X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23141"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23141
 
| Well ID: 34-153-23141
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.050017261, -81.6718442598 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.05001726, -81.67184426 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Summit County, Ohio|Summit]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[INDUSTRY STANDARD SUPPLIES INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2011-08-20
 
| Spud Date: 2011-08-20
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.050017261
+
| Latitude: 41.05001726
 
|-
 
|-
| Longitude: -81.6718442598
+
| Longitude: -81.67184426
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 10012.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1240.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 10090.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 978.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 7270.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 711.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 94:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1314879190
 +
| 2011-08-26
 +
|
 +
| Poulson Drilling is moving off location. The drilling pits are fenced, lined and in good condition. The pits will be solidified and closed within 14 days.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -149447472
 
| -149447472
 
| 2011-11-04
 
| 2011-11-04
|
+
|  
 
| The well has been fraced and is equipped with tubing, rods and a pump jack. The tank battery equipment is on site but has not been connected. No violations at this time.
 
| The well has been fraced and is equipped with tubing, rods and a pump jack. The tank battery equipment is on site but has not been connected. No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 163742938
 +
| 2011-08-22
 +
|
 +
| Poulson Drilling is drilling at 2050' on air/soap. They will covert to fluid at the top of the Big Lime later today. The pits are fenced, lined and in good condition.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1982534959
 
| -1982534959
 
| 2011-09-08
 
| 2011-09-08
|
+
|  
 
| The drilling pits were solidified on 9/6/11 and have now been covered over. Perforating is scheduled for 9/9/11 and the frac job for next week.
 
| The drilling pits were solidified on 9/6/11 and have now been covered over. Perforating is scheduled for 9/9/11 and the frac job for next week.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -284346797
 
| -284346797
 
| 2009-08-23
 
| 2009-08-23
|
+
|  
 
| Poulson Drilling is drilling at 2900' on salt water. They coverted to fluid at the top of the Big Lime. The pits are fenced, lined and in good condition.
 
| Poulson Drilling is drilling at 2900' on salt water. They coverted to fluid at the top of the Big Lime. The pits are fenced, lined and in good condition.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -843771531
 
| 2011-09-06
 
|
 
| Chem Tech was on site to solidify the drilling pits with one load (20+ tons) of dust for each pit.  Mr. Seabeck provided the trackhoe to mix the dust and cover over the pit. Pit closure occurred within the required 14 days. Preliminary Restoration is due by the first of December.
 
|
 
|
 
|
 
|-
 
|-
 
| 1314879190
 
| 2011-08-26
 
|
 
| Poulson Drilling is moving off location. The drilling pits are fenced, lined and in good condition. The pits will be solidified and closed within 14 days.
 
|
 
|
 
|
 
|-
 
|-
 
| 163742938
 
| 2011-08-22
 
|
 
| Poulson Drilling is drilling at 2050' on air/soap. They will covert to fluid at the top of the Big Lime later today. The pits are fenced, lined and in good condition.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 301232845
 
| 301232845
 
| 2011-08-29
 
| 2011-08-29
|
+
|  
 
| The drilling rig has moved off site. The drilling pits have been pumped down and are still fenced and lined. Pit solidification is still scheduled for next week.
 
| The drilling rig has moved off site. The drilling pits have been pumped down and are still fenced and lined. Pit solidification is still scheduled for next week.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 434183832
 
| 434183832
 
| 2011-08-24
 
| 2011-08-24
|
+
|  
 
| Poulson Drilling is drilling at 3570' on salt water.  They should TD the well tomorrow. The pits are fenced, lined and in good condition.
 
| Poulson Drilling is drilling at 3570' on salt water.  They should TD the well tomorrow. The pits are fenced, lined and in good condition.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 781903660
 
| 781903660
 
| 2011-08-25
 
| 2011-08-25
|
+
|  
 
| Poulson has finished drilling the well with a TD at 3910'. The longstring job will be up later today. The drilling pits are fenced, lined and in good condition. The Uniontown office received a water well complaint from Gregory Tygard (330-289-2605) at 3559 Wadsworth Road. Mr. Tygard lives two doors east of Mr. Seabeck. His complaint involves water quality after he noticed an increase in suspended sediment in his water supply. Mr. Tygard denied permission when ISSI was collecting pre-drilling water samples. The complaint information was forwarded to Kyle Tharp for an investigation.
 
| Poulson has finished drilling the well with a TD at 3910'. The longstring job will be up later today. The drilling pits are fenced, lined and in good condition. The Uniontown office received a water well complaint from Gregory Tygard (330-289-2605) at 3559 Wadsworth Road. Mr. Tygard lives two doors east of Mr. Seabeck. His complaint involves water quality after he noticed an increase in suspended sediment in his water supply. Mr. Tygard denied permission when ISSI was collecting pre-drilling water samples. The complaint information was forwarded to Kyle Tharp for an investigation.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -843771531
 +
| 2011-09-06
 +
|
 +
| Chem Tech was on site to solidify the drilling pits with one load (20+ tons) of dust for each pit.  Mr. Seabeck provided the trackhoe to mix the dust and cover over the pit. Pit closure occurred within the required 14 days. Preliminary Restoration is due by the first of December.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 14:51, 14 July 2015

Well Details

Well ID: 34-153-23141
Loading map...
County: Summit
Municipality:
Operator Name: INDUSTRY STANDARD SUPPLIES INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-08-20
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.05001726
Longitude: -81.67184426

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 0.0 0.0
2012-0 10012.0 1240.0
2013-0 10090.0 978.0
2014-0 7270.0 365.0 711.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1314879190 2011-08-26 Poulson Drilling is moving off location. The drilling pits are fenced, lined and in good condition. The pits will be solidified and closed within 14 days.
-149447472 2011-11-04 The well has been fraced and is equipped with tubing, rods and a pump jack. The tank battery equipment is on site but has not been connected. No violations at this time.
163742938 2011-08-22 Poulson Drilling is drilling at 2050' on air/soap. They will covert to fluid at the top of the Big Lime later today. The pits are fenced, lined and in good condition.
-1982534959 2011-09-08 The drilling pits were solidified on 9/6/11 and have now been covered over. Perforating is scheduled for 9/9/11 and the frac job for next week.
-284346797 2009-08-23 Poulson Drilling is drilling at 2900' on salt water. They coverted to fluid at the top of the Big Lime. The pits are fenced, lined and in good condition.
301232845 2011-08-29 The drilling rig has moved off site. The drilling pits have been pumped down and are still fenced and lined. Pit solidification is still scheduled for next week.
434183832 2011-08-24 Poulson Drilling is drilling at 3570' on salt water. They should TD the well tomorrow. The pits are fenced, lined and in good condition.
781903660 2011-08-25 Poulson has finished drilling the well with a TD at 3910'. The longstring job will be up later today. The drilling pits are fenced, lined and in good condition. The Uniontown office received a water well complaint from Gregory Tygard (330-289-2605) at 3559 Wadsworth Road. Mr. Tygard lives two doors east of Mr. Seabeck. His complaint involves water quality after he noticed an increase in suspended sediment in his water supply. Mr. Tygard denied permission when ISSI was collecting pre-drilling water samples. The complaint information was forwarded to Kyle Tharp for an investigation.
-843771531 2011-09-06 Chem Tech was on site to solidify the drilling pits with one load (20+ tons) of dust for each pit. Mr. Seabeck provided the trackhoe to mix the dust and cover over the pit. Pit closure occurred within the required 14 days. Preliminary Restoration is due by the first of December.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.