X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0264250106023"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0264250106023
 
| Well ID: 0264250106023
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.1887491, -113.3684102 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.190329, -113.370276 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: PCP PCR 102 GAYFORD 6-1-26-25
+
| Location: 02/06-01-026-25W4/3
 
|-
 
|-
| Operator:
+
| Location Alias: 02/06-01-26-25 W4M
 +
|-
 +
| Location Alias 2: 02/06-01-026-25 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 026
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 01
 +
|-
 +
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 +
|-
 +
| Well Name: EMBER 102 ENTICE 6-1-26-25
 +
|-
 +
| Operator Name: [[Ember Resources Inc.]]
 +
|-
 +
| License Number: 0260551
 
|-
 
|-
 
| License Date: 2001-10-15
 
| License Date: 2001-10-15
 
|-
 
|-
| Final Drilling Date: 2001-10-23
+
| License Status: Issued
 
|-
 
|-
| Total Depth: 995.0m
+
| Spud Date: 2001-10-21
 
|-
 
|-
| Fluid Type: Gas
+
| Final Drill Date: 2001-10-23
 
|-
 
|-
| Status: Suspended
+
| Well Total Depth: 995.00 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 51.190329
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -113.370276
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Violations:
+
| 2001-10-15
 +
| Obtained License
 
|-
 
|-
| Latitude: 51.1887491
+
| 2001-10-21
 +
| Surface Casing Operation Performed
 
|-
 
|-
| Longitude: -113.3684102
+
| 2001-10-23
 +
| Finished Drilling
 +
|-
 +
| 2001-10-23
 +
| Production Casing Operation Performed
 +
|-
 +
| 2001-10-23
 +
| Rig Released
 +
|-
 +
| 2001-10-23
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2001-11-11
 +
| Well Log Performed
 +
|-
 +
| 2001-11-14
 +
| Well Log Performed
 +
|-
 +
| 2001-12-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-01-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-01-25
 +
| Plug Back Performed
 +
|-
 +
| 2002-02-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-02-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-02-24
 +
| Plug Back Performed
 +
|-
 +
| 2002-02-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-06-13
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-08-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-09-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-10-07
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-11-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-06-12
 +
| Well Began Production
 +
|-
 +
| 2003-06-12
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2003-06-12
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2006-02-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-02-15
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2010-04-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2010-04-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2011-10-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-10-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2017-05-01
 +
| Well Structure changed to Commingled
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2001-12-05
 +
| Perforation
 +
| style="text-align: right;" | 886.00
 +
| style="text-align: right;" | 888.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2002-09-20
 +
| Perforation
 +
| style="text-align: right;" | 634.00
 +
| style="text-align: right;" | 637.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2002-09-20
 +
| Perforation
 +
| style="text-align: right;" | 645.00
 +
| style="text-align: right;" | 649.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2002-10-07
 +
| Fracture
 +
| style="text-align: right;" | 628.00
 +
| style="text-align: right;" | 649.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-11-13
 +
| Perforation
 +
| style="text-align: right;" | 394.00
 +
| style="text-align: right;" | 398.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 589.90
 +
| style="text-align: right;" | 590.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 584.30
 +
| style="text-align: right;" | 584.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 580.10
 +
| style="text-align: right;" | 580.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 547.60
 +
| style="text-align: right;" | 548.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 546.50
 +
| style="text-align: right;" | 547.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 540.00
 +
| style="text-align: right;" | 541.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-01-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 875.00
 +
| style="text-align: right;" | 883.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 534.20
 +
| style="text-align: right;" | 534.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 526.30
 +
| style="text-align: right;" | 526.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 519.80
 +
| style="text-align: right;" | 520.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 472.50
 +
| style="text-align: right;" | 473.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 470.00
 +
| style="text-align: right;" | 471.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 455.50
 +
| style="text-align: right;" | 456.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 449.20
 +
| style="text-align: right;" | 449.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 445.70
 +
| style="text-align: right;" | 446.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 444.80
 +
| style="text-align: right;" | 445.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 435.50
 +
| style="text-align: right;" | 436.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-02-02
 +
| Perforation
 +
| style="text-align: right;" | 853.00
 +
| style="text-align: right;" | 855.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 432.60
 +
| style="text-align: right;" | 433.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 431.70
 +
| style="text-align: right;" | 432.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 425.20
 +
| style="text-align: right;" | 425.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 422.50
 +
| style="text-align: right;" | 423.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 411.50
 +
| style="text-align: right;" | 412.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 408.10
 +
| style="text-align: right;" | 408.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 403.70
 +
| style="text-align: right;" | 404.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 402.30
 +
| style="text-align: right;" | 402.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 353.20
 +
| style="text-align: right;" | 353.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 352.20
 +
| style="text-align: right;" | 352.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-02-24
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 835.00
 +
| style="text-align: right;" | 843.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 344.80
 +
| style="text-align: right;" | 345.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 305.90
 +
| style="text-align: right;" | 306.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 296.20
 +
| style="text-align: right;" | 296.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 292.50
 +
| style="text-align: right;" | 293.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 280.40
 +
| style="text-align: right;" | 280.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-11
 +
| Perforation
 +
| style="text-align: right;" | 225.00
 +
| style="text-align: right;" | 225.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-15
 +
| Fracture
 +
| style="text-align: right;" | 225.00
 +
| style="text-align: right;" | 590.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-14
 +
| Perforation
 +
| style="text-align: right;" | 201.00
 +
| style="text-align: right;" | 203.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2011-10-14
 +
| Perforation
 +
| style="text-align: right;" | 217.00
 +
| style="text-align: right;" | 219.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2011-10-14
 +
| Perforation
 +
| style="text-align: right;" | 231.00
 +
| style="text-align: right;" | 233.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-02-27
 +
| Perforation
 +
| style="text-align: right;" | 727.00
 +
| style="text-align: right;" | 729.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2011-10-14
 +
| Perforation
 +
| style="text-align: right;" | 247.00
 +
| style="text-align: right;" | 250.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2011-10-14
 +
| Perforation
 +
| style="text-align: right;" | 348.00
 +
| style="text-align: right;" | 350.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2011-10-14
 +
| Perforation
 +
| style="text-align: right;" | 356.00
 +
| style="text-align: right;" | 358.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2011-10-14
 +
| Perforation
 +
| style="text-align: right;" | 366.00
 +
| style="text-align: right;" | 369.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2011-10-20
 +
| Fracture
 +
| style="text-align: right;" | 225.00
 +
| style="text-align: right;" | 671.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-06-13
 +
| Fracture
 +
| style="text-align: right;" | 727.00
 +
| style="text-align: right;" | 729.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-08-09
 +
| Perforation
 +
| style="text-align: right;" | 669.00
 +
| style="text-align: right;" | 671.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2002-08-09
 +
| Perforation
 +
| style="text-align: right;" | 658.00
 +
| style="text-align: right;" | 660.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2002-09-20
 +
| Perforation
 +
| style="text-align: right;" | 628.00
 +
| style="text-align: right;" | 631.00
 +
| style="text-align: right;" | 7
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2003
 +
| style="text-align: right;" | 3915
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2004
 +
| style="text-align: right;" | 4401
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2005
 +
| style="text-align: right;" | 7980
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 178
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 1415
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 11:41, 29 January 2021

Well Details

Well ID: 0264250106023
Loading map...
Location: 02/06-01-026-25W4/3
Location Alias: 02/06-01-26-25 W4M
Location Alias 2: 02/06-01-026-25 W4/03
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 25
Section: 01
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 6-1-26-25
Operator Name: Ember Resources Inc.
License Number: 0260551
License Date: 2001-10-15
License Status: Issued
Spud Date: 2001-10-21
Final Drill Date: 2001-10-23
Well Total Depth: 995.00 m
Surface Hole Latitude: 51.190329
Surface Hole Longitude: -113.370276

For data sources see[1][2]

Well History

Date Event
2001-10-15 Obtained License
2001-10-21 Surface Casing Operation Performed
2001-10-23 Finished Drilling
2001-10-23 Production Casing Operation Performed
2001-10-23 Rig Released
2001-10-23 Well Mode changed to Drilled and Cased
2001-11-11 Well Log Performed
2001-11-14 Well Log Performed
2001-12-05 Perforation Treatment Performed - Jet Perforation
2002-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-25 Plug Back Performed
2002-02-02 Perforation Treatment Performed - Jet Perforation
2002-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-24 Plug Back Performed
2002-02-27 Perforation Treatment Performed - Jet Perforation
2002-06-13 Perforation Treatment Performed - Fractured
2002-08-09 Perforation Treatment Performed - Jet Perforation
2002-09-20 Perforation Treatment Performed - Jet Perforation
2002-10-07 Perforation Treatment Performed - Fractured
2002-11-13 Perforation Treatment Performed - Jet Perforation
2003-06-12 Well Began Production
2003-06-12 Well Fluid changed to Gas
2003-06-12 Well Mode changed to Flowing
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-15 Perforation Treatment Performed - Fractured
2010-04-01 Well Fluid changed to Gas
2010-04-01 Well Mode changed to Suspended
2011-10-14 Perforation Treatment Performed - Jet Perforation
2011-10-20 Perforation Treatment Performed - Fractured
2017-05-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-12-05 Perforation 886.00 888.00 7
2002-09-20 Perforation 634.00 637.00 7
2002-09-20 Perforation 645.00 649.00 7
2002-10-07 Fracture 628.00 649.00 0
2002-11-13 Perforation 394.00 398.00 7
2006-02-11 Perforation 589.90 590.40 13
2006-02-11 Perforation 584.30 584.80 13
2006-02-11 Perforation 580.10 580.60 13
2006-02-11 Perforation 547.60 548.10 13
2006-02-11 Perforation 546.50 547.00 13
2006-02-11 Perforation 540.00 541.00 13
2002-01-25 Packing Device Capped w/Cement 875.00 883.00 0
2006-02-11 Perforation 534.20 534.70 13
2006-02-11 Perforation 526.30 526.80 13
2006-02-11 Perforation 519.80 520.30 13
2006-02-11 Perforation 472.50 473.50 13
2006-02-11 Perforation 470.00 471.00 13
2006-02-11 Perforation 455.50 456.00 13
2006-02-11 Perforation 449.20 449.70 13
2006-02-11 Perforation 445.70 446.20 13
2006-02-11 Perforation 444.80 445.30 13
2006-02-11 Perforation 435.50 436.00 13
2002-02-02 Perforation 853.00 855.00 7
2006-02-11 Perforation 432.60 433.10 13
2006-02-11 Perforation 431.70 432.20 13
2006-02-11 Perforation 425.20 425.70 13
2006-02-11 Perforation 422.50 423.00 13
2006-02-11 Perforation 411.50 412.00 13
2006-02-11 Perforation 408.10 408.60 13
2006-02-11 Perforation 403.70 404.20 13
2006-02-11 Perforation 402.30 402.80 13
2006-02-11 Perforation 353.20 353.70 13
2006-02-11 Perforation 352.20 352.70 13
2002-02-24 Packing Device Capped w/Cement 835.00 843.00 0
2006-02-11 Perforation 344.80 345.30 13
2006-02-11 Perforation 305.90 306.40 13
2006-02-11 Perforation 296.20 296.70 13
2006-02-11 Perforation 292.50 293.00 13
2006-02-11 Perforation 280.40 280.90 13
2006-02-11 Perforation 225.00 225.50 13
2006-02-15 Fracture 225.00 590.40 0
2011-10-14 Perforation 201.00 203.00 13
2011-10-14 Perforation 217.00 219.00 13
2011-10-14 Perforation 231.00 233.00 13
2002-02-27 Perforation 727.00 729.00 7
2011-10-14 Perforation 247.00 250.00 13
2011-10-14 Perforation 348.00 350.00 13
2011-10-14 Perforation 356.00 358.00 13
2011-10-14 Perforation 366.00 369.00 13
2011-10-20 Fracture 225.00 671.00 0
2002-06-13 Fracture 727.00 729.00 0
2002-08-09 Perforation 669.00 671.00 7
2002-08-09 Perforation 658.00 660.00 7
2002-09-20 Perforation 628.00 631.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 3915 0.0 0.0 0.0
2004 4401 0.0 0.0 0.0
2005 7980 0.0 0.0 0.0
2006 178 0.0 0.0 0.0
2010 1415 0.0 0.0 0.0

For data sources see[5]

References