X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264250106023

Well Details

Well ID: 0264250106023
Loading map...
Location: 02/06-01-026-25W4/3
Location Alias: 02/06-01-26-25 W4M
Location Alias 2: 02/06-01-026-25 W4/03
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 25
Section: 01
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 6-1-26-25
Operator Name: Ember Resources Inc.
License Number: 0260551
License Date: 2001-10-15
License Status: Issued
Spud Date: 2001-10-21
Final Drill Date: 2001-10-23
Well Total Depth: 995.00 m
Surface Hole Latitude: 51.190329
Surface Hole Longitude: -113.370276

For data sources see[1][2]

Well History

Date Event
2001-10-15 Obtained License
2001-10-21 Surface Casing Operation Performed
2001-10-23 Finished Drilling
2001-10-23 Production Casing Operation Performed
2001-10-23 Rig Released
2001-10-23 Well Mode changed to Drilled and Cased
2001-11-11 Well Log Performed
2001-11-14 Well Log Performed
2001-12-05 Perforation Treatment Performed - Jet Perforation
2002-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-25 Plug Back Performed
2002-02-02 Perforation Treatment Performed - Jet Perforation
2002-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-24 Plug Back Performed
2002-02-27 Perforation Treatment Performed - Jet Perforation
2002-06-13 Perforation Treatment Performed - Fractured
2002-08-09 Perforation Treatment Performed - Jet Perforation
2002-09-20 Perforation Treatment Performed - Jet Perforation
2002-10-07 Perforation Treatment Performed - Fractured
2002-11-13 Perforation Treatment Performed - Jet Perforation
2003-06-12 Well Began Production
2003-06-12 Well Fluid changed to Gas
2003-06-12 Well Mode changed to Flowing
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-15 Perforation Treatment Performed - Fractured
2010-04-01 Well Fluid changed to Gas
2010-04-01 Well Mode changed to Suspended
2011-10-14 Perforation Treatment Performed - Jet Perforation
2011-10-20 Perforation Treatment Performed - Fractured
2017-05-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-12-05 Perforation 886.00 888.00 7
2002-09-20 Perforation 634.00 637.00 7
2002-09-20 Perforation 645.00 649.00 7
2002-10-07 Fracture 628.00 649.00 0
2002-11-13 Perforation 394.00 398.00 7
2006-02-11 Perforation 589.90 590.40 13
2006-02-11 Perforation 584.30 584.80 13
2006-02-11 Perforation 580.10 580.60 13
2006-02-11 Perforation 547.60 548.10 13
2006-02-11 Perforation 546.50 547.00 13
2006-02-11 Perforation 540.00 541.00 13
2002-01-25 Packing Device Capped w/Cement 875.00 883.00 0
2006-02-11 Perforation 534.20 534.70 13
2006-02-11 Perforation 526.30 526.80 13
2006-02-11 Perforation 519.80 520.30 13
2006-02-11 Perforation 472.50 473.50 13
2006-02-11 Perforation 470.00 471.00 13
2006-02-11 Perforation 455.50 456.00 13
2006-02-11 Perforation 449.20 449.70 13
2006-02-11 Perforation 445.70 446.20 13
2006-02-11 Perforation 444.80 445.30 13
2006-02-11 Perforation 435.50 436.00 13
2002-02-02 Perforation 853.00 855.00 7
2006-02-11 Perforation 432.60 433.10 13
2006-02-11 Perforation 431.70 432.20 13
2006-02-11 Perforation 425.20 425.70 13
2006-02-11 Perforation 422.50 423.00 13
2006-02-11 Perforation 411.50 412.00 13
2006-02-11 Perforation 408.10 408.60 13
2006-02-11 Perforation 403.70 404.20 13
2006-02-11 Perforation 402.30 402.80 13
2006-02-11 Perforation 353.20 353.70 13
2006-02-11 Perforation 352.20 352.70 13
2002-02-24 Packing Device Capped w/Cement 835.00 843.00 0
2006-02-11 Perforation 344.80 345.30 13
2006-02-11 Perforation 305.90 306.40 13
2006-02-11 Perforation 296.20 296.70 13
2006-02-11 Perforation 292.50 293.00 13
2006-02-11 Perforation 280.40 280.90 13
2006-02-11 Perforation 225.00 225.50 13
2006-02-15 Fracture 225.00 590.40 0
2011-10-14 Perforation 201.00 203.00 13
2011-10-14 Perforation 217.00 219.00 13
2011-10-14 Perforation 231.00 233.00 13
2002-02-27 Perforation 727.00 729.00 7
2011-10-14 Perforation 247.00 250.00 13
2011-10-14 Perforation 348.00 350.00 13
2011-10-14 Perforation 356.00 358.00 13
2011-10-14 Perforation 366.00 369.00 13
2011-10-20 Fracture 225.00 671.00 0
2002-06-13 Fracture 727.00 729.00 0
2002-08-09 Perforation 669.00 671.00 7
2002-08-09 Perforation 658.00 660.00 7
2002-09-20 Perforation 628.00 631.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 3915 0.0 0.0 0.0
2004 4401 0.0 0.0 0.0
2005 7980 0.0 0.0 0.0
2006 178 0.0 0.0 0.0
2010 1415 0.0 0.0 0.0

For data sources see[5]

References