If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0195020911006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.594277,"lon":-114.224719,"icon":""}]} |
Location: 00/11-09-019-02W5/6 | |
Location Alias: 00/11-09-19-02 W5M | |
Location Alias 2: 00/11-09-019-02 W5/06 | |
Country: Canada | |
Province: Alberta | |
Township: 019 | |
Meridian: 5 | |
Range: 02 | |
Section: 09 | |
County/Municipality: Foothills County | |
Well Name: CPEC TV 11-9-19-2 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0162045 | |
License Date: 1993-11-04 | |
License Status: Amended | |
Spud Date: 1993-11-28 | |
Final Drill Date: 1994-11-28 | |
Well Total Depth: 3202.00 m | |
Surface Hole Latitude: 50.594277 | |
Surface Hole Longitude: -114.224719 |
Date | Event |
---|---|
1993-11-04 | Obtained License |
1994-09-26 | Direction Drilling Operation Performed - Deviate |
1994-11-28 | Finished Drilling |
1994-11-28 | Perforation Treatment Performed - Open-Hole Completion |
1994-11-28 | Well Mode changed to Drilled and Cased |
1994-11-30 | Rig Released |
1994-12-03 | Perforation Treatment Performed - Cement Squeeze |
1994-12-03 | Plug Back Performed |
1994-12-04 | Perforation Treatment Performed - Jet Perforation |
1994-12-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-12-06 | Perforation Treatment Performed - Jet Perforation |
1994-12-06 | Well Log Performed |
1994-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-12-08 | Perforation Treatment Performed - Jet Perforation |
1994-12-09 | Well Log Performed |
1994-12-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-12-13 | Perforation Treatment Performed - Fractured |
1994-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-12-18 | Plug Back Performed |
1994-12-19 | Perforation Treatment Performed - Jet Perforation |
1994-12-19 | Well Log Performed |
1994-12-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-01-11 | Well Log Performed |
1995-01-13 | Well Log Performed |
1995-01-18 | Well Log Performed |
1997-06-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-06-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-06-12 | Perforation Treatment Performed - Jet Perforation |
1997-06-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-06-15 | Perforation Treatment Performed - Fractured |
2001-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-03-09 | Plug Back Performed |
2001-03-10 | Perforation Treatment Performed - Jet Perforation |
2001-05-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-05-18 | Perforation Treatment Performed - Jet Perforation |
2001-05-18 | Plug Back Performed |
2001-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-05-21 | Perforation Treatment Performed - Remedial Casing |
2001-05-22 | Perforation Treatment Performed - Remedial Casing |
2001-05-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-05-25 | Perforation Treatment Performed - Jet Perforation |
2001-05-27 | Perforation Treatment Performed - Fractured |
2001-06-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-06 | Perforation Treatment Performed - Jet Perforation |
2001-06-06 | Plug Back Performed |
2001-06-09 | Perforation Treatment Performed - Fractured |
2001-06-10 | Well Fluid changed to Gas |
2001-06-10 | Well Mode changed to Testing |
2001-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-11 | Plug Back Performed |
2001-06-11 | Well Fluid changed to Gas |
2001-06-11 | Well Mode changed to Abandoned Zone |
2001-06-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-13 | Perforation Treatment Performed - Jet Perforation |
2001-06-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-15 | Perforation Treatment Performed - Jet Perforation |
2001-06-15 | Plug Back Performed |
2001-06-19 | Perforation Treatment Performed - Fractured |
2010-06-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-10 | Plug Back Performed |
2010-06-13 | Perforation Treatment Performed - Jet Perforation |
2010-06-14 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-09-26 | 2633.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-11-28 | Open Hole/Barefoot Completion | 3186.50 | 3202.00 | 0 |
1994-12-18 | Packing Device Capped w/Cement | 3130.00 | 3138.00 | 0 |
1994-12-19 | Perforation | 3046.00 | 3055.00 | 13 |
1994-12-19 | Perforation | 3061.00 | 3064.00 | 13 |
1994-12-19 | Perforation | 3070.00 | 3073.00 | 13 |
1994-12-19 | Perforation | 3076.00 | 3080.00 | 13 |
1994-12-20 | Acid Treatment | 3046.00 | 3080.00 | 0 |
1997-06-08 | Packing Device Capped w/Cement | 1687.00 | 1695.00 | 0 |
1997-06-09 | Packing Device Capped w/Cement | 1492.00 | 1500.00 | 0 |
1997-06-12 | Perforation | 1374.00 | 1375.50 | 18 |
1997-06-12 | Perforation | 1378.00 | 1379.00 | 18 |
1994-12-03 | Cement Squeeze | 3186.50 | 3202.00 | 0 |
1997-06-12 | Perforation | 1384.50 | 1393.00 | 18 |
1997-06-14 | Acid Treatment | 1374.00 | 1393.00 | 0 |
1997-06-15 | Fracture | 1374.00 | 1393.00 | 0 |
2001-03-09 | Packing Device Capped w/Cement | 1353.00 | 1361.00 | 0 |
2001-03-10 | Perforation | 1310.00 | 1324.00 | 17 |
2001-03-10 | Perforation | 1292.00 | 1298.00 | 17 |
2001-03-10 | Perforation | 1283.00 | 1287.00 | 17 |
2001-05-18 | Packing Device Capped w/Cement | 1265.00 | 1273.00 | 0 |
2001-05-18 | Perforation | 1047.00 | 1048.00 | 17 |
2001-05-18 | Perforation | 1121.00 | 1122.00 | 17 |
1994-12-04 | Perforation | 3176.00 | 3180.00 | 13 |
2001-05-20 | Acid Treatment | 1047.00 | 1048.00 | 0 |
2001-05-20 | Acid Treatment | 1121.00 | 1122.00 | 0 |
2001-05-21 | Remedial Casing Cementing | 1121.00 | 1122.00 | 0 |
2001-05-22 | Remedial Casing Cementing | 1047.00 | 1048.00 | 0 |
2001-05-25 | Packing Device Capped w/Cement | 1110.00 | 1118.00 | 0 |
2001-05-25 | Perforation | 1096.00 | 1099.00 | 17 |
2001-05-27 | Fracture | 1096.00 | 1099.00 | 0 |
2001-06-03 | Packing Device Capped w/Cement | 1110.00 | 1118.00 | 0 |
2001-06-06 | Packing Device Capped w/Cement | 1085.00 | 1093.00 | 0 |
2001-06-06 | Perforation | 1068.00 | 1072.00 | 17 |
1994-12-06 | Acid Treatment | 3176.00 | 3180.00 | 0 |
2001-06-09 | Fracture | 1068.00 | 1072.00 | 0 |
2001-06-11 | Packing Device Capped w/Cement | 1052.80 | 1060.80 | 0 |
2001-06-12 | Packing Device Capped w/Cement | 1029.00 | 1037.00 | 0 |
2001-06-13 | Perforation | 908.00 | 912.00 | 17 |
2001-06-15 | Packing Device Capped w/Cement | 895.70 | 903.70 | 0 |
2001-06-15 | Perforation | 780.00 | 790.00 | 17 |
2001-06-19 | Fracture | 780.00 | 790.00 | 0 |
2010-06-10 | Packing Device Capped w/Cement | 888.00 | 896.00 | 0 |
2010-06-13 | Perforation | 825.00 | 826.00 | 9 |
2010-06-13 | Perforation | 816.00 | 817.00 | 8 |
1994-12-06 | Perforation | 3180.00 | 3186.00 | 13 |
2010-06-14 | Fracture | 816.00 | 826.00 | 0 |
1994-12-07 | Acid Treatment | 3176.00 | 3186.00 | 0 |
1994-12-08 | Perforation | 3143.00 | 3158.00 | 13 |
1994-12-10 | Acid Treatment | 3143.00 | 3158.00 | 0 |
1994-12-13 | Fracture | 3143.00 | 3158.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 96 | 0.0 | 0.0 | 0.0 |
For data sources see[6]