X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0635111904000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0635111904000
 
| Well ID: 0635111904000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.45962900000000673, -115.66181499999999005 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.459629, -115.661815 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/04-19-063-11W5/0
 
| Location: 00/04-19-063-11W5/0
 
|-
 
|-
| Well Name: IMP JUDY WEST 4-19-63-11
+
| Location Alias: 00/04-19-63-11 W5M
 +
|-
 +
| Location Alias 2: 00/04-19-063-11 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 063
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 11
 +
|-
 +
| Section: 19
 +
|-
 +
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
 +
|-
 +
| Well Name: ACCEL JUDYCK 4-19-63-11
 +
|-
 +
| Operator Name: [[ACCEL Energy Canada Limited]]
 +
|-
 +
| License Number: 0019455
 
|-
 
|-
 
| License Date: 1960-07-28
 
| License Date: 1960-07-28
 
|-
 
|-
| Final Drilling Date: 1960-10-10
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 1960-08-02
 +
|-
 +
| Final Drill Date: 1960-10-10
 +
|-
 +
| Well Total Depth: 2762.10 m
 +
|-
 +
| Surface Hole Latitude: 54.459629
 +
|-
 +
| Surface Hole Longitude: -115.661815
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1960-07-28
 +
| Obtained License
 +
|-
 +
| 1960-10-10
 +
| Finished Drilling
 +
|-
 +
| 1960-10-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1960-10-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1960-10-10
 +
| Production Casing Operation Performed
 +
|-
 +
| 1960-10-10
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1960-10-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1960-10-12
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Total Depth: 2762.1m
+
| 1960-10-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1960-10-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Status: Abandoned Zone
+
| 1960-10-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Well Type: Not Applicable
+
| 1960-10-21
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Configuration: Vertical
+
| 1960-10-30
 +
| Well Began Production
 
|-
 
|-
| Latitude: 54.45962900000000673
+
| 1960-10-30
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Longitude: -115.66181499999999005
+
| 1960-10-30
 +
| Well Mode changed to Flowing
 
|-
 
|-
 +
| 1977-02-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-02-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-04-07
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1979-04-07
 +
| Well Mode changed to Gas Lift
 +
|-
 +
| 1979-04-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1981-09-19
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1981-09-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-09-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1982-06-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1982-06-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1996-09-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1996-09-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-09-07
 +
| Well Log Performed
 +
|-
 +
| 1996-09-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-09-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1996-09-11
 +
| Well Log Performed
 +
|-
 +
| 1996-09-16
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-09-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-09-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-09-23
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-09-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1996-09-28
 +
| Plug Back Performed
 +
|-
 +
| 1996-09-28
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1996-09-28
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
  
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1960-10-10
 +
| Perforation
 +
| style="text-align: right;" | 2683.20
 +
| style="text-align: right;" | 2686.20
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1977-02-05
 +
| Perforation
 +
| style="text-align: right;" | 2635.30
 +
| style="text-align: right;" | 2639.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1977-02-05
 +
| Perforation
 +
| style="text-align: right;" | 2646.30
 +
| style="text-align: right;" | 2650.80
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1977-02-05
 +
| Perforation
 +
| style="text-align: right;" | 2657.90
 +
| style="text-align: right;" | 2658.80
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1977-02-09
 +
| Acid Treatment
 +
| style="text-align: right;" | 2635.30
 +
| style="text-align: right;" | 2658.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-04-14
 +
| Acid Treatment
 +
| style="text-align: right;" | 2635.30
 +
| style="text-align: right;" | 2658.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-09-19
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2671.50
 +
| style="text-align: right;" | 2671.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-09-19
 +
| Perforation
 +
| style="text-align: right;" | 2654.20
 +
| style="text-align: right;" | 2656.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1981-09-19
 +
| Perforation
 +
| style="text-align: right;" | 2657.90
 +
| style="text-align: right;" | 2658.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1981-09-19
 +
| Perforation
 +
| style="text-align: right;" | 2662.10
 +
| style="text-align: right;" | 2663.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1981-09-19
 +
| Perforation
 +
| style="text-align: right;" | 2664.90
 +
| style="text-align: right;" | 2666.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1960-10-10
 +
| Acid Treatment
 +
| style="text-align: right;" | 2683.20
 +
| style="text-align: right;" | 2686.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-09-21
 +
| Acid Treatment
 +
| style="text-align: right;" | 2654.20
 +
| style="text-align: right;" | 2666.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-03
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2635.30
 +
| style="text-align: right;" | 2644.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-07
 +
| Perforation
 +
| style="text-align: right;" | 2646.20
 +
| style="text-align: right;" | 2651.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1996-09-07
 +
| Perforation
 +
| style="text-align: right;" | 2653.00
 +
| style="text-align: right;" | 2656.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-09-07
 +
| Perforation
 +
| style="text-align: right;" | 2657.80
 +
| style="text-align: right;" | 2659.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-09-07
 +
| Perforation
 +
| style="text-align: right;" | 2662.10
 +
| style="text-align: right;" | 2663.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-09-07
 +
| Perforation
 +
| style="text-align: right;" | 2665.20
 +
| style="text-align: right;" | 2666.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-09-09
 +
| Acid Treatment
 +
| style="text-align: right;" | 2646.20
 +
| style="text-align: right;" | 2666.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-11
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2635.30
 +
| style="text-align: right;" | 2644.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-16
 +
| Acid Treatment
 +
| style="text-align: right;" | 2646.20
 +
| style="text-align: right;" | 2666.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1960-10-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2680.40
 +
| style="text-align: right;" | 2680.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-19
 +
| Acid Treatment
 +
| style="text-align: right;" | 2646.20
 +
| style="text-align: right;" | 2666.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-22
 +
| Perforation
 +
| style="text-align: right;" | 2640.80
 +
| style="text-align: right;" | 2644.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-09-23
 +
| Acid Treatment
 +
| style="text-align: right;" | 2640.80
 +
| style="text-align: right;" | 2644.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-28
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2051.00
 +
| style="text-align: right;" | 2624.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1960-10-12
 +
| Perforation
 +
| style="text-align: right;" | 2673.40
 +
| style="text-align: right;" | 2674.90
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1960-10-12
 +
| Perforation
 +
| style="text-align: right;" | 2675.20
 +
| style="text-align: right;" | 2676.80
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1960-10-14
 +
| Acid Treatment
 +
| style="text-align: right;" | 2673.40
 +
| style="text-align: right;" | 2676.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1960-10-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2664.00
 +
| style="text-align: right;" | 2664.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1960-10-21
 +
| Perforation
 +
| style="text-align: right;" | 2639.90
 +
| style="text-align: right;" | 2644.40
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1960-10-21
 +
| Acid Treatment
 +
| style="text-align: right;" | 2639.90
 +
| style="text-align: right;" | 2644.40
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1961
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1967
 +
| style="text-align: right;" | 7838
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 7984
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1969
 +
| style="text-align: right;" | 6579
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1970
 +
| style="text-align: right;" | 8101
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1971
 +
| style="text-align: right;" | 7622
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1972
 +
| style="text-align: right;" | 7332
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1973
 +
| style="text-align: right;" | 6966
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1974
 +
| style="text-align: right;" | 4834
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1979
 +
| style="text-align: right;" | 1802
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1981
 +
| style="text-align: right;" | 1052
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1989
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 03:31, 18 January 2021

Well Details

Well ID: 0635111904000
Loading map...
Location: 00/04-19-063-11W5/0
Location Alias: 00/04-19-63-11 W5M
Location Alias 2: 00/04-19-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 19
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 4-19-63-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0019455
License Date: 1960-07-28
License Status: Suspension
Spud Date: 1960-08-02
Final Drill Date: 1960-10-10
Well Total Depth: 2762.10 m
Surface Hole Latitude: 54.459629
Surface Hole Longitude: -115.661815

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-07-28 Obtained License
1960-10-10 Finished Drilling
1960-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-10 Perforation Treatment Performed - Jet Perforation
1960-10-10 Production Casing Operation Performed
1960-10-10 Well Mode changed to Drilled and Cased
1960-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-10-12 Perforation Treatment Performed - Jet Perforation
1960-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-21 Perforation Treatment Performed - Jet Perforation
1960-10-30 Well Began Production
1960-10-30 Well Fluid changed to Crude Oil
1960-10-30 Well Mode changed to Flowing
1977-02-05 Perforation Treatment Performed - Jet Perforation
1977-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-07 Well Fluid changed to Crude Oil
1979-04-07 Well Mode changed to Gas Lift
1979-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-19 Perforation Treatment Performed - Jet Perforation
1981-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-01 Well Fluid changed to Crude Oil
1982-06-01 Well Mode changed to Suspended
1996-09-03 Perforation Treatment Performed - Cement Squeeze
1996-09-07 Perforation Treatment Performed - Jet Perforation
1996-09-07 Well Log Performed
1996-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-11 Perforation Treatment Performed - Cement Squeeze
1996-09-11 Well Log Performed
1996-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-22 Perforation Treatment Performed - Jet Perforation
1996-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-28 Plug Back Performed
1996-09-28 Well Fluid changed to Crude Oil
1996-09-28 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-10-10 Perforation 2683.20 2686.20 3
1977-02-05 Perforation 2635.30 2639.60 3
1977-02-05 Perforation 2646.30 2650.80 3
1977-02-05 Perforation 2657.90 2658.80 3
1977-02-09 Acid Treatment 2635.30 2658.80 0
1979-04-14 Acid Treatment 2635.30 2658.80 0
1981-09-19 Packing Device Capped w/Cement 2671.50 2671.50 0
1981-09-19 Perforation 2654.20 2656.00 7
1981-09-19 Perforation 2657.90 2658.80 7
1981-09-19 Perforation 2662.10 2663.60 7
1981-09-19 Perforation 2664.90 2666.70 7
1960-10-10 Acid Treatment 2683.20 2686.20 0
1981-09-21 Acid Treatment 2654.20 2666.70 0
1996-09-03 Cement Squeeze 2635.30 2644.40 0
1996-09-07 Perforation 2646.20 2651.10 7
1996-09-07 Perforation 2653.00 2656.00 13
1996-09-07 Perforation 2657.80 2659.10 13
1996-09-07 Perforation 2662.10 2663.60 13
1996-09-07 Perforation 2665.20 2666.70 13
1996-09-09 Acid Treatment 2646.20 2666.70 0
1996-09-11 Cement Squeeze 2635.30 2644.40 0
1996-09-16 Acid Treatment 2646.20 2666.70 0
1960-10-12 Packing Device Capped w/Cement 2680.40 2680.40 0
1996-09-19 Acid Treatment 2646.20 2666.70 0
1996-09-22 Perforation 2640.80 2644.40 13
1996-09-23 Acid Treatment 2640.80 2644.40 0
1996-09-28 Packing Device Capped w/Cement 2051.00 2624.00 0
1960-10-12 Perforation 2673.40 2674.90 3
1960-10-12 Perforation 2675.20 2676.80 3
1960-10-14 Acid Treatment 2673.40 2676.80 0
1960-10-20 Packing Device Capped w/Cement 2664.00 2664.00 0
1960-10-21 Perforation 2639.90 2644.40 3
1960-10-21 Acid Treatment 2639.90 2644.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7838 0.0 0.0 0.0
1968 7984 0.0 0.0 0.0
1969 6579 0.0 0.0 0.0
1970 8101 0.0 0.0 0.0
1971 7622 0.0 0.0 0.0
1972 7332 0.0 0.0 0.0
1973 6966 0.0 0.0 0.0
1974 4834 0.0 0.0 0.0
1979 1802 0.0 0.0 0.0
1981 1052 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References