X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24347"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-24347
 
| Well ID: 34-111-24347
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.7116169387, -80.8384494991 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.71130333, -80.83962233 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Monroe County, Ohio|Monroe]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[TRIAD HUNTER  LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2012-10-04
 
| Spud Date: 2012-10-04
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.7116169387
+
| Latitude: 39.71130333
 
|-
 
|-
| Longitude: -80.8384494991
+
| Longitude: -80.83962233
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1446.0
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 138250.0
 +
| style="text-align:right;" | 87.0
 +
|
 +
|
 +
| style="text-align:right;" | 11264.0
 +
| style="text-align:right;" | 87.0
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 155857.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 7785.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 160375.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 6772.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 120326.0
 +
| style="text-align:right;" | 84.0
 +
|
 +
|
 +
| style="text-align:right;" | 2556.0
 +
| style="text-align:right;" | 84.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 112:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1146396302
 +
| 2014-09-09
 +
|
 +
| On the day of my inspection accompanied by ODNR staff and Production Supervisor Rodney Boron, I witnessed that the well was equipped with Cameron casing and tubing wellheads along with a Christmas tree valve assembly and a sand trap controlled manually to a 300bbl frac tank in containment. Production equipment included a GPS Unit, a compressor unit, dehydrator unit, and a fuel skid. Tank battery consisted of 8-500bbl tanks and 2 let down towers all within containment. Also on site were 4 combustors and a pig launcher. The site passed preliminary restoration according to ORC 1509.072A.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1232946617
 
| -1232946617
 
| 2012-12-10
 
| 2012-12-10
|
+
|  
 
| Well was completed on 12/08/12 with the company providing a copy of the cement ticket to the inspector with verbal compliance that the 5.5'' long string cement job went good with 15 Barrels of cement returns to surface.
 
| Well was completed on 12/08/12 with the company providing a copy of the cement ticket to the inspector with verbal compliance that the 5.5'' long string cement job went good with 15 Barrels of cement returns to surface.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -454485326
 
| 2012-11-14
 
|
 
| Status check on drilling progress found the current drilling depth to be 145' using a 17.5'' bit and the company looking to set the 13.375'' surface pipe sometime in the next 24 hours.
 
|
 
|
 
|
 
|-
 
|-
 
| -617481825
 
| 2012-12-06
 
|
 
| Notification was made to inspector that the stuck drill string had been recovered and the bore hole properly conditioned with the company preparing to run the 5.5'' production casing into the bore hole. Company representative indicated that they intended to cement the casing in a single stage process and not 2 stage the job, Company did add a Gas Blocker to the lead cement to avoid any potential problems per conversation with inspector.
 
|
 
|
 
|
 
|-
 
|-
 
| -625773594
 
| 2012-11-19
 
|
 
| Inspector on drill site for a status update of the drilling process. 2734' of 9.625'' casing was ran on 11/18/12 with cement returns to surface. Drilling company in the process of hooking up the Blow Out Preventer with the drilling prognosis to drill on Air to the top of the curve and then switch of Oil Based Mud for the rest of the drilling procedure.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1246821545
 
| 1246821545
 
| 2012-11-30
 
| 2012-11-30
|
+
|  
 
| Status check on drilling progress found the current drilling depth to be 8,121' and the company currently pulled out of the hole with the drill string for a bit change, estimated total completion depth to be 10,100'.
 
| Status check on drilling progress found the current drilling depth to be 8,121' and the company currently pulled out of the hole with the drill string for a bit change, estimated total completion depth to be 10,100'.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1349402473
 
| 1349402473
 
| 2012-10-04
 
| 2012-10-04
|
+
|  
 
| Well was spudded on this day, 10-04-2012, with 70' of 20'' comductor being set and cemented to surface.
 
| Well was spudded on this day, 10-04-2012, with 70' of 20'' comductor being set and cemented to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1352890676
 
| 1352890676
 
| 2012-11-12
 
| 2012-11-12
|
+
|  
 
| Notification was received on this day by phone that Warren Drilling Rig # 12 was rigged up and should be drilling by mid week.
 
| Notification was received on this day by phone that Warren Drilling Rig # 12 was rigged up and should be drilling by mid week.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1353947757
 
| 1353947757
 
| 2012-11-26
 
| 2012-11-26
|
+
|  
 
| Inspection found the current drilling depth to be 5324' using a 8.750'' Varrell bit and starting to build their curve. The switch was made to oil base drilling mud @ 4882' with a total proposed depth to be reached of approximately 10,220'.
 
| Inspection found the current drilling depth to be 5324' using a 8.750'' Varrell bit and starting to build their curve. The switch was made to oil base drilling mud @ 4882' with a total proposed depth to be reached of approximately 10,220'.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1354636202
 
| 1354636202
 
| 2012-12-04
 
| 2012-12-04
|
+
|  
 
| Inspection and status check of drill site found that the well bore has been completed with a total depth reached of 10,063'. With the drill string currently stuck in the hole @ 4947' in the vertical section, company is currently in the process of retrieving the stuck drill string.
 
| Inspection and status check of drill site found that the well bore has been completed with a total depth reached of 10,063'. With the drill string currently stuck in the hole @ 4947' in the vertical section, company is currently in the process of retrieving the stuck drill string.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1377041945
 
| 1377041945
 
| 2013-08-20
 
| 2013-08-20
|
+
|  
 
| Status check on the stimulation process to observe the 2nd stage to be stimulated with a solid composite 12,000 psi bridge plug set at 9,679' and 72 perforations staggered out in 5 different bursts of 6 shots in 12'' using 3' hollow steel carriers between 9,479' and 9,650', with 2000 gl of 7.5% HCL used and a break pressure of 5892 and average treatment pressure of 6324 psi and rate of 80.6 barrel's per minuite and shut in pressure of 4,480 psi. The annular pressure is being monitored electronically.
 
| Status check on the stimulation process to observe the 2nd stage to be stimulated with a solid composite 12,000 psi bridge plug set at 9,679' and 72 perforations staggered out in 5 different bursts of 6 shots in 12'' using 3' hollow steel carriers between 9,479' and 9,650', with 2000 gl of 7.5% HCL used and a break pressure of 5892 and average treatment pressure of 6324 psi and rate of 80.6 barrel's per minuite and shut in pressure of 4,480 psi. The annular pressure is being monitored electronically.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1410364324
 +
| 2014-09-09
 +
|
 +
| The southeast meeting was held at the site. The well is a producing well with a large Texas well head. We looked at the process from the well head to the midstream line. Facility is in compliance with 1509 and 1501:9-9-05.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1466500552
 
| 1466500552
 
| 2012-11-15
 
| 2012-11-15
|
+
|  
| On the day of my inspection Warren Rig 12 had drilled to 525' with a 17.5" bit  and ran 13.375  pipe to 509'. Express ran the casing and BJ was cementing. See casing ticket. No violations noted.
+
| On the day of my inspection Warren Rig 12 had drilled to 525' with a 17.5 bit  and ran 13.375  pipe to 509'. Express ran the casing and BJ was cementing. See casing ticket. No violations noted.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1652875164
 
| 1652875164
 
| 2013-12-12
 
| 2013-12-12
|
+
|  
 
| Status check inspection found the well has had the completion plugs drilled out and tubing has been run and set in the well bore, Contractors are on site and hooked up to begin the testing of the well today. On a pass through visit on 12/09/13 I witness the 500 barrel portable storage tanks to be used in the completion had no grounding wirers, I addressed this verbally with the company man on site and the issue has been taken care of.
 
| Status check inspection found the well has had the completion plugs drilled out and tubing has been run and set in the well bore, Contractors are on site and hooked up to begin the testing of the well today. On a pass through visit on 12/09/13 I witness the 500 barrel portable storage tanks to be used in the completion had no grounding wirers, I addressed this verbally with the company man on site and the issue has been taken care of.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 2136554905
 
| 2136554905
 
| 2013-12-12
 
| 2013-12-12
|
+
|  
 
| Company is having a contractor named Fesco to hook up flow back equipment up and flare well.
 
| Company is having a contractor named Fesco to hook up flow back equipment up and flare well.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -454485326
 +
| 2012-11-14
 +
|
 +
| Status check on drilling progress found the current drilling depth to be 145' using a 17.5'' bit and the company looking to set the 13.375'' surface pipe sometime in the next 24 hours.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -617481825
 +
| 2012-12-06
 +
|
 +
| Notification was made to inspector that the stuck drill string had been recovered and the bore hole properly conditioned with the company preparing to run the 5.5'' production casing into the bore hole. Company representative indicated that they intended to cement the casing in a single stage process and not 2 stage the job, Company did add a Gas Blocker to the lead cement to avoid any potential problems per conversation with inspector.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -625773594
 +
| 2012-11-19
 +
|
 +
| Inspector on drill site for a status update of the drilling process. 2734' of 9.625'' casing was ran on 11/18/12 with cement returns to surface. Drilling company in the process of hooking up the Blow Out Preventer with the drilling prognosis to drill on Air to the top of the curve and then switch of Oil Based Mud for the rest of the drilling procedure.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 13:56, 15 July 2015

Well Details

Well ID: 34-111-24347
Loading map...
County: Monroe
Municipality:
Operator Name: TRIAD HUNTER LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-10-04
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.71130333
Longitude: -80.83962233

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 0.0 1446.0
2014-1 0.0 0.0 0.0 0.0
2014-2 138250.0 87.0 11264.0 87.0
2014-3 155857.0 92.0 7785.0 92.0
2014-4 160375.0 92.0 6772.0 92.0
2015-1 120326.0 84.0 2556.0 84.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1146396302 2014-09-09 On the day of my inspection accompanied by ODNR staff and Production Supervisor Rodney Boron, I witnessed that the well was equipped with Cameron casing and tubing wellheads along with a Christmas tree valve assembly and a sand trap controlled manually to a 300bbl frac tank in containment. Production equipment included a GPS Unit, a compressor unit, dehydrator unit, and a fuel skid. Tank battery consisted of 8-500bbl tanks and 2 let down towers all within containment. Also on site were 4 combustors and a pig launcher. The site passed preliminary restoration according to ORC 1509.072A.
-1232946617 2012-12-10 Well was completed on 12/08/12 with the company providing a copy of the cement ticket to the inspector with verbal compliance that the 5.5 long string cement job went good with 15 Barrels of cement returns to surface.
1246821545 2012-11-30 Status check on drilling progress found the current drilling depth to be 8,121' and the company currently pulled out of the hole with the drill string for a bit change, estimated total completion depth to be 10,100'.
1349402473 2012-10-04 Well was spudded on this day, 10-04-2012, with 70' of 20 comductor being set and cemented to surface.
1352890676 2012-11-12 Notification was received on this day by phone that Warren Drilling Rig # 12 was rigged up and should be drilling by mid week.
1353947757 2012-11-26 Inspection found the current drilling depth to be 5324' using a 8.750 Varrell bit and starting to build their curve. The switch was made to oil base drilling mud @ 4882' with a total proposed depth to be reached of approximately 10,220'.
1354636202 2012-12-04 Inspection and status check of drill site found that the well bore has been completed with a total depth reached of 10,063'. With the drill string currently stuck in the hole @ 4947' in the vertical section, company is currently in the process of retrieving the stuck drill string.
1377041945 2013-08-20 Status check on the stimulation process to observe the 2nd stage to be stimulated with a solid composite 12,000 psi bridge plug set at 9,679' and 72 perforations staggered out in 5 different bursts of 6 shots in 12 using 3' hollow steel carriers between 9,479' and 9,650', with 2000 gl of 7.5% HCL used and a break pressure of 5892 and average treatment pressure of 6324 psi and rate of 80.6 barrel's per minuite and shut in pressure of 4,480 psi. The annular pressure is being monitored electronically.
1410364324 2014-09-09 The southeast meeting was held at the site. The well is a producing well with a large Texas well head. We looked at the process from the well head to the midstream line. Facility is in compliance with 1509 and 1501:9-9-05.
1466500552 2012-11-15 On the day of my inspection Warren Rig 12 had drilled to 525' with a 17.5 bit and ran 13.375 pipe to 509'. Express ran the casing and BJ was cementing. See casing ticket. No violations noted.
1652875164 2013-12-12 Status check inspection found the well has had the completion plugs drilled out and tubing has been run and set in the well bore, Contractors are on site and hooked up to begin the testing of the well today. On a pass through visit on 12/09/13 I witness the 500 barrel portable storage tanks to be used in the completion had no grounding wirers, I addressed this verbally with the company man on site and the issue has been taken care of.
2136554905 2013-12-12 Company is having a contractor named Fesco to hook up flow back equipment up and flare well.
-454485326 2012-11-14 Status check on drilling progress found the current drilling depth to be 145' using a 17.5 bit and the company looking to set the 13.375 surface pipe sometime in the next 24 hours.
-617481825 2012-12-06 Notification was made to inspector that the stuck drill string had been recovered and the bore hole properly conditioned with the company preparing to run the 5.5 production casing into the bore hole. Company representative indicated that they intended to cement the casing in a single stage process and not 2 stage the job, Company did add a Gas Blocker to the lead cement to avoid any potential problems per conversation with inspector.
-625773594 2012-11-19 Inspector on drill site for a status update of the drilling process. 2734' of 9.625 casing was ran on 11/18/12 with cement returns to surface. Drilling company in the process of hooking up the Blow Out Preventer with the drilling prognosis to drill on Air to the top of the curve and then switch of Oil Based Mud for the rest of the drilling procedure.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.