If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 309: | Line 309: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0364082911000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.122915,"lon":-111.114805,"icon":""}]} |
Location: 00/11-29-036-08W4/0 | |
Location Alias: 00/11-29-36-08 W4M | |
Location Alias 2: 00/11-29-036-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 08 | |
Section: 29 | |
County/Municipality: Special Areas No. 4 | |
Well Name: FCPI PROVOST 11-29-36-8 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0139160 | |
License Date: 1989-03-08 | |
License Status: RecCertified | |
Spud Date: 1989-03-10 | |
Final Drill Date: 1989-03-14 | |
Well Total Depth: 1068.00 m | |
Surface Hole Latitude: 52.122915 | |
Surface Hole Longitude: -111.114805 |
Date | Event |
---|---|
1989-03-08 | Obtained License |
1989-03-11 | Surface Casing Operation Performed |
1989-03-14 | Finished Drilling |
1989-03-14 | Well Log Performed |
1989-03-14 | Well Mode changed to Drilled and Cased |
1989-03-15 | Drill Stem Test Performed |
1989-03-16 | Production Casing Operation Performed |
1989-03-16 | Rig Released |
1989-04-14 | Perforation Treatment Performed - Jet Perforation |
1989-04-14 | Well Log Performed |
1989-06-07 | Well Began Production |
1989-06-07 | Well Fluid changed to Crude Oil |
1989-06-07 | Well Mode changed to Pumping |
1989-12-19 | Well Fluid changed to Crude Oil |
1989-12-19 | Well Mode changed to Suspended |
1990-04-30 | Well Log Performed |
1990-05-02 | Perforation Treatment Performed - Cement Squeeze |
1990-05-04 | Perforation Treatment Performed - Jet Perforation |
1990-05-04 | Well Log Performed |
1990-05-05 | Well Fluid changed to Crude Oil |
1990-05-05 | Well Mode changed to Pumping |
1994-11-01 | Well Fluid changed to Crude Oil |
1994-11-01 | Well Mode changed to Suspended |
1996-07-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-07-14 | Plug Back Performed |
1996-07-14 | Well Log Performed |
1996-08-01 | Well Abandoned |
1996-08-01 | Well Fluid changed to Crude Oil |
1996-08-01 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-04-14 | Perforation | 1031.50 | 1035.00 | 13 |
1990-05-02 | Cement Squeeze | 1031.50 | 1035.00 | 0 |
1990-05-04 | Perforation | 1031.50 | 1032.70 | 13 |
1996-07-14 | Packing Device Capped w/Cement | 1017.00 | 1025.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 4248 | 0.0 | 0.0 | 0.0 |
1990 | 5235 | 0.0 | 0.0 | 0.0 |
1991 | 8314 | 0.0 | 0.0 | 0.0 |
1992 | 8537 | 0.0 | 0.0 | 0.0 |
1993 | 8379 | 0.0 | 0.0 | 0.0 |
1994 | 5480 | 0.0 | 0.0 | 0.0 |
For data sources see[5]