been drilled and completed and the initial flow back stages are complete. The wells are complete with production trees and the production outlet valves are in the open position. The tin horn cellars have been filled with river gravel and have siphon tubes in place for fluid recovery. The mouse holes have also been closed in. There is annular monitoring in place on the well heads. The wells are selling into gas processing units with a total of 4 units present on location one each supporting each well. The well production fluid is being discharged into a tank battery consisting of 8 steel tanks holding a capacity of 400 barrels of fluid each, downstream from the tanks are 2 low pressure vapor burner stacks. The well pad and lease road are of stone construction with signage posted at the well pad entrance and a gate present half way down the lease road.
1130910469 2017-06-06 Completion Testing No Violations Status check inspection on the well completion process found CalFrac Pressure Pumping Service rigging up on the hole and preparing to begin the stimulation process within the next 48 hours. Nine Energy Wireline will be providing wireline services. The well head consists of a Cameron B section pressure rated at 15,000 pound per square inch (psi) working pressure with a Cactus Completion stack consisting of a lower manual and hydraulic upper master control valves topped off with a flow cross valve section all rated at 15,000 psi working pressure. All stimulation equipment is situated on polymer containment with the well pad perimeter earthen berm being the primary containment.
1486939349 2017-02-12 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job with Frontier Drilling rig 32 on location and Halliburton Cement Service. A 17.5 diameter surface borehole has been drilled to a depth of 1,286 and 1,271 of 13.375 diameter J-
1492707351 2017-04-20 Drill / Deepen / Reopen No Violations
1503580440 2017-08-24 Completion Testing No Violations Status check inspection on the well completion process found a service rig on the hole owned by Fortis Energy along with ROC Water flow back. The well head assembly consists of a Cameron Well head lower B section along with a Cactus master valve and a Bass completion stack. The rig is preparing to start in the hole with the 2.875 work over string to drill out the completion plugs and run the production tubing. The well bore bottom perforation is at 20.346 and top perforation is at 9,063. The company is drilling out the plugs under a well bore balance condition. The drilling rig and support equipment is placed on polymer containment with the well pad perimeter earthen berm serving as the primary containment with the perimeter drain valves closed. The company man on site has been instructed to monitor annular well bore pressures pre and post drill out.
2137788035 2017-01-06 Casing String Witnessed No Violations I was on location to witness Express Energy cement the 26 inch diameter conductor casing into a 32 inch diameter bore hole. Express drilled a 100 foot 32 inch diameter bore hole and set 100 feet of 26 inch diameter conductor casing into the hole. Express ran 8 barrels of fresh water gel ahead of the cement. Express then ran 330 sacks of cement, 2% CaCL, and .50 parts per sack of floseal with 69.35 barrels of fresh water at 15.6 pounds and a yield of 1.18. Express then circulated with 55.74 barrels of fresh water until we got cement to surface. Express circulated about 20 barrels of cement to surface and finished cementing the conductor into the bore hole.

For data sources see[10]

References