X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0195020911006"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0195020911006
 
| Well ID: 0195020911006
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.5955659, -114.2241859 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.594277, -114.224719 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: CANERA TV 11-9-19-2
+
| Location: 00/11-09-019-02W5/6
 
|-
 
|-
| Operator:
+
| Location Alias: 00/11-09-19-02 W5M
 +
|-
 +
| Location Alias 2: 00/11-09-019-02 W5/06
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 019
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 02
 +
|-
 +
| Section: 09
 +
|-
 +
| County/Municipality: [[Foothills County,_Alberta|Foothills County]]
 +
|-
 +
| Well Name: CPEC TV 11-9-19-2
 +
|-
 +
| Operator Name: [[Crescent Point Energy Corp.]]
 +
|-
 +
| License Number: 0162045
 
|-
 
|-
 
| License Date: 1993-11-04
 
| License Date: 1993-11-04
 
|-
 
|-
| Final Drilling Date: 1994-11-28
+
| License Status: Amended
 +
|-
 +
| Spud Date: 1993-11-28
 +
|-
 +
| Final Drill Date: 1994-11-28
 +
|-
 +
| Well Total Depth: 3202.00 m
 +
|-
 +
| Surface Hole Latitude: 50.594277
 +
|-
 +
| Surface Hole Longitude: -114.224719
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1993-11-04
 +
| Obtained License
 +
|-
 +
| 1994-09-26
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 1994-11-28
 +
| Finished Drilling
 +
|-
 +
| 1994-11-28
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1994-11-28
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1994-11-30
 +
| Rig Released
 +
|-
 +
| 1994-12-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1994-12-03
 +
| Plug Back Performed
 +
|-
 +
| 1994-12-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-12-06
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1994-12-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-12-06
 +
| Well Log Performed
 +
|-
 +
| 1994-12-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1994-12-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-12-09
 +
| Well Log Performed
 +
|-
 +
| 1994-12-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1994-12-13
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1994-12-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1994-12-18
 +
| Plug Back Performed
 +
|-
 +
| 1994-12-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-12-19
 +
| Well Log Performed
 +
|-
 +
| 1994-12-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1995-01-11
 +
| Well Log Performed
 +
|-
 +
| 1995-01-13
 +
| Well Log Performed
 +
|-
 +
| 1995-01-18
 +
| Well Log Performed
 +
|-
 +
| 1997-06-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1997-06-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1997-06-12
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Total Depth: 3202.0m
+
| 1997-06-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Fluid Type: Gas
+
| 1997-06-15
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
| Status: Abandoned Zone
+
| 2001-03-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Well Type: Not Applicable
+
| 2001-03-09
 +
| Plug Back Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2001-03-10
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Violations:
+
| 2001-05-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Latitude: 50.5955659
+
| 2001-05-18
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Longitude: -114.2241859
+
| 2001-05-18
 +
| Plug Back Performed
 +
|-
 +
| 2001-05-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2001-05-21
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2001-05-22
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2001-05-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-05-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-05-27
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2001-06-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-06-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-06-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-06-06
 +
| Plug Back Performed
 +
|-
 +
| 2001-06-09
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2001-06-10
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2001-06-10
 +
| Well Mode changed to Testing
 +
|-
 +
| 2001-06-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-06-11
 +
| Plug Back Performed
 +
|-
 +
| 2001-06-11
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2001-06-11
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2001-06-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-06-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-06-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-06-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-06-15
 +
| Plug Back Performed
 +
|-
 +
| 2001-06-19
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2010-06-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-06-10
 +
| Plug Back Performed
 +
|-
 +
| 2010-06-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-06-14
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 1994-09-26
 +
| style="text-align: right;" | 2633.00
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1994-11-28
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 3186.50
 +
| style="text-align: right;" | 3202.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-12-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 3130.00
 +
| style="text-align: right;" | 3138.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-12-19
 +
| Perforation
 +
| style="text-align: right;" | 3046.00
 +
| style="text-align: right;" | 3055.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1994-12-19
 +
| Perforation
 +
| style="text-align: right;" | 3061.00
 +
| style="text-align: right;" | 3064.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1994-12-19
 +
| Perforation
 +
| style="text-align: right;" | 3070.00
 +
| style="text-align: right;" | 3073.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1994-12-19
 +
| Perforation
 +
| style="text-align: right;" | 3076.00
 +
| style="text-align: right;" | 3080.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1994-12-20
 +
| Acid Treatment
 +
| style="text-align: right;" | 3046.00
 +
| style="text-align: right;" | 3080.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1997-06-08
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1687.00
 +
| style="text-align: right;" | 1695.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1997-06-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1492.00
 +
| style="text-align: right;" | 1500.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1997-06-12
 +
| Perforation
 +
| style="text-align: right;" | 1374.00
 +
| style="text-align: right;" | 1375.50
 +
| style="text-align: right;" | 18
 +
|-
 +
| 1997-06-12
 +
| Perforation
 +
| style="text-align: right;" | 1378.00
 +
| style="text-align: right;" | 1379.00
 +
| style="text-align: right;" | 18
 +
|-
 +
| 1994-12-03
 +
| Cement Squeeze
 +
| style="text-align: right;" | 3186.50
 +
| style="text-align: right;" | 3202.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1997-06-12
 +
| Perforation
 +
| style="text-align: right;" | 1384.50
 +
| style="text-align: right;" | 1393.00
 +
| style="text-align: right;" | 18
 +
|-
 +
| 1997-06-14
 +
| Acid Treatment
 +
| style="text-align: right;" | 1374.00
 +
| style="text-align: right;" | 1393.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1997-06-15
 +
| Fracture
 +
| style="text-align: right;" | 1374.00
 +
| style="text-align: right;" | 1393.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-03-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1353.00
 +
| style="text-align: right;" | 1361.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-03-10
 +
| Perforation
 +
| style="text-align: right;" | 1310.00
 +
| style="text-align: right;" | 1324.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-03-10
 +
| Perforation
 +
| style="text-align: right;" | 1292.00
 +
| style="text-align: right;" | 1298.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-03-10
 +
| Perforation
 +
| style="text-align: right;" | 1283.00
 +
| style="text-align: right;" | 1287.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-05-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1265.00
 +
| style="text-align: right;" | 1273.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-05-18
 +
| Perforation
 +
| style="text-align: right;" | 1047.00
 +
| style="text-align: right;" | 1048.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-05-18
 +
| Perforation
 +
| style="text-align: right;" | 1121.00
 +
| style="text-align: right;" | 1122.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1994-12-04
 +
| Perforation
 +
| style="text-align: right;" | 3176.00
 +
| style="text-align: right;" | 3180.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2001-05-20
 +
| Acid Treatment
 +
| style="text-align: right;" | 1047.00
 +
| style="text-align: right;" | 1048.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-05-20
 +
| Acid Treatment
 +
| style="text-align: right;" | 1121.00
 +
| style="text-align: right;" | 1122.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-05-21
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 1121.00
 +
| style="text-align: right;" | 1122.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-05-22
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 1047.00
 +
| style="text-align: right;" | 1048.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-05-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1110.00
 +
| style="text-align: right;" | 1118.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-05-25
 +
| Perforation
 +
| style="text-align: right;" | 1096.00
 +
| style="text-align: right;" | 1099.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-05-27
 +
| Fracture
 +
| style="text-align: right;" | 1096.00
 +
| style="text-align: right;" | 1099.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-06-03
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1110.00
 +
| style="text-align: right;" | 1118.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-06-06
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1085.00
 +
| style="text-align: right;" | 1093.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-06-06
 +
| Perforation
 +
| style="text-align: right;" | 1068.00
 +
| style="text-align: right;" | 1072.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1994-12-06
 +
| Acid Treatment
 +
| style="text-align: right;" | 3176.00
 +
| style="text-align: right;" | 3180.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-06-09
 +
| Fracture
 +
| style="text-align: right;" | 1068.00
 +
| style="text-align: right;" | 1072.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-06-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1052.80
 +
| style="text-align: right;" | 1060.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-06-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1029.00
 +
| style="text-align: right;" | 1037.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-06-13
 +
| Perforation
 +
| style="text-align: right;" | 908.00
 +
| style="text-align: right;" | 912.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-06-15
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 895.70
 +
| style="text-align: right;" | 903.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-06-15
 +
| Perforation
 +
| style="text-align: right;" | 780.00
 +
| style="text-align: right;" | 790.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-06-19
 +
| Fracture
 +
| style="text-align: right;" | 780.00
 +
| style="text-align: right;" | 790.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-06-10
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 888.00
 +
| style="text-align: right;" | 896.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-06-13
 +
| Perforation
 +
| style="text-align: right;" | 825.00
 +
| style="text-align: right;" | 826.00
 +
| style="text-align: right;" | 9
 +
|-
 +
| 2010-06-13
 +
| Perforation
 +
| style="text-align: right;" | 816.00
 +
| style="text-align: right;" | 817.00
 +
| style="text-align: right;" | 8
 +
|-
 +
| 1994-12-06
 +
| Perforation
 +
| style="text-align: right;" | 3180.00
 +
| style="text-align: right;" | 3186.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2010-06-14
 +
| Fracture
 +
| style="text-align: right;" | 816.00
 +
| style="text-align: right;" | 826.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-12-07
 +
| Acid Treatment
 +
| style="text-align: right;" | 3176.00
 +
| style="text-align: right;" | 3186.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-12-08
 +
| Perforation
 +
| style="text-align: right;" | 3143.00
 +
| style="text-align: right;" | 3158.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1994-12-10
 +
| Acid Treatment
 +
| style="text-align: right;" | 3143.00
 +
| style="text-align: right;" | 3158.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-12-13
 +
| Fracture
 +
| style="text-align: right;" | 3143.00
 +
| style="text-align: right;" | 3158.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2001
 +
| style="text-align: right;" | 96
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 13:53, 18 January 2021

Well Details

Well ID: 0195020911006
Loading map...
Location: 00/11-09-019-02W5/6
Location Alias: 00/11-09-19-02 W5M
Location Alias 2: 00/11-09-019-02 W5/06
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 09
County/Municipality: Foothills County
Well Name: CPEC TV 11-9-19-2
Operator Name: Crescent Point Energy Corp.
License Number: 0162045
License Date: 1993-11-04
License Status: Amended
Spud Date: 1993-11-28
Final Drill Date: 1994-11-28
Well Total Depth: 3202.00 m
Surface Hole Latitude: 50.594277
Surface Hole Longitude: -114.224719

For data sources see[1][2]

Well History

Date Event
1993-11-04 Obtained License
1994-09-26 Direction Drilling Operation Performed - Deviate
1994-11-28 Finished Drilling
1994-11-28 Perforation Treatment Performed - Open-Hole Completion
1994-11-28 Well Mode changed to Drilled and Cased
1994-11-30 Rig Released
1994-12-03 Perforation Treatment Performed - Cement Squeeze
1994-12-03 Plug Back Performed
1994-12-04 Perforation Treatment Performed - Jet Perforation
1994-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-06 Perforation Treatment Performed - Jet Perforation
1994-12-06 Well Log Performed
1994-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-08 Perforation Treatment Performed - Jet Perforation
1994-12-09 Well Log Performed
1994-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-13 Perforation Treatment Performed - Fractured
1994-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-18 Plug Back Performed
1994-12-19 Perforation Treatment Performed - Jet Perforation
1994-12-19 Well Log Performed
1994-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-11 Well Log Performed
1995-01-13 Well Log Performed
1995-01-18 Well Log Performed
1997-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-12 Perforation Treatment Performed - Jet Perforation
1997-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-15 Perforation Treatment Performed - Fractured
2001-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-09 Plug Back Performed
2001-03-10 Perforation Treatment Performed - Jet Perforation
2001-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-18 Perforation Treatment Performed - Jet Perforation
2001-05-18 Plug Back Performed
2001-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-21 Perforation Treatment Performed - Remedial Casing
2001-05-22 Perforation Treatment Performed - Remedial Casing
2001-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-25 Perforation Treatment Performed - Jet Perforation
2001-05-27 Perforation Treatment Performed - Fractured
2001-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-06 Perforation Treatment Performed - Jet Perforation
2001-06-06 Plug Back Performed
2001-06-09 Perforation Treatment Performed - Fractured
2001-06-10 Well Fluid changed to Gas
2001-06-10 Well Mode changed to Testing
2001-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-11 Plug Back Performed
2001-06-11 Well Fluid changed to Gas
2001-06-11 Well Mode changed to Abandoned Zone
2001-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-13 Perforation Treatment Performed - Jet Perforation
2001-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-15 Perforation Treatment Performed - Jet Perforation
2001-06-15 Plug Back Performed
2001-06-19 Perforation Treatment Performed - Fractured
2010-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-10 Plug Back Performed
2010-06-13 Perforation Treatment Performed - Jet Perforation
2010-06-14 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-09-26 2633.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-28 Open Hole/Barefoot Completion 3186.50 3202.00 0
1994-12-18 Packing Device Capped w/Cement 3130.00 3138.00 0
1994-12-19 Perforation 3046.00 3055.00 13
1994-12-19 Perforation 3061.00 3064.00 13
1994-12-19 Perforation 3070.00 3073.00 13
1994-12-19 Perforation 3076.00 3080.00 13
1994-12-20 Acid Treatment 3046.00 3080.00 0
1997-06-08 Packing Device Capped w/Cement 1687.00 1695.00 0
1997-06-09 Packing Device Capped w/Cement 1492.00 1500.00 0
1997-06-12 Perforation 1374.00 1375.50 18
1997-06-12 Perforation 1378.00 1379.00 18
1994-12-03 Cement Squeeze 3186.50 3202.00 0
1997-06-12 Perforation 1384.50 1393.00 18
1997-06-14 Acid Treatment 1374.00 1393.00 0
1997-06-15 Fracture 1374.00 1393.00 0
2001-03-09 Packing Device Capped w/Cement 1353.00 1361.00 0
2001-03-10 Perforation 1310.00 1324.00 17
2001-03-10 Perforation 1292.00 1298.00 17
2001-03-10 Perforation 1283.00 1287.00 17
2001-05-18 Packing Device Capped w/Cement 1265.00 1273.00 0
2001-05-18 Perforation 1047.00 1048.00 17
2001-05-18 Perforation 1121.00 1122.00 17
1994-12-04 Perforation 3176.00 3180.00 13
2001-05-20 Acid Treatment 1047.00 1048.00 0
2001-05-20 Acid Treatment 1121.00 1122.00 0
2001-05-21 Remedial Casing Cementing 1121.00 1122.00 0
2001-05-22 Remedial Casing Cementing 1047.00 1048.00 0
2001-05-25 Packing Device Capped w/Cement 1110.00 1118.00 0
2001-05-25 Perforation 1096.00 1099.00 17
2001-05-27 Fracture 1096.00 1099.00 0
2001-06-03 Packing Device Capped w/Cement 1110.00 1118.00 0
2001-06-06 Packing Device Capped w/Cement 1085.00 1093.00 0
2001-06-06 Perforation 1068.00 1072.00 17
1994-12-06 Acid Treatment 3176.00 3180.00 0
2001-06-09 Fracture 1068.00 1072.00 0
2001-06-11 Packing Device Capped w/Cement 1052.80 1060.80 0
2001-06-12 Packing Device Capped w/Cement 1029.00 1037.00 0
2001-06-13 Perforation 908.00 912.00 17
2001-06-15 Packing Device Capped w/Cement 895.70 903.70 0
2001-06-15 Perforation 780.00 790.00 17
2001-06-19 Fracture 780.00 790.00 0
2010-06-10 Packing Device Capped w/Cement 888.00 896.00 0
2010-06-13 Perforation 825.00 826.00 9
2010-06-13 Perforation 816.00 817.00 8
1994-12-06 Perforation 3180.00 3186.00 13
2010-06-14 Fracture 816.00 826.00 0
1994-12-07 Acid Treatment 3176.00 3186.00 0
1994-12-08 Perforation 3143.00 3158.00 13
1994-12-10 Acid Treatment 3143.00 3158.00 0
1994-12-13 Fracture 3143.00 3158.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 96 0.0 0.0 0.0

For data sources see[6]

References