If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0635111904000 | | Well ID: 0635111904000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 54.459629, -115.661815 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/04-19-063-11W5/0 | | Location: 00/04-19-063-11W5/0 | ||
|- | |- | ||
− | | Well Name: | + | | Location Alias: 00/04-19-63-11 W5M |
+ | |- | ||
+ | | Location Alias 2: 00/04-19-063-11 W5/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 063 | ||
+ | |- | ||
+ | | Meridian: 5 | ||
+ | |- | ||
+ | | Range: 11 | ||
+ | |- | ||
+ | | Section: 19 | ||
+ | |- | ||
+ | | County/Municipality: [[Woodlands County,_Alberta|Woodlands County]] | ||
+ | |- | ||
+ | | Well Name: ACCEL JUDYCK 4-19-63-11 | ||
+ | |- | ||
+ | | Operator Name: [[ACCEL Energy Canada Limited]] | ||
+ | |- | ||
+ | | License Number: 0019455 | ||
|- | |- | ||
| License Date: 1960-07-28 | | License Date: 1960-07-28 | ||
|- | |- | ||
− | | Final Drilling Date | + | | License Status: Suspension |
+ | |- | ||
+ | | Spud Date: 1960-08-02 | ||
+ | |- | ||
+ | | Final Drill Date: 1960-10-10 | ||
+ | |- | ||
+ | | Well Total Depth: 2762.10 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 54.459629 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -115.661815 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1960-07-28 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1960-10-10 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1960-10-10 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1960-10-10 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1960-10-10 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1960-10-10 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1960-10-12 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1960-10-12 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
|- | |- | ||
− | | | + | | 1960-10-14 |
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
|- | |- | ||
− | | | + | | 1960-10-20 |
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
|- | |- | ||
− | | | + | | 1960-10-21 |
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
|- | |- | ||
− | | | + | | 1960-10-21 |
+ | | Perforation Treatment Performed - Jet Perforation | ||
|- | |- | ||
− | | | + | | 1960-10-30 |
+ | | Well Began Production | ||
|- | |- | ||
− | | | + | | 1960-10-30 |
+ | | Well Fluid changed to Crude Oil | ||
|- | |- | ||
− | | | + | | 1960-10-30 |
+ | | Well Mode changed to Flowing | ||
|- | |- | ||
+ | | 1977-02-05 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1977-02-09 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1979-04-07 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1979-04-07 | ||
+ | | Well Mode changed to Gas Lift | ||
+ | |- | ||
+ | | 1979-04-14 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1981-09-19 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1981-09-19 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1981-09-21 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1982-06-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1982-06-01 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | | 1996-09-03 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1996-09-07 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1996-09-07 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1996-09-09 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1996-09-11 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1996-09-11 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1996-09-16 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1996-09-19 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1996-09-22 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1996-09-23 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1996-09-28 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1996-09-28 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1996-09-28 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1996-09-28 | ||
+ | | Well Mode changed to Abandoned Zone | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 1960-10-10 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2683.20 | ||
+ | | style="text-align: right;" | 2686.20 | ||
+ | | style="text-align: right;" | 3 | ||
+ | |- | ||
+ | | 1977-02-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2635.30 | ||
+ | | style="text-align: right;" | 2639.60 | ||
+ | | style="text-align: right;" | 3 | ||
+ | |- | ||
+ | | 1977-02-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2646.30 | ||
+ | | style="text-align: right;" | 2650.80 | ||
+ | | style="text-align: right;" | 3 | ||
+ | |- | ||
+ | | 1977-02-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2657.90 | ||
+ | | style="text-align: right;" | 2658.80 | ||
+ | | style="text-align: right;" | 3 | ||
+ | |- | ||
+ | | 1977-02-09 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2635.30 | ||
+ | | style="text-align: right;" | 2658.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1979-04-14 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2635.30 | ||
+ | | style="text-align: right;" | 2658.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1981-09-19 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 2671.50 | ||
+ | | style="text-align: right;" | 2671.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1981-09-19 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2654.20 | ||
+ | | style="text-align: right;" | 2656.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1981-09-19 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2657.90 | ||
+ | | style="text-align: right;" | 2658.80 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1981-09-19 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2662.10 | ||
+ | | style="text-align: right;" | 2663.60 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1981-09-19 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2664.90 | ||
+ | | style="text-align: right;" | 2666.70 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1960-10-10 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2683.20 | ||
+ | | style="text-align: right;" | 2686.20 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1981-09-21 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2654.20 | ||
+ | | style="text-align: right;" | 2666.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1996-09-03 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 2635.30 | ||
+ | | style="text-align: right;" | 2644.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1996-09-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2646.20 | ||
+ | | style="text-align: right;" | 2651.10 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1996-09-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2653.00 | ||
+ | | style="text-align: right;" | 2656.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1996-09-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2657.80 | ||
+ | | style="text-align: right;" | 2659.10 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1996-09-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2662.10 | ||
+ | | style="text-align: right;" | 2663.60 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1996-09-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2665.20 | ||
+ | | style="text-align: right;" | 2666.70 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1996-09-09 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2646.20 | ||
+ | | style="text-align: right;" | 2666.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1996-09-11 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 2635.30 | ||
+ | | style="text-align: right;" | 2644.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1996-09-16 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2646.20 | ||
+ | | style="text-align: right;" | 2666.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1960-10-12 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 2680.40 | ||
+ | | style="text-align: right;" | 2680.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1996-09-19 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2646.20 | ||
+ | | style="text-align: right;" | 2666.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1996-09-22 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2640.80 | ||
+ | | style="text-align: right;" | 2644.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1996-09-23 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2640.80 | ||
+ | | style="text-align: right;" | 2644.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1996-09-28 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 2051.00 | ||
+ | | style="text-align: right;" | 2624.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1960-10-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2673.40 | ||
+ | | style="text-align: right;" | 2674.90 | ||
+ | | style="text-align: right;" | 3 | ||
+ | |- | ||
+ | | 1960-10-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2675.20 | ||
+ | | style="text-align: right;" | 2676.80 | ||
+ | | style="text-align: right;" | 3 | ||
+ | |- | ||
+ | | 1960-10-14 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2673.40 | ||
+ | | style="text-align: right;" | 2676.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1960-10-20 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 2664.00 | ||
+ | | style="text-align: right;" | 2664.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1960-10-21 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2639.90 | ||
+ | | style="text-align: right;" | 2644.40 | ||
+ | | style="text-align: right;" | 3 | ||
+ | |- | ||
+ | | 1960-10-21 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2639.90 | ||
+ | | style="text-align: right;" | 2644.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = General Well Data File - Tour-Perforation/Treatment Data |
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 1961 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1962 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1963 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1964 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1965 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1966 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1967 | ||
+ | | style="text-align: right;" | 7838 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1968 | ||
+ | | style="text-align: right;" | 7984 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1969 | ||
+ | | style="text-align: right;" | 6579 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1970 | ||
+ | | style="text-align: right;" | 8101 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1971 | ||
+ | | style="text-align: right;" | 7622 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1972 | ||
+ | | style="text-align: right;" | 7332 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1973 | ||
+ | | style="text-align: right;" | 6966 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1974 | ||
+ | | style="text-align: right;" | 4834 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1979 | ||
+ | | style="text-align: right;" | 1802 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1981 | ||
+ | | style="text-align: right;" | 1052 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1989 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0635111904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.459629,"lon":-115.661815,"icon":""}]} |
Location: 00/04-19-063-11W5/0 | |
Location Alias: 00/04-19-63-11 W5M | |
Location Alias 2: 00/04-19-063-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 11 | |
Section: 19 | |
County/Municipality: Woodlands County | |
Well Name: ACCEL JUDYCK 4-19-63-11 | |
Operator Name: ACCEL Energy Canada Limited | |
License Number: 0019455 | |
License Date: 1960-07-28 | |
License Status: Suspension | |
Spud Date: 1960-08-02 | |
Final Drill Date: 1960-10-10 | |
Well Total Depth: 2762.10 m | |
Surface Hole Latitude: 54.459629 | |
Surface Hole Longitude: -115.661815 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1960-07-28 | Obtained License |
1960-10-10 | Finished Drilling |
1960-10-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-10-10 | Perforation Treatment Performed - Jet Perforation |
1960-10-10 | Production Casing Operation Performed |
1960-10-10 | Well Mode changed to Drilled and Cased |
1960-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1960-10-12 | Perforation Treatment Performed - Jet Perforation |
1960-10-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1960-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-10-21 | Perforation Treatment Performed - Jet Perforation |
1960-10-30 | Well Began Production |
1960-10-30 | Well Fluid changed to Crude Oil |
1960-10-30 | Well Mode changed to Flowing |
1977-02-05 | Perforation Treatment Performed - Jet Perforation |
1977-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-04-07 | Well Fluid changed to Crude Oil |
1979-04-07 | Well Mode changed to Gas Lift |
1979-04-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-09-19 | Perforation Treatment Performed - Jet Perforation |
1981-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-06-01 | Well Fluid changed to Crude Oil |
1982-06-01 | Well Mode changed to Suspended |
1996-09-03 | Perforation Treatment Performed - Cement Squeeze |
1996-09-07 | Perforation Treatment Performed - Jet Perforation |
1996-09-07 | Well Log Performed |
1996-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-11 | Perforation Treatment Performed - Cement Squeeze |
1996-09-11 | Well Log Performed |
1996-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-22 | Perforation Treatment Performed - Jet Perforation |
1996-09-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-09-28 | Plug Back Performed |
1996-09-28 | Well Fluid changed to Crude Oil |
1996-09-28 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-10-10 | Perforation | 2683.20 | 2686.20 | 3 |
1977-02-05 | Perforation | 2635.30 | 2639.60 | 3 |
1977-02-05 | Perforation | 2646.30 | 2650.80 | 3 |
1977-02-05 | Perforation | 2657.90 | 2658.80 | 3 |
1977-02-09 | Acid Treatment | 2635.30 | 2658.80 | 0 |
1979-04-14 | Acid Treatment | 2635.30 | 2658.80 | 0 |
1981-09-19 | Packing Device Capped w/Cement | 2671.50 | 2671.50 | 0 |
1981-09-19 | Perforation | 2654.20 | 2656.00 | 7 |
1981-09-19 | Perforation | 2657.90 | 2658.80 | 7 |
1981-09-19 | Perforation | 2662.10 | 2663.60 | 7 |
1981-09-19 | Perforation | 2664.90 | 2666.70 | 7 |
1960-10-10 | Acid Treatment | 2683.20 | 2686.20 | 0 |
1981-09-21 | Acid Treatment | 2654.20 | 2666.70 | 0 |
1996-09-03 | Cement Squeeze | 2635.30 | 2644.40 | 0 |
1996-09-07 | Perforation | 2646.20 | 2651.10 | 7 |
1996-09-07 | Perforation | 2653.00 | 2656.00 | 13 |
1996-09-07 | Perforation | 2657.80 | 2659.10 | 13 |
1996-09-07 | Perforation | 2662.10 | 2663.60 | 13 |
1996-09-07 | Perforation | 2665.20 | 2666.70 | 13 |
1996-09-09 | Acid Treatment | 2646.20 | 2666.70 | 0 |
1996-09-11 | Cement Squeeze | 2635.30 | 2644.40 | 0 |
1996-09-16 | Acid Treatment | 2646.20 | 2666.70 | 0 |
1960-10-12 | Packing Device Capped w/Cement | 2680.40 | 2680.40 | 0 |
1996-09-19 | Acid Treatment | 2646.20 | 2666.70 | 0 |
1996-09-22 | Perforation | 2640.80 | 2644.40 | 13 |
1996-09-23 | Acid Treatment | 2640.80 | 2644.40 | 0 |
1996-09-28 | Packing Device Capped w/Cement | 2051.00 | 2624.00 | 0 |
1960-10-12 | Perforation | 2673.40 | 2674.90 | 3 |
1960-10-12 | Perforation | 2675.20 | 2676.80 | 3 |
1960-10-14 | Acid Treatment | 2673.40 | 2676.80 | 0 |
1960-10-20 | Packing Device Capped w/Cement | 2664.00 | 2664.00 | 0 |
1960-10-21 | Perforation | 2639.90 | 2644.40 | 3 |
1960-10-21 | Acid Treatment | 2639.90 | 2644.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 7838 | 0.0 | 0.0 | 0.0 |
1968 | 7984 | 0.0 | 0.0 | 0.0 |
1969 | 6579 | 0.0 | 0.0 | 0.0 |
1970 | 8101 | 0.0 | 0.0 | 0.0 |
1971 | 7622 | 0.0 | 0.0 | 0.0 |
1972 | 7332 | 0.0 | 0.0 | 0.0 |
1973 | 6966 | 0.0 | 0.0 | 0.0 |
1974 | 4834 | 0.0 | 0.0 | 0.0 |
1979 | 1802 | 0.0 | 0.0 | 0.0 |
1981 | 1052 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]